Visit Univ. 16 April 2010 Committed to Connecting the World WTSA-08 Resolution 76: A snap view on Conformance and Interoperability Paolo Rosa Workshops.

Slides:



Advertisements
Similar presentations
International Telecommunication Union Accra, Ghana, June 2009 Conformance and Interoperability Testing: (WTSA-08) Resolution 76 Joshua Peprah Director,
Advertisements

ISO/IEC Toolbox for Conformity Assessment
1 The ITU Conformity & Interoperability Programme beyond WTSA-12 Malcolm Johnson Director, Telecommunication Standardization Bureau.
International Telecommunication Union Committed to connecting the world 1 WTSA-08 Resolution 76, Implementation status and ITU mark for equipment and services"
World Telecommunication Development Conference May to 4 June 2010, Hyderabad, India Programme 1 Resolution 47 Riccardo Passerini Telecommunication.
Ing. José Guillermo Valdivia Rojas Director of Control and Supervision
International Telecommunication Union Committed to connecting the world PCC.I - Cusco, Peru - May 5-8, WTSA-08 outcomes and ITU-T Resolution 76:
ITU Forum Bridging Standardization Gap – Brasilia, May 2008 Forum Accra June 2009 ITU-T Bridging Standardization Gap Forum Accra, 16 – 17 June 2009.
ATIS and Interoperability in the Africa Region Dr. Asok Chatterjee On Behalf of the Alliance for Telecommunications Industry Solutions (ATIS) July 30-31,
1 Conformity Assessment Activities Presented by Andrew Kwan ITU Consultant Conformity and Interoperability Training for ARB Region on Type Approval Testing.
International Organization
ITU Workshop on “Quality of Service and Quality of Experience of Multimedia Services in Emerging Networks” (Istanbul, Turkey, 9-11 February 2015) ITU Activities.
1Having confidence in certification CASCO Comms/ International Organization for Standardization.
International Telecommunication Union CHALLENGING POLICY STEPS TOWARDS IMPLEMENTING COMMON ALERTING PLATFORMS Orhan Osmani Emergency Telecommunications.
International Telecommunication Union Committed to connecting the world 1 "Resolution 76: a way to conformance and interoperability testing" Paolo Rosa.
Why SG 12 RG-AFR was created DANIEL K. WATURU MANAGER/TELECOMS COMPLIANCE COMMUNICATIONS COMMISSION OF KENYA CHAIRMAN/SG12 RG-AFR Workshop on Delivering.
Standards and innovation What is a standard? How do standards promote innovation? What is the role of governments and the UN?
The ITU-T activities for Conformity Assessment and Interoperability Paolo Rosa Workshops and Promotion Division Head, Workshops and Promotion DivisionTelecommunicationStandardizationBureau.
Geneva, 24 May nd Consultation Meeting on Action Line C8 “Cultural Diversity and Identity, Linguistic Diversity and Local Content ” ITU Work on Internationalized.
DOCUMENT #:GSC15-PLEN-51 FOR:Presentation SOURCE:ITU AGENDA ITEM:Plenary 6.10 Conformance and Interoperability Testing.
International Telecommunication Union Putting to the test ITU’s IPTV Standards ITU’s First Ever Interop Event on IPTV (20-23 July 2010) Paolo Rosa ITU.
International Telecommunication Union Committed to connecting the world 1 Conformity and Interoperability ITU’s Initiatives 2011 ICT Week and Commemoration.
International Telecommunication Union 1 The ITU-T Conformity and Interoperability program: WTSA-08 Resolution 76 and implementation status Paolo Rosa Workshops.
Lorenza Jachia UNECE Secretariat Working Party on Regulatory Cooperation and Standardization Policies Lorenza Jachia UNECE Secretariat 1 st Session of.
ITU Activities on Bridging the Standardization Gap (BSG) Vijay Mauree, ITU ITU Regional Workshop on Bridging the Standardization Gap (Yangon, Myanmar,
Yangon, Myanmar, November 2013 Setting up a National Standardization Secretariat (NSS) Vijay Mauree, Programme Coordinator ITU ITU Regional Workshop.
Nadi, Fiji, September 2009 An Implementation Approach to Action Plans on BSG Dinh Van Dzung, Ph.D. Deputy Director, Research Institute of Post and.
RANS - Moscow March 2010 Committed to Connecting the World WTSA-08 Resolution 76: Conformance and Interoperability Russian Association of Network and Services.
SUMMARY OF DISCUSSIONS AMONG AFRICAN SITES PRIOR TO THE WORLD BANK'S VIDEO- CONFERENCE: “OPEN STANDARDS FOR GOVERNMENT TRANSFORMATION” 17TH APRIL 2009.
Overview of the TSB Director ’ s Ad Hoc Group on IPR Telecommunication Standardization Bureau (TSB) International Telecommunication Union Place des Nations.
Guidelines for establishing a National Standardization Secretariat (NSS) for ITU-T Xiaoya Yang Head, WTSA Programmes Division ITU-TSB
International Telecommunication Union Accra, Ghana, June 2009 BRIDGING THE DIGITAL DIVIDE: EFFORTS OF GHANA Isaac Boateng Assistant Manager, Regulatory.
Paolo Rosa ITU ITU-T Standardization and other key ITU Activities La Havana, Cuba, 8-9 February 2011 WTSA-08 Resolution 76 and PP-10 Res. 177 on Conformity.
Consultation on C&I – Quito, 6 July 2010 Committed to Connecting the World 1 WTSA-08 Resolution 76: the ITU-T approach to Conformity Assessment and Interoperability.
Setting up a National Standardization Secretariat (NSS) Vijay Mauree, Programme Coordinator ITU Joint ITU-AICTO Regional Standardization Forum for Arab.
Working Party on Regulatory Cooperation and Standardization Policies (WP. 6)
Yangon City, Myanmar, November 2013 Wrapup and Closing Session Xiaoya Yang, ITU Ouseph Padickakudi, UNIDO Joint ITU-UNIDO Forum on Sustainable Conformity.
International Organization
International Telecommunication Union The ITU Conformity & Interoperability Programme Pillars 3 and 4 Sameer Sharma Senior Advisor ITU Regional Office.
International Telecommunication Union Committed to connecting the world Forum Accra June “WTSA-08 Resolution 76: a way to conformance and.
BDT, Havana 8-9 February, 2011 World Telecommunication Development Conference May to 4 June 2010, Hyderabad, India Programme 1 Resolution 47 Riccardo.
International Telecommunication Union Forum Fiji 16 September 2009 WTSA-08 Resolutions for Developing Countries and Asia-Pacific region Forum on: Implementation.
Approaches from other SDOs to Conformity and Interoperability, conformance databases Paolo Rosa Workshops and Promotion Division Head, Workshops and Promotion.
Bangalore, India,17-18 December 2012 Bridging the Standardization Gap (BSG) Toby Johnson, Senior Comms Officer, ITU Joint ITU-GISFI.
ITU Regional Standardization Forum for Asia-Pacific (Jakarta, Indonesia, October 2015) TTA’s activities on bridging standardization gap Kihun Kim.
ITU-T Activities in Bridging The Standardization Gap Vijay Mauree Programme Coordinator, TSB ITU ITU Regional Standardization Forum for Asia-Pacific (Jakarta,
ITU Activities on Bridging the Standardization Gap (BSG) Vijay Mauree, TSB ITU Joint ITU-AICTO Regional Standardization Forum for.
International Telecommunication Union Forum Quito 7 July 2009 Committed to connecting the world RELATIONSHIP BETWEEN INPUTS BY THE AMERICAS REGION TO WTSA-08.
Technology Services – National Institute of Standards and Technology Conformity Assessment ANSI-HSSP Workshop Emergency Communications December 2, 2004.
CARIBBEAN WORKSHOP ON E-GOVERNMENT BEST PRACTICES Port of Spain, Trinidad & Tobago, July 26-28, 2005.
1Johannesburg South Africa SMA May International Organization for Standardization.
HIGHLIGHTS  BACKGROUND  CHALLENGES IN DEVELOPING COUNTRIES  NEGATIVE IMPACT  THE PROPOSAL.
1 CONFORMANCE AND INTEROPERABILITY: PROMOTING CONFIDENCE AND SECURE END-TO-END CONNECTIVITY Presented by Bill McCrum Consultant ITUTelecommunicationStandardizationBureau.
Conformity Assessment Activities
Key Issues on Conformance & Interoperability (C&I)
ITU Activities on Bridging the Standardization Gap (BSG)
ITU Activities on Bridging the Standardization Gap (BSG)
ITU Work on Internationalized Domain Names
Conformity and Interoperability Training for ARB Region on Type Approval testing for Mobile Terminals, Homologation Procedures and Market Surveillance.
ITU-T ICT Conformity and Interoperability
The ITU Conformity & Interoperability Programme beyond WTSA-12
Bridging the Standardization Gap (BSG)
ITU Activities on Bridging the Standardization Gap (BSG)
The concept of the ITU conformity programme
Nicaragua and its position at the ITU's processes for assessing compliance and interoperability testing Ing. José Guillermo Valdivia Rojas Director of.
WTSA-08 Resolution 76: Conformance and Interoperability
Regional ITU Consultation on
Initiatives of TSB to implement WTSA-08 Resolutions
Malcolm Johnson, Director, Telecommunication Standardization Bureau
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
Presentation transcript:

Visit Univ. 16 April 2010 Committed to Connecting the World WTSA-08 Resolution 76: A snap view on Conformance and Interoperability Paolo Rosa Workshops and Promotion Division Head, Workshops and Promotion DivisionTelecommunicationStandardizationBureau Baden-Wuerttemberg Cooperative State University Business Information Technology ITU, Geneva April 2010

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 2 Always on Anytime, anywhere and in any form Voice and multimedia Self service, intuitive Simple for the end user Secure, trusted and reliable Converged new services: desire for Interoperability

Visit Univ. 16 April 2010 Committed to Connecting the World INTEROPERABILITY The most complex project ever implemented by mankind is arguably the phone network. It couldn’t have been done without interoperable standards of ITU

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 4 Anytime AnybodyAnything Any Data, voice, video

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 5 Why the Res. 76 Addressing interoperability as a reason for founding ITU Major concerns were raised at WTSA-08: lack of conformance poor quality counterfeit equipment Need of developing countries to be assisted in deploying testing facilities and building capacity facilities in the regions Other standards bodies have already introduced a number of activities to address conformity and interoperability and are far ahead of ITU.

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 6 Open Consultation on Conformance Assessment and Interoperability Testing Geneva, July 2009 Arena to express concerns about the lack of conformity and interoperability of products Consider possible testing ( interoperability) activities to be put in place by ITU Provide a picture of the existing scenario about the best practices performed by leading organizations worldwide Potential implementation of the ITU mark programme Provide elements useful to the implementation of Res. 76

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 7 Contents Consultation meetings Discussions also based on contributions:  Why Conformity ad Interoperability ?  Resolution 76 : a short review  The action lines decided by the Council-09  Impact on developing countries: benefits of the ITU C&I Programme, costs of lack of conformity and/or interoperability  Impact on industry, testing, MRAs, associated costs, time to market  Improvements to the ITU pilot database  Encouraging interoperability testing Audience Industry / Vendors Administrations Operators/service providers Standards developers Regulators Laboratories Civil society

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 8 TSB studies in progress with… Experts and External Organizations IEC, ISO, Regulators, Laboratories, Training institutions Governments UNIDO, WTO Accreditation bodies (ILAC, IAF, BIPM) Private sector, members and non-members of ITU

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 9 Council-09 endorsement Recommendations recalling Res. 76 instructions: TSB to establish a conformity database TSB to investigate industry’s interest in participating in interoperability events TSB and BDT to cooperate on capacity building on establishment of test centres in developing countries Development of a long-term business plan

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 10 Implementation of the ITU Conformity Programme ITU-T Recs & test suites Supplier’s conformity route decision Test lab (certification body responsibility) 1 st 2 nd or 3 rd party accredited lab (ISO/IEC 17025) ITU Conformity Database Test results (ITU-T X.290) 1st party Evaluation Supplier’s Conformity Declaration (ISO/IEC 17050) Test results (ITU-T X.290) Accredited (ISO/IEC Guide 65) Certification body Evaluation Conformity Certificate issued by Certification Body Conformity Assessment / Certification ITU CIP services Supplier ’ s Request to ITU Route 1 Route 2

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 11 Supplier’s Declaration / Certification – Risk relationship 3 rd party Certification RISK Need of 3 rd party independent testing Supplier’s Declaration Low High Moderate

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 12 Business Plan a first approach NEED OF TEST SUITES in ITU and / or in other SDOs Forums/Consortia EVALUATION OF RISK OF ACTING/NOT ACTING ON RES 76 RECOMMENDATIONS: PROS Ability to test for conformity assessment and interoperability in view as new tools to assist developing countries CONS To not be able to do the above and risking the leadership positioning in the ICT panorama Interoperability concerns of developing countries remain unaddressed, challenge of remaining cost neutral ROADMAP Develop definitive understanding of what exactly characterizes the “interoperability problem”: substandards products, policy vacuum in regulation, fill standards gaps, facilitate test events, criteria, confidentiality, schedule, publication of results test labs choice, legislative issues, specification, calibration, costs and revenues, others

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 13 Addressing interoperability is one of the very reasons for founding ITU Study Groups and Membership engaged in producing Recommendations suitable for testing “there is no point in developing test suites if ITU does not give some recognition to manufactures having their equipment tested to ITU-T Recommendations”

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 14 Write to:

International Telecommunication Union Visit Univ. 16 April 2010 Committed to Connecting the World 15 Paolo ROSA Head, Strategy, Workshops and Promotion Division ITU - Telecommunication Standardization Bureau Mr. Paolo Rosa graduated in physics the 1974 in Rome, Italy worked in the R&D Inst. PT Ministry He worked on optical communications and represented the Italian administration in national and international standards organizations becoming expert and senior advisor for the Italian Foreign Office, the UNDP and ITU He is author of several papers In 1997 he joined the ITU-T secretariat in Geneva as Counselor for Study Groups 6 and SG 15. Since 2005 he is the Head of the Workshop and Promotion Division of the ITU-T in Geneva. Thank you paolo. itu. int T.: F.: ITU/ Place des Nations CH – Geneva 20 Switzerland