Networked Embedded and Control Systems WP2007-08 ICT Call 2 Objective ICT-2007.3.7 ICT National Contact Points Mercè Griera i Fisa Brussels, 23 May 2007.

Slides:



Advertisements
Similar presentations
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Advertisements

Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
1 From Grids to Service-Oriented Knowledge Utilities research challenges Thierry Priol.
“Challenges and Methodologies
TSD A STRATEGY FOR DESIGN, ENGINEERING & ADVANCED MANUFACTURING.
1 ICT R&D&Innovation in Europe A market of more than 660 Billion Euro –Largest market world wide, (~34%) EU produces 23% of the world ICT value added –ICT,
Annie Lalé of SQUARIS  FP7 Themes Relevant for Safety and Security  Focus of Research Projects in Emergency and Disaster Management  ICT Themes in FP7.
GENI: Global Environment for Networking Innovations Larry Landweber Senior Advisor NSF:CISE Joint Techs Madison, WI July 17, 2006.
The Network of the Future European Research in FP7 Rainer Zimmermann Head of Unit “Future Networks” European Commission DG Information Society and Media.
Prepared By: Kopila Sharma  Enables communication between two or more system.  Uses standard network protocols for communication.  Do.
FP6 Thematic Priority 2: Information Society Technologies Dr. Neil T. M. Hamilton Executive Director.
Provisional draft 1 ICT Work Programme Challenge 2 Cognition, Interaction, Robotics NCP meeting 19 October 2006, Brussels Colette Maloney, PhD.
6th Framework Programme Thematic Priority Aeronautics and Space.
Future Internet Business Collaboration Networks in Agri-Food, Transport & Logistics Short introduction webinar, 24 July 2014 Sjaak Wolfert Project Coordinator.
Tanenbaum & Van Steen, Distributed Systems: Principles and Paradigms, 2e, (c) 2007 Prentice-Hall, Inc. All rights reserved DISTRIBUTED SYSTEMS.
Distributed Real-Time Systems for the Intelligent Power Grid Prof. Vincenzo Liberatore.
Mercè Griera i Fisa Smart Cities & Sustainability DG CONNECT – European Commission Smart Cities & Communities.
Envisioned Role for NTI Concerning ITS Deployment in Egypt by Dr. Mahmoud EL-HADIDI Professor of Telecommunications at Cairo U & Consultant at NTI 3 rd.
FET – Proactive Future and Emerging Technologies F1: FET – Proactive ICT Forever Yours - ICT “ designing for longevity,
Tufts Wireless Laboratory School Of Engineering Tufts University “Network QoS Management in Cyber-Physical Systems” Nicole Ng 9/16/20151 by Feng Xia, Longhua.
EF on IST in FP6 in Greece Information Day Athens-Thessaloniki, December 2002 The IST Priority in FP6 Erastos Filos
Brussels, 1 June 2005 WP Strategic Objective Embedded Systems Tom Bo Clausen.
NCP Infoday, Brussels, 23 June 2010 NCP Infoday ICT for Mobility Future ICT Work Programmes Helen Köpman ICT for Transport European Commission Directorate-General.
Energy efficient sensor networks SRA Ambient Intelligence 2008.
ICT-NCP Meeting 12 May 2009 Dr. Jorge Pereira DG INFSO G3 Embedded Systems and Control
IST programme Cultural Heritage in Tomorrow ’s Knowledge Society FUTURE PLANS FP6 Cultural Heritage in Tomorrow ’s Knowledge Society FUTURE PLANS FP6 RRRESE.
Linked-data and the Internet of Things Payam Barnaghi Centre for Communication Systems Research University of Surrey March 2012.
1 FP7 ICT Work Programme Update NCP Meeting, 12 May 2009.
FP IST-5 Research Networking Testbeds Maria F. Ramalho 2 June 2005.
NCP meeting - September 17, 2004 – WP - 1 The WP revision for 2005 : some indications NMP Programme « Thematic Priority 3 »
FET – Proactive Future and Emerging Technologies F1: FET – Proactive Embodied Intelligence - ICT “ physically embodied.
The roots of innovation Future and Emerging Technologies (FET) Future and Emerging Technologies (FET) The roots of innovation Proactive initiative on:
Networks Of Mobile Arbitrary Devices (NOMADs) Miroslaw Malek Humboldt-University Berlin, Germany
Accessible and Inclusive ICT Call2 European Commission, DG Information Society and Media ICT for Inclusion Unit (H3) Challenge 7 NCP meeting 23 May 2007.
WP Strategic Objective Networked Audio Visual Systems and Home Platforms.
Introduction Infrastructure for pervasive computing has many challenges: 1)pervasive computing is a large aspect which includes hardware side (mobile phones,portable.
ARTEMIS - Strengthening Embedded Systems R&D ARTEMIS Information Meeting – Copenhagen February 26, 2009 Jan Madsen, DTU Informatics.
Agency for International Science and Technology Development Programmes in Lithuania IST IN FP6: COVERAGE AND MAIN TARGETS Dr. Rimantas Skirmantas International.
Department of Electronic Engineering Challenges & Proposals INFSO Information Day e-Infrastructure Grid Initiatives 26/27 May.
Information Society and Media Directorate-General Unit Grid Technologies NCP Info Day Call5 - Brussels, 02 June – Advanced Grid Technologies,
Call 5 National Contact point Briefing, Brussels, 12 May 2009 INFSO FET Ralph Stübner Future and Emerging Technologies Objective ICT : Towards.
1 CALL 6 Key Action IV Introduction and Action Lines: IV.1.2, IV.2.1, IV.2.2, IV.2.4 Brussels, 16. Jan 2001 Colette Maloney European Commission.
MANISH GUPTA. Presentation Outline Introduction Motivation Content Expected Impact Funding Schemes & Budget.
The EU framework programme for research and innovation.
Lieve Bos European Commission DG CNECT Innovation Unit (F2) Parallel Session ICT-34 Pre-Commercial Procurement Open.
1 An initiative developed in the framework of the START project supported by the European Commission (DG InfSo) START IST SSA.
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
Internet of Things. IoT Novel paradigm – Rapidly gaining ground in the wireless scenario Basic idea – Pervasive presence around us a variety of things.
Jacques Bus Head of Unit, DG INFSO-F5 “Security” European Commission FP7 launch in the New Member States Regional on-line conference 22 January 2007 Objective.
VO JointCall 2 6 th May 04 1 IST Priority - National Contact Point meeting Brussels, 6 th May nd Joint Call IST/NMP Evangelos OUZOUNIS European Commission.
NCP Info DAY, Brussels, 23 June 2010 NCP Information Day: ICT WP Call 7 - Objective 1.3 Internet-connected Objects Alain Jaume, Deputy Head of Unit.
Accessible and Inclusive ICT European Commission, DG Information Society and Media ICT for Inclusion Unit (H3) Challenge 7 ICT Call 2 Information day Brussels,
Towards the New Framework Programme Vienna, 26 March 2001 Horst Forster European Commission WI0.
Technology-enhanced Learning: EU research and its role in current and future ICT based learning environments Pat Manson Head of Unit Technology Enhanced.
Information Society and Media Directorate-General – European Commission Unit Grid Technologies IST-Call 5 Grid Information Day - Brussels, 30 May 2005.
1 FP7 ICT Call 7: Cognitive Systems and Robotics NCP Infoday Brussels, 23 June 2010 Unit E5 - Cognitive Systems, Interaction, Robotics DG Information Society.
IoT: Manufacturing Factories of the Future Patrick Kennedy.
ARTEMIS SRA 2016 Trust, Security, Robustness, and Dependability Dr. Daniel Watzenig ARTEMIS Spring Event, Vienna April 13, 2016.
ARTEMIS Industry Association Title Presentation - 1 UR:BS eUropean Renaissance: Beyond Smart cities José J. De las Heras/Miguel Peñate.
IoT R&I on IoT integration and platforms INTERNET OF THINGS
FET Proactive Initiative: “The Disappearing Computer 2” Thomas Skordas.
Advancing National Wireless Capability Date: March 22, 2016 Wireless Test Bed & Wireless National User Facility Paul Titus Department Manager, Communications.
FP7 – ICT Theme a motor for growth, competiveness and social inclusion
MetaOS Concept MetaOS developed by Ambient Computing to coordinate the function of smart, networked devices Smart networked devices include processing.
FET Plans FET - Proactive 1.
ICT NCP Infoday Brussels, 23 June 2010
Presentation for information days Units involved:
(Draft) Workprogramme
ICT in Framework Programme 7
Coordination and Support Actions
Presentation transcript:

Networked Embedded and Control Systems WP ICT Call 2 Objective ICT ICT National Contact Points Mercè Griera i Fisa Brussels, 23 May 2007

Networked Embedded and Control Systems Objective 3.7: Networked Embedded and Control Systems Today electronics and software are embedded in billions of devices and objects. Pervasive data will change how these intelligent objects dynamically pool information, cooperate under severe constraints and reliably interact and control the physical world Three target Outcomes: 1) Middleware for seamless connectivity and inter-working 2) Cooperating Objects and Wireless Sensor Networks 3) Control of large-scale, complex distributed systems

Networked Embedded and Control Systems 1 st Target Outcome: Middleware (1/3) New Middleware platforms that - support composability, scalability, minimal power consumption –provide open interfaces to third parties for application development –Priority only on selected application domains, i.e. : Private/home/building, Nomadic, Manufacturing Research should aim at –programmability, dynamic reconfiguration and ontologies –Services enabling privacy, security and trust –Predictable connectivity and QoS Support in addition to STREPS also CSAs for –Industry-driven initiatives for sharing software source code –Standardisation in broader embedded systems domain

Networked Embedded and Control Systems 2 nd Target Outcome: Cooperating Objects and Wireless Sensor Networks (2/3) Broad definition : “Objects” are entities that –cooperate spontaneously / jointly execute a given task –operate under severe resource constraints Research should aim at: –New methods and algorithms to support cooperation schemes –HW/SW platforms including OS, kernels –Programming abstractions to facilitate application development –Support/tools for commissioning, deployment, maintenance

Networked Embedded and Control Systems co-existence-> (ad-hoc) communication -> cooperation-> and control/coordination (if needed) - > common goal Gain efficiency through coordinating efforts

Networked Embedded and Control Systems 2 nd Target Outcome: Cooperating Objects and Wireless Sensor Networks (2/3) Further research challenges : - scalability, dynamic resource recovery –semantics for object/service definition –incorporating advanced control aspects –security and privacy-relevant features Type of research –generic, BUT driven by an entire class of real-world applications. Projects should ‘prove’ feasibility and scaling International cooperation with USA and other countries is encouraged (via STREPS)

Networked Embedded and Control Systems 3 rd Target Outcome : Control of large-scale complex distributed systems (3/3) “Large-scale systems” like - Electrical grids, airports, seaports –Infrastructures for energy supply –Manufacturing plants Known but difficult issues to be addressed - Performance, robustness, availability. Safe, secure and predictable behavior - Integration of energy generation, transport and consumption

Networked Embedded and Control Systems Public Public and/or Private

Networked Embedded and Control Systems 3 rd Target Outcome: Control of large-scale complex distributed systems (3/3) Research should aim at: - Modeling and design methods, reconfigurable architectures, and scalable algorithms – Mastering complexity and uncertainty e.g. delays, bandwidth limitations in communication links, fading/distorted links, unavailability of nodes – Closing the control loop over (wireless) sensor networks Interdisciplinary consortia required –Applying computer, systems, control and communications science and engineering to large-scale complex systems Support in addition to STREPS also CSAs for –International cooperation with the USA, Russia, Western Balkans

Networked Embedded and Control Systems Expected Overall Impact –Prepare for the needs of tomorrow’s large scale infrastructures –Control of 10 times more complex systems at 10% of today’s effort –100% available plants whilst reducing maintenance cost and reducing accidents –Seizing new markets by providing new services tailored to customer needs –Easy and low cost deployment for monitoring of the environment and natural resources

Networked Embedded and Control Systems Instruments and provisional Budget Focus 1: Middleware –STREPs only –CSA for source code sharing and for standardisation initiatives Focus 2: Cooperating Objects and WSNs –STREPs only –NoE Focus 3: Control of large-scale systems –STREPs only –CSA for international cooperation Total for this objective in call 2 : 47 M€* Total for this objective in call 2 : 47 M€* STREPS: 41 M€* - NoE: 4 M€* - CSAs: 2 M€* STREPS: 41 M€* - NoE: 4 M€* - CSAs: 2 M€* * amount to be confirmed after the Commission decision on 2008 budget proposal

Networked Embedded and Control Systems Related areas in FP7 Middleware : Cooperating objects and sensor nets: - ICT /2.2: Cognitive Systems, Interaction, Robotics (Call 3) - ICT : ICT for Cooperative Systems (transport) Microsystems Large scale systems and control : - ICT-SEC : Critical Infrastructure Protection (Joint Call) - ICT /2.2: Cognitive Systems, Interaction, Robotics (Call 3) - ICT : ICT for Environmental Management and Energy Efficiency - ICT x : FET (e.g. embodied intelligence, complex systems) (Call 3) Outside ICT : –Manufacturing (NMP programme, MANUFUTURE platform), –Energy, production & distribution (Smart GRIDS and construction platforms)

Networked Embedded and Control Systems Contacts and further information General info on FP7: General info on FP7: ICT: ICT: