Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland,

Slides:



Advertisements
Similar presentations
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Advertisements

Renewable Resources Development Report California Energy Commission Business Meeting November 19, 2003 Ann Peterson Project Manager Technology Systems.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Energy, Society, and the Environment Unit 3 Energy Economics.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
1 Overview of Allocating Revenue Requirements Based on Shares of Marginal Costs May, 2012.
1 Western Wind and Solar Integration Study Site Selection Analysis 5/14/2008.
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
VINCE GRIFFIN VICE PRESIDENT ENVIRONMENTAL & ENERGY POLICY INDIANA CHAMBER OF COMMERCE.
Capacity Factor Summary 1. Note: Figure only includes the 20 countries with the most installed wind capacity at the end of 2007 Wind as a Percentage of.
Sixth Northwest Conservation & Electric Power Plan Proposed Aeroderivative Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
March 19, 2009 Sixth Northwest Conservation & Electric Power Plan Central-station Solar Photovoltaic Resource Assessment Jeff King Northwest Power and.
Rooftop Solar Photovoltaic Seventh Plan Approach to Analysis CRAC November 13, 2014.
Approach to the Wind Resource Assessment for the Sixth Power Plan Northwest Power & Conservation Council Generating Resources Advisory Committee August.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
February 10, 2008 Sixth Northwest Conservation & Electric Power Plan Woody Biomass Resource Assessment Jeff King Northwest Power and Conservation Council.
Avoided Costs of Generation
Global WINDPOWER Chicago, Illinois Assessment of Potential Improvements in Large-Scale Low Wind Speed Technology Joseph Cohen Princeton Energy Resources.
Aaron Townsend National Renewable Energy Laboratory October 28, 2013 Colorado Rural Electric Association Energy Innovations Summit Energy Storage in the.
RTWG Report to TAC August 5, 2010 Howard Daniels.
Sixth Northwest Conservation & Electric Power Plan Proposed Combined-cycle Power Plant Capital Cost Assumptions Jeff King Northwest Power and Conservation.
New Jersey’s Clean Energy Program: Solar Market Update Charlie Garrison Solar Transition Meeting 2/16/2012.
California Energy Commission 2015 IEPR Self-Generation Forecast Sacramento, CA 7/07/2015 Asish Gautam Demand Analysis Office Energy Assessments Division.
Sixth Northwest Electric Power and Conservation Plan Generating Resource Assessments Jeff King Northwest Power and Conservation Council Portland, OR July.
Renewable Energy Wind Energy Liang Li Qing Yu Samuel Marin Calvo Department of Technology and Built Environment, University of Gävle, Gävle, Sweden.
Assistant Secretary of the Navy (Energy, Installations & Environment) 1 Department of the Navy Renewable Energy Program Office (REPO) Overview Monica DeAngelo.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
Preliminary Results with the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
Sixth Northwest Conservation & Electric Power Plan Resource Development Parameters Jeff King Northwest Power and Conservation Council Generating Resources.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Wholesale Power Price Forecast 01/28/03 Current Trends Update Jeff King January 31, 2003.
December 9, 2008 Sixth Northwest Conservation & Electric Power Plan Integrated Coal-fired Gasification Plant Resource Assessment Jeff King Northwest Power.
Sixth Northwest Conservation & Electric Power Plan Proposed Heavy-duty Combustion Turbine Planning Assumptions Jeff King Northwest Power and Conservation.
Wholesale Electricity Price Forecast Draft Current Trends Forecast Jeff King Conservation Resource Advisory Committee September 30, 2002.
Sixth Northwest Conservation & Electric Power Plan Geothermal Power Generation Resource Assessment Jeff King Northwest Power and Conservation Council Power.
Northwest Power and Conservation CouncilProCost Version 2.2 RTF July 2007.
Southwest Power Pool ITP-20 Generating Resources May 25, 2010.
Northwest Power and Conservation Council A Look At The Council’s Conservation Planning Methodology and Assumptions A Look At The Council’s Conservation.
Winter Power Supply Adequacy/Reliability Analysis Power Committee Briefing October 17, 2001.
Uncertainty in the Regional Portfolio Model Michael Schilmoeller for the Northwest Power and Conservation Council Generation Resource Advisory Committee.
Northwest Wind Integration Action Plan Jeff King Northwest Power & Conservation Council June 27, 2007.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
American Wind Energy Association Wind in The Portfolio Mike Jacobs American Wind Energy Association Managing Your Energy Portfolio in a Greener World January.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Jobs in Renewable Energy. Portland State University November 8 th, 2010.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
CPUC Avoided Cost DRAFT Results CEWG Workshop May 31, 2016 Brian Horii, Senior Partner Snuller Price, Senior Partner Zach Ming, Consultant Kiran Chawla,
Biomass GEM assumptions Erwan Hemery 12 May 2009.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
California Energy Commission Cost of Generation Model: Cost Competition and Technology Trends Renewable Energy Transmission Initiative 2.0 Plenary Group.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
“Other” Cost Estimates
Jeff King Northwest Power and Conservation Council
Overview of Northwest Wind Integration Action Plan
Study Results Drought Scenario Study
Jeff King Northwest Power and Conservation Council
Presentation transcript:

Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland, OR August 21, 2008

2 Wind resource cost elements Capital cost Wind plant development and construction cost (uniform) Transmission development and construction cost (WRA-specific) Operating costs Fixed wind plant operation and maintenance (uniform) Fixed transmission operation and maintenance (WRA-specific) Variable wind plant operation and maintenance (uniform) Variable transmission operation and maintenance (WRA-specific) System integration costs Regulation & load following Storage & shaping

August 21, Windpower Cost Assumptions (2006 dollar values) 5 th Plan (2004) Biennial Report (2006) Preliminary 6 th Plan (Q1 2008) Proposed 6 th Plan Overnight wind plant development and construction cost ($/kW) $1170$1500$1650$1950 Transmission ($/kW/yr)$23Unchanged$20To be addressed at later GRAC Fixed O&M ($/kW/yr)$23$30$22 To be addressed at later GRAC Learning effects on real fixed costs (20 yr average) -2%/yrNone in near- term See following slide To be revisited at later GRAC Variable O&M ($/MWh)$1.16$1.50$1 To be addressed at later GRAC Regulation & Load- following ($/MWh) $ Unchanged$ Initial discussion to follow

August 21, Preliminary thinking on forecast construction cost escalation (to be revisited at later GRAC) Escalation continues at declining rate through 2009; levels off Real costs decline to ~ 130% of 2004 values Recent cost escalation 2015 > Resumption of historical real cost reduction

August 21, Normalizing reported plant costs NPCC database contains reported plant costs (estimates or completion costs) for 36 WECC projects totalling 4450 MW present Reported costs were normalized to "overnight" 2006 dollar values Unless otherwise stated, reported costs are assumed to be construction costs less project development cost and financing fees. The cost vintage is assumed to be the year reported or, for completion costs, the beginning of 12 mo construction period (one year prior to service year) Overnight (instantaneous) construction cost were backcast using appropriate financing (COU, IOU, IPP) with the Council's MICROFIN model. Project development cost of 1.3% of total capital cost was added to the estimate Capacity-correlation: Slight (12%) negative correlation of cost to project capacity was observed Capacity-weighting was approximated by rounding to nearest 100 MW and plotting each 100 MW multiples separately.

August 21, Normalized utility-scale wind project cost Proposed 6 th Plan draft: $1950/kW "Overnight", 2006$, 2009 service 5 th Plan Biennial Assessment Prelim 6 th Plan

August 21, Other recent surveys and estimates CECComparative Costs of California Central Station Electricity Generation Technologies Jun 07$1900"Instant" cost, 2006$ EPRIEngineering & Economic Evaluation of Renewable Energy Technology Jun 07$ MW Total plant (overnight) cost, Dec 06 $ LBLAnnual Report on U.S. Windpower Installation, Cost and Performance Trends: 2006 May 07$1480 (range $ ) Reported costs, 16 U.S. projects, 1326 MW LBLAnnual Report on U.S. Windpower Installation, Cost and Performance Trends: 2007 May 08$1710 (range $ ) Reported costs, 16 U. S. projects, 7600 MW ($1660 in 2006$) USDOE20% Wind Energy by 2030May 08$ $, overnight (Black & Veatch) Windpower Monthly Annual power cost comparisonJan 07€ ) Reported costs, 40 global projects, 3400 MW Windpower Monthly Annual power cost comparisonJan 08€ ; range $ ) Reported costs, 40 global projects, 3000 MW

August 21, Comparison to other surveys & estimates WM LBL DOE WM LBL EPRI CEC Prop. Dft 6 th Pln