Portable Steel Barrier. Company Background Hill & Smith Holdings – based in UKHill & Smith Holdings Purchased Voigt & Schweitzer, Inc in 2008 Voigt &

Slides:



Advertisements
Similar presentations
Roadside Barriers RDG Chapter 5.
Advertisements

Potential Solutions Goals for Design – What are we concerned about? –Primary Goal: Get the deck on successfully Stability during deck pour Stability during.
Actions and Retrofit of Post Earthquake-Damaged Bridges
Installing Permanent Traffic Counters Warm Springs Reservation 2004.
Florida Department of Transportation T EMPORARY B ARRIER S YSTEMS FDOT Contacts: District Construction Marshall Douberley marshall.douberley.
Ying Tung, PhD Candidate
M.A.S.H.: The New Safety Hardware Crash Testing Criteria
“You Could Learn a Lot About Guardrail From a Dummy…
Florida Department of Transportation T EMPORARY C RASH C USHIONS FDOT Contacts: District One Construction Marshall Douberley marshall.douberley.
FEA of Wind Turbine Tower Martin Knecht. The Problem FEA modeling of a wind turbine tower. Analysis: –Stress –Deflection Want to prevent –Yielding –Excessive.
Pallet Stop - Stop Stock Damage.. Introduction to Pallet Stop Stock stored on the floor gets more damage than stock off the ground. Typically 25% of warehouse.
Oklahoma’s Experience with Wire Rope Safety Fence.
6TH ANNUAL CONFERENCE. The Use of Temporary Steel Barriers in Construction Zones By Don Pyde Product Manager Trinity Highway Products.
Learning Objectives Understand the OSHA requirements for fall protection during steel erection Understand the OSHA requirements for fall protection during.
Fiberglass Pads and Mats for Heavy Equipment
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
Traffic Counter Comparison on 2 Lane Roadways Rubber Tube Temporary Counter Sites Vs Wire Loop Permanent Counter Sites.
“See-Through” Bridge Rails
SR-528 (Beach Line)/ SR-3 (Courtenay Blvd) Emergency Bridge Repair January 21, 2011.
AASHTO Subcommittee on Design Meeting June 10, 2004 NCHRP Project 3-69 Design of Construction Work Zones on High-Speed Highways Kevin M. Mahoney Penn State.
41 point total.
Global Lift Corp ADA Laws & Commercial Series Lifts.
Critical Length of Grade
Masonry Bracing Life Safety Considerations During Construction of Masonry Walls.
Hoover Dam Bridge. Creeping closer, 900’ above the Colorado River, the two sides of a $160 million bridge at the Hoover Dam slowly takes shape The bridge.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Spring 2013 Section Engineers Conference March 5, 2013 Guardrail Items Terry Chism, Div of Const.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Milton-Madison Bi-State Travel Demand Model Rob Bostrom Planning Application Conference Houston, Texas May 19, 2009.
Chapter 4 Measuring Concrete Work
A Brief Overview Midwest COOLING TOWERS, INC. A Full Checklist of Products & Services for Your Cooling Tower Project Quality Service Integrity Value Quality.
4136 S. Mc Cann Springfield, Mo
Product and Service Design
An Introduction to Pandrol’s PANGUARD System
Office of Highway Safety Highway Factors David S. Rayburn.
PowerPoint Presentation  Section 5.1  Pages
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Created by Andrew Poulios6/18/ Dodge Journey Body Structure Equipment and Tool Institute June 18, 2008 Andrew Poulios Body Structures Engineering.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
NCHRP 350 UPDATED. NCHRP 350 Historical Review Document Source Year Issued Number of Pages Test Vehicle & Weight HRB # lb. car NCHRP #115.
Reconstruction, Upgrade and Repair Reconstruction, Upgrade and Repair Midwest COOLING TOWERS, INC.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Car key Reflection How is a car key like a reflection? A car key and a reflection are linked because…
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Technology Solutions for Tolling and Traffic Management N Video Detection Technology and Marketplace Michael Wieck Business Development Manager, Roadway.
Pennsylvania Motor Vehicle Safety Inspections A Decentralized Approach 1.
Copyright © 2009 Rockwell Automation, Inc. All rights reserved. 800FC Pendant Stations Steve Litzau – Product Manager.
April 4, 2011 ITE Technical Conference Lake Buena Vista, Fl Implementation of AASHTO’s Manual for Assessing Safety Hardware (MASH) 2016 Update from the.
Session 10 Purdue Research Updates Use of railroad flatcars as bridges on low-volume roads.
DIAPHRAGM WALLS.
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
MASH implementation Welcome April 2016 SCOHTS Meeting.
Santa Cruz avenue sidewalks Project
ODOT’s Seismic Policy One Year Later
ABCD What’s New In Bridges
Implementation of MASH
Transparency A.
Bumper Trajectories During High-Speed Impacts with 6-in. Curbs
Toledo I-280 Crane Accident
Experience the StructureCast Advantage!.
Materials Innovation Hub Challenge Martin Richardson
Toledo I-280 Crane Accident
Group 1 Group 2 Group 3 Group 4 61 m 35 m 52 m 35 m 63 m 40 m 54 m
Section 10.5 The Dot Product
Group 1 Group 2 Group 3 Group 4 61 m 35 m 52 m 35 m 63 m 40 m 54 m
NRRA Pavement Workshop 2019
Title of Presentation dd.mm.yyyy 2-in-1 Product Solution Temporary & permanent application with one product DELTA BLOC - We develop.
Georgia ATSSA Chapter Meeting: MASH Implementation
Copyright © 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 3 Introduction to Physical Design of Transportation Facilities.
Presentation transcript:

Portable Steel Barrier

Company Background Hill & Smith Holdings – based in UKHill & Smith Holdings Purchased Voigt & Schweitzer, Inc in 2008 Voigt & Schweitzer has 9 facilities in the US Hill & Smith, Inc – based in US

US Locations

a steel barrier system used for temporary or permanent applications What is Zoneguard ??

developed specifically for the US market extensive crash testing

Tested Configurations Standard System Anchored at ends only Minimum Deflection System Anchored every 33’-4” MASH – Test 3-10 Small Car NCHRP 350 – Test kg pickupNCHRP 350 – Test kg pickup MASH – Test 3-11 – 2270 kg pickupMASH – Test 3-11 – 2270 kg pickup NCHRP 350 – Test kg truckNCHRP 350 – Test kg truck NCHRP 350 – Test kg PickupNCHRP 350 – Test kg Pickup MASH – Test 3-11 – 2270 kg pickupMASH – Test 3-11 – 2270 kg pickup

what are the key design features of Zoneguard? high performance (TL-4) lightweight speed & ease of installation

< 61 lb/ft = 750 ft on a truck

50’-0 sections

speed joints

mountable foot

anchoring pockets

Rubber Pads

lifting points

assembly sequence

curves & flares

Indiana DOT, I-65 bridge deck repairs

Other Benefits Less trucks entering and leaving workzone Emission reductions – 80% + fewer trucks Possibility to stripe the foot

Summary alternative to traditional concrete barriers temporary or permanent installations <61 lb/ft = 750 feet per truck ease of installation

questions ?