EGEE-III INFSO-RI-222667 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks France Grilles The French NGI R. Rumler,

Slides:



Advertisements
Similar presentations
STEINBUCH CENTRE FOR COMPUTING - SCC KIT – University of the State of Baden-Württemberg and National Laboratory of the Helmholtz Association.
Advertisements

INFSO-RI Enabling Grids for E-sciencE Update on LCG/EGEE Security Policy and Procedures David Kelsey, CCLRC/RAL, UK
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD June 2009 COD-20 Hélène Cordier COD-20, CNRS-IN2P3, CSC.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Romanian SA1 report Alexandru Stanciu ICI.
Enabling Grids for E-sciencE EGEE III Security Training and Dissemination Mingchao Ma, STFC – RAL, UK OSCT Barcelona 2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 – Training & Induction Robin McConnell,
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 Meeting Prague, 28 November 2007 Centrale Recherche S.A., Ecole Centrale Paris.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ?? Athens, May 5-6th 2009 Community Support.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROD model assessment ROC UKI John Walsh.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA3 status, news, actions EGEE’07 Gergely.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Monitoring and enforcement of Service Level Agreements John Shade EGEE-II / EGEE.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Bazaar Vision Ideas of RC/VO coordination,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Quality Plan for EGEE III Geneviève.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
Enabling Grids for E-sciencE EGEE-III INFSO-RI EGEE Training Follow-on survey 2009 Conducted on past EGEE training course participants 120 respondents.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD June 2009 COD-20 Parallel sessions Hélène Cordier COD-20, CNRS-IN2P3,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE’09 SSC Workshop SAFE Project Proposal.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III Proposal Draft Summary of activity.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Fergusson, Emidio Giorgio, Gergely.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Business SSC for EGI SSC Workshop: Preparing.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks DSA1.4 – Objectives and Status Ioannis Liabotis.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Regional Dashboard Cyril L’Orphelin - CNRS/IN2P3.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC Security Contacts R. Rumler Lyon/Villeurbanne.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks South-West Federation Gabriel Amorós (CSIC)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Christos Kanellopoulos Activity Manager.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 02.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 28.
WLCG Laura Perini1 EGI Operation Scenarios Introduction to panel discussion.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks John Gordon SA1 Face to Face CERN, June.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Resource Allocation in EGEEIII Overview &
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks User Support for Distributed Computing Infrastructures.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks COD-17
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks UK-Ireland-France Regional Participation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2: Dissemination Outreach & Communication Hannelore Hämmerle – NA2 Activity Manager.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC FR - On the way to the EGI/NGI structure.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1 & SA2-ENOC Interactions status and plans.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Pole 2 : Restructuration of the OPS Manual.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Application Porting Support Gergely Sipos,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Security aspects (based on Romain Wartel’s.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Astrophysical Cluster Session Claudio Vuerli,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks UK/I NA2 federation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IT ROC: Vision for EGEE III Tiziana Ferrari.
Ian Bird LCG Project Leader Summary of EGI workshop.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MyEGEE David Horat (
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operational Tools Advisory Group - Transition.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Application Porting Support SSC and proposal Gergely Sipos
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Training in EGEE-III and beyond Robin McConnell,
Presentation transcript:

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks France Grilles The French NGI R. Rumler, CNRS/IN2P3 WLCG Collaboration Board meeting,

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 Contents Current situation near the end of EGEE French NGI, recent events Organisational structure Staffing Role of the tier-1 Conclusion, concerns, issues

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 French NGI, recent events The “Institut des Grilles” (IdG) of CNRS is the base of the French NGI The high level management of the French Production Grid will be handled by the IdG The French NGI is called “France Grilles” (name given during the first transition meeting from an EGEE ROC to the NGI in October) Legal structure: GIS (Groupement d’Intérêt Scientifique) At the beginning of the current week the organisational structure of the NGI has been outlined, see following slides

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, France Grilles, organisational structure 1 Comité de Pilotage Directeur Gestionnaire Ingénieur sécurité Conseil Scientifique Du Groupement Relations EGIOpérations Communication -Dissémination ApplicationsFormation Comité des directeurs Développements opérationnels Développements applicatifs Comité des utilisateurs 4/9

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, France Grilles, organisational structure 2 Operations Responsible And Deputy Site representatives Subtask responsibles Developments for Operations 5/9

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 Staffing For all currently defined subtasks and functional entities of the NGI the corresponding key persons are already designated Most of them have permanent contracts BUT: most of them are delegated for their “grid job” by their home institution and don’t formally belong to the IdG (nor to “France Grilles” which cannot act as a legal body anyway)

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 The role of the Tier-1 The deputy director of the IdG who manages the production grids is also the director of the tier-1 Operations responsible and deputy are tier-1 staff Regional grid operators (ROD) are tier-1 staff Training coordination for the IdG is done by tier-1 staff Grid activities in the Rhône Alpes region are promoted by tier-1 staff (public research, industry applications) Security, accounting, monitoring, and various other tasks are led by people from tier-2 centres IN2P3 is involved in various non HEP applications, mainly at other places than the tier-1 (but also there)

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 Conclusion, concerns, issues In a previous pre-GDB presentation in May on the NGI topic I said being optimistic about the switch to the French NGI structure Even if a concrete transition plan still has to be elaborated This is still true, particularly as things start moving And the actors to fill the existing rough outline of the plan are known Without EGI the risk of having parallel communities HEP versus non HEP is high Will the GDB be sufficient to coordinate operations? Will a successor to the EGEE SA1 coordination meetings be necessary? The situation for the persons with temporary contracts is still uncertain, even if there’s some hope to be able to propose permanent ones to most of the key people Since May some have already obtained permanent contracts

Enabling Grids for E-sciencE EGEE-III INFSO-RI R. Rumler, WLCG CB meeting CERN, /9 Links Pre-GDB presentation on the same topic: slides&confId= st French Transition meeting’s agenda (in French, sorry):