Decadal Survey Mission Planning Presentation to GEO-CAPE Workshop Steve Volz August 18, 2008.

Slides:



Advertisements
Similar presentations
The WMO Vision for Global Observing Systems in 2025 John Eyre, ET-EGOS Chair GCOS-WMO Workshop, Geneva, January 2011.
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Brian Killough NASA NASA Future Missions Summary CGMS-38 Meeting Delhi, India November 8-12, 2010.
Science Mission Directorate NASA: Earth Science Initiatives and Plans AMS Public-Private Partnership Forum April 22, 2008 Jack A. Kaye, Ph.D. Associate.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
A NASA Headquarters Perspective August 24, 2010 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
Polar Highly Elliptical / Molniya Orbit Science (PHEMOS) Mission Phase 0/A Studies Mid-Term Review Meetings January 12-14th, 2011.
1 LBNL Enterprise Computing (EC) January 2003 LBNL Enterprise Computing.
PCOS Program Office Mission Studies and Technology Development Jackie Townsend Advanced Concepts and Technology Office PCOS and COR Program Offices
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
Provide a plan for future of the NASA OBB program Science to Requirements to Strategies to Missions Community plan Intended as a “living document” Will.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Roadmap Name Strategic Roadmap #n Interim Report April 15, 2005.
The Systems Engineer’s Role in Project Success J. H Rothenberg May 1, 2006.
Developing Technology for NASA Earth Science Technology Strategy Panel, 50 th Goddard Memorial Symposium March 28, 2012 Robert Bauer Deputy Director Earth.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
AIR QUALITY/ATMOSPHERIC COMPOSITION IN THE NRC DECADAL SURVEY, Earth Science and Applications from Space: National Imperatives for the Next Decade and.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Innovative Technologies Contributing to Future Earth Science Capabilities Presented to: Working Group on Space-Based Lidar Winds June 17, 2009 George J.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
PACE Science Definition Team Kickoff Meeting Paula Bontempi, Betsy Edwards, Eric Ianson, Hal Maring, Woody Turner NASA Headquarters PACE Program Science.
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
Michael H. Freilich 21 April 2009 Earth Science Division Overview and Status.
Software Engineering Lecture # 17
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
CLARREO Mission Studies Overview David F. Young First CLARREO Mission Study Team Meeting Newport News, VA April 30 - May 2.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Second GPM Applications Workshop 9-10.June Partners in the GPM Constellation Second GPM Applications Workshop 9-10.June.2015.
Decadal Survey Mission Planning Presentation to CLARREO Workshop Steve Volz October 21, 2008.
Project Kick-off Meeting Presented By: > > > > Office of the Chief Information Officer.
NASA REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate June 5, 2007.
50 Years of Meteorological Satellite Experiments – The NASA Perspective Franco Einaudi November 2, 2009.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
“America’s NOAA National Weather Service: Protecting Lives, Livelihoods, and A Way of Life” Water Resources Vision 2020 Deliver a broader suite of improved.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
NASA Applied Sciences Program Update John A. Haynes Program Manager, Weather National Aeronautics and Space Administration Applied Sciences Program Earth.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
ST5 PDR June 19-20, 2001 NMP 2-1 EW M ILLENNIUM P ROGRA NNMM Program Overview Dr. Christopher Stevens Jet Propulsion Laboratory, California Institute of.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
NASA Earth Science Perspective February 8, 2011 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
Earth Systematic Missions Program Office Pre-Phase A Guidelines and Expectations Mary DiJoseph ESM Program Deputy Technical.
LISA News from ESA O. Jennrich LISA Project Scientist.
NASA Headquarters Perspective on Space- Based Global Wind Measurements Presented to: Working Group on Space-Based Lidar Winds February 2, 2010 George J.
Overview of the NRC Decadal Review Dennis P. Lettenmaier Department of Civil and Environmental Engineering University of Washington for presentation at.
1 Climate Absolute Radiance and Refractivity Observatory (CLARREO) Welcome David Young Project Scientist CLARREO Mission Formulation Team NASA Langley.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Decadal Survey Tier 1 Missions Road to Mission Concept review Mary DiJoseph ESM Program Deputy Technical.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Report to WCRP Observations and Assimilation Panel David Goodrich Director, GCOS Secretariat Towards a GCOS Reference Upper Air Network.
Implementing Program Management Standards at Duke Energy.
Office of Major Project Development (OMPD) Overview November 2015.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
NASA Model-Based Systems Engineering Pathfinder 2016 Summary and Path Forward Karen J. Weiland, Ph.D. Jon Holladay, NASA Systems Engineering Technical.
Camera PDR/CD1 Planning 19 September 2008
NASA/US Ocean Satellite Missions
Identify the Risk of Not Doing BA
TechStambha PMP Certification Training
Systems Engineering for Mission-Driven Modeling
Joint Planning and Development Office “Where new ideas are welcome”
DOE Review of the LCLS Project October 2006
Preliminary Project Execution Plan
Presentation transcript:

Decadal Survey Mission Planning Presentation to GEO-CAPE Workshop Steve Volz August 18, 2008

2 Agenda  Overall Decadal Survey study objectives  Study Management and Execution

3 3 Decadal Survey MissionMission DescriptionOrbitInstruments$ Estimate Timeframe 2010 – 2013, Missions listed by cost CLARREO (NASA portion) Solar and Earth radiation: spectrally resolved forcing and response of the climate system LEO, PrecessingAbsolute, spectrally- resolved interferometer $200 M SMAPSoil moisture and freeze/thaw for weather and water cycle processes LEO, SSOL-band radar L-band radiometer $300 M ICESat-IIIce sheet height changes for climate change diagnosis LEO, Non-SSOLaser altimeter$300 M DESDynISurface and ice sheet deformation for understanding natural hazards and climate; vegetation structure for ecosystem health LEO, SSOL-band InSAR Laser altimeter $700 M Timeframe: 2013 – 2016, Missions listed by cost HyspIRILand surface composition for agriculture and mineral characterization; vegetation types for ecosystem health LEO, SSOHyperspectral spectrometer $300 M ASCENDSDay/night, all-latitude, all-season CO 2 column integrals for climate emissions LEO, SSOMultifrequency laser$400 M SWOTOcean, lake, and river water levels for ocean and inland water dynamics LEO, SSOKa-band wide swath radar C-band radar $450 M GEO-CAPEAtmospheric gas columns for air quality forecasts; ocean color for coastal ecosystem health and climate emissions GEOHigh and low spatial resolution hyperspectral imagers $550 M ACEAerosol and cloud profiles for climate and water cycle; ocean color for open ocean biogeochemistry LEO, SSOBackscatter lidar Multiangle polarimeter Doppler radar $800 M NRC Recommended Missions - Early/Mid

4 4 Timeframe: , Missions listed by cost LISTLand surface topography for landslide hazards and water runoff LEO, SSO Laser altimeter$300 M PATHHigh frequency, all-weather temperature and humidity soundings for weather forecasting and SST* GEOMW array spectrometer $450 M GRACE-IIHigh temporal resolution gravity fields for tracking large-scale water movement LEO, SSO Microwave or laser ranging system $450 M SCLPSnow accumulation for fresh water availability LEO, SSO Ku and X-band radars K and Ka-band radiometers $500 M GACMOzone and related gases for intercontinental air quality and stratospheric ozone layer prediction LEO, SSO UV spectrometer IR spectrometer Microwave limb sounder $600 M 3D-Winds (Demo) Tropospheric winds for weather forecasting and pollution transport LEO, SSO Doppler lidar$650 M NRC Recommended Missions - Late

5 ESD Execution of Decadal Survey Missions  All Decadal Survey Missions concepts studies are directed by the ESD and will be managed by the Earth Systematic Missions (ESM) Program Office at GSFC  All mission development will have a study management team, led from HQ ESD by the HQ Program Scientist and Program Executive, and including representatives from ESTO, data systems, applied sciences, and the ESM program office  All members of the mission study ESD teams should be involved in all relevant study discussions, and the PS and PE are expected to participate in cross mission science and mission trades

6 SMAP & ICESat II  SMAP and ICESat II have been officially announced as the first two Decadal Survey (DS) missions the ESD and NASA will implement.  SMAP project will be executed out of JPL, and is currently preparing for its Mission Confirmation Review in September The projected launch date is now early 2013  ICESat II project will be executed out of GSFC, and is working to its Mission Confirmation Review in early The launch date is under study, expected between 2014 and 2015  Both missions are directed science missions with individual budget lines. They are managed out of the Earth Systematic Missions (ESM) Program Office located at GSFC.

7 Objectives for the Next 7 DS Missions  Define and implement a mission development and mission study activities for the Decadal Survey missions  Advance the maturity and development of all missions, prioritized roughly by their order in the launch queue as defined by the DS;  The other Tier 1 missions (DESDynI & CLARREO) build on the progress from the Science workshops  Tier 2 missions build on the results of the earlier mission concept studies,  Tier 3 missions leverage off development activities on the Tier 1 & 2 missions  Conduct the studies in an integrated fashion, with coordination at multiple levels  The PS/PE study leads should collect and prioritize the needed activities for the 18 month period, geared to the appropriate “launching point” for the start FY10 activities.  These proposed activities should be collected at HQ, with Flight and Science jointly preparing a proposed implementation, then presented through the ESD steering committee for selection.  To refine the mission and DS program definition sufficiently by the end of FY09 to inform directed mission development planning for the next mission starts to follow SMAP and ICESat II.

8 Close Interactions Are Mandatory Through Phase A  All mission design trades we will consider are significant and the optimizations we arrive at will define the final scope for each mission  Close coordination between and among each Project, the Program Office, and the Earth Science Division is essential to ensure the final mission design put forward at the Confirmation Review (KDP-B) is robust scientifically, financially and programmatically  Will include the Mission Level 1 Requirements, etc.  The ESM Program Office, working with the ESD and the Projects, will define a schedule of mission definition milestones leading to MCR and KDP-B for the all mission concepts

9 Overall Decadal Survey Study Funding  Assigned budgets for the studies are:  SMAP and ICESat II have individual budget lines. DESDynI, CLARREO and the five 2nd Tier missions concepts are funded from a common budget line and we are able to move funds between the concept studies if the mission studies warrant it  Funding levels for FY10 and beyond will be determined as part of the normal budget process, informed by the progress and outcome of these many studies

10 NASA Hierarchy of Directives  NPR D - NASA Space Flight Program and Project Management Requirements governs the processes associated with formulating and implementing a new flight project  Important details for GEO-CAPE:  Defines the Major Milestones  Identifies all requirements for each phase of the Project  Identifies all gate products for each phase  Defines roles and responsibilities  Identifies all major reviews  NPR D - NASA Space Flight Program and Project Management Requirements governs the processes associated with formulating and implementing a new flight project  Important details for GEO-CAPE:  Defines the Major Milestones  Identifies all requirements for each phase of the Project  Identifies all gate products for each phase  Defines roles and responsibilities  Identifies all major reviews

11 Flight Project Life Cycle Extracted from NPR D

12 Mission Requirements for Pre-Phase A Headquarters  Approve a Formulation Authorization Document  Develop DRAFT Level 1 Requirements  Conduct Acquisition Strategy Planning Meeting Technical Activities:  Develop and document preliminary mission concepts  Conduct internal Reviews  Conduct Mission Concept Review Project Planning, Costing and Scheduling  Develop and document a DRAFT Integrated Baseline, including:  High level WBS  Assessment of Technology Readiness Levels  Assessment of Infrastructure and Workforce needs  Identification of potential partnerships  Identification of conceptual acquisition strategies for proposed major procurements KDP Readiness  Obtain KDP A Readiness products  Approval through the governing PMC  Development of DRAFT Level 1 Science Requirements  Support development of preliminary mission concepts  Support the assessment of Technical Readiness Levels  Identify potential partnerships Areas the Science Community must work: Scope of Major Pre-Phase A Activities:

13 Key Pre-Phase A Questions  What science MUST this mission achieve?  What specific measurements?  To what accuracy?  What are the required data products?  What mission parameters can achieve the science?  What orbit (inclination/altitude)?  Which instruments?  What is the baseline mission duration?  How can NASA achieve these measurements?  Are there other missions required/desired to achieve the science?  Who can NASA partner with to achieve this mission? Should be resolved ~ 12 months prior to KDP A Should be resolved ~ 6 months prior to KDP A

14 Next 7 Mission Study Schedule Objectives  Where do we want to be by June 1, 2008?  Identify and authorize all FY2008 study activities by mission, by task, by $  Identify preliminary FY09 study activities  Initial assessment of cross cutting studies and analyses for Tier 1 and Tier 2 Decadal survey activities  Where do we want to be by October 1, 2008?  Completion of FY08 activities and assignment of FY09 study activities by mission, by task, by $  Quantitative assessment of the degree to which objectives and deliverables for KDP-A will be completed by the end of FY09  Cross-cutting Mission studies definition and assignments by task and by $  Where do we want to be by October 1, 2009?  Quantitative assessment of each mission’s readiness to proceed to Phase A, including a full assessment of technology readiness, draft Level 1 requirements and mission concepts of operations  Mission maturation plan for FY10 and beyond  Decadal Survey Program assessment, including cross cutting mission analyses, constellation measurement requirements and other Decadal Survey program needs: Venture class, ground systems, ground networks

BACKUP

16 Science Management and Requirements Definition  For all mission concepts, the overall mission science requirements and objectives will be defined by the Earth Science Division, with the discipline area Program Scientist as the lead and working closely with the individual mission concept science team  For SMAP and ICESat II individual Science Definition Teams (SDT) will be selected based on competitive proposals solicited through a special Amendment to ROSES  Proposals due July 29 and 30, 2008  In the interim, ad hoc science working groups are in place for each of these missions to continue the preliminary science requirements discussions and definitions  For DESDynI and CLARREO and Tier 2 Decadal Survey mission concepts, a similar approach is envisioned, but the SDTs will be initiated later as those mission concepts mature

17 Role of the Earth Systematic Missions Program Office  All Decadal Survey Missions are directed missions and will be managed by the Earth Systematic Missions (ESM) Program Office, housed at GSFC.  This is former EOS Program Office renamed and re-envigorated for the Decadal Survey  While housed at GSFC the ESM shall incorporate expertise from across NASA  In particular including science and instrument expertise from LaRC and JPL  Level of interaction and involvement by the ESM PO with the individual mission development activities will vary with the maturity of the mission and mission study  For all mission development activities the ESM PO will conduct cross- mission studies and investigate synergies, working with the ESD  For SMAP & ICESat II, the PO will have significant direct involvement  For CLARREO & DESDynI, the PO will co-lead the mission maturation activities with the PS/PE leadership team from HQ  For Tier#2 and Tier #3 missions, the individual mission activities will be led by the PS/PE, supported by the PO

18 Cross & Common Mission Activities  Identified under Cross Cutting items in WBS breakout and coordinated through the ESM Program office  Data systems  GPS on each mission  Downlink capacity and impacts on data latency  Geodetic networks  Common Mission study features  Launch vehicle availability and options  Technology assessments made with consistency  Instrument Incubator Program  IIP Award Announcement April 2, 2008  Future solicitations  Advanced Component Technology solicitation released

19 NASA Decadal Survey Community Activity  NASA is conducting definition studies on the first two tiers of Decadal Survey mission concepts:  Tier 1 - SMAP, ICESat II, DESDynI, CLARREO  Tier 2 - ACE, SWOT, ASCENDS, HyspIRI, GEO-CAPE  NASA is actively engaging the broad science and research communities to help definitize the objectives of the Decadal Survey mission concepts 2008 Decadal Survey Mission Study Community Activities

20 Earth Systematic Missions Program Office Associate Director/ Earth Systematic Missions Program Manager Gilberto Colon Senior Scientist Vacant Secretary Donna Mudd ESM Flight Deputy Program Manager David Mitchell ESM Operations & Data Systems Deputy Program Manager Vacant Advanced Studies & Strategic Capability Deputy Associate Director/ Technical Mary DiJoseph Mission Integration Manager Paul Brandinger System Engineer/590 Nick Speciale Program Instrument Systems Mgr Vacant Program Business Office Program Business Manager Jonathan Bryson Deputy Program Business Manager Kathy Shifflett Program Support Manager Katy Mikkelsen –NPOESS IPO –LDCM –GPM –Glory –NPP –ESMO –ESDIS – Ground Systems Capability PAO Lynn Chandler ESM Performing Centers ARC: TBD GSFC: David Mitchell LaRC: Leila Vann JPL: Diane Evans __________________________ Signature /date Draft- 4/4/08 Procurement Manager Steven Kramer NOAA Projects Gilberto Colon – NOAA N’ – GOES N-P – SMAP (JPL) – ICESat II (GSFC) – CLARREO – DESDynI – Decadal Survey studies Systems Safety & Mission Assurance/300 Independent Technical Authority/500 Decadal Survey Focus Current Commitments Focus

21 Notional Mission Timeline NOTE: The time for each phase is considered nominal - could be accomplished earlier

22 Mission Requirements for Phase A  Concur with Level 1 Science Requirements  Support development of preliminary system-level requirements  Support development of mission baseline concept  Support Development of preliminary mission operation concept Areas the Mission Science Team must work: Scope of Major Phase A Activities: Headquarters  Establish Baseline Level 1 Requirements  Conduct Acquisition Strategy Meeting  Initiate Interagency and International Agreements Technical Activities:  Develop preliminary system level requirements  Develop/document Baseline Mission Concept  Develop preliminary mission operations concept  Initiate technology developments  Develop initial orbital debris assessment  Conduct System Requirements Review  Conduct Mission Definition Review Project Planning, Costing and Scheduling  Prepare a preliminary Project Plan  Conduct required Integrated Baseline Reviews  Develop/document preliminary Integrated Baseline  Identify Export Controlled technical data KDP Readiness  Obtain KDP B Readiness products  Approval through the governing PMC

23 Technology Readiness Level Low Maturity High Maturity TRL levels defined in NPR A TRL 6 is the desired minimum level for integration of new technology

New Decadal Survey-Related IIP Awards

25 Mission Development Guidance  During Pre-Phase A and Phase A, the Projects will work closely with the Program Office and the ESD to define the best mission that fits within the allocated resources.  This will be a highly interactive and iterative process involving all three parties, and should draw on the lessons learned from the many NASA and non-NASA missions completed or in process.  The extended team will investigate  Potential partnerships with non-NASA organizations  Instrument and mission design and development options, including make/buy decisions and alternative mission operations approaches

26 Major Pre-Formulation Events

27 Major Formulation (Phase A/B) Events ReviewDescription Mission Concept Review (MCR) The MCR will affirm the mission need and examine the proposed mission's objectives and the concept for meeting those objectives. Technologies will be assessed and identified. It is an internal review (SRB may not have been formed) that usually occurs at the cognizant organization for system development. ROM budget and schedules will be presented. System Requirements Review (SRR) The SRR examines the functional and performance requirements defined for the system and the preliminary program or project plan and ensures that the requirements and the selected concept will satisfy the mission. Mission Definition Review (MDR) The MDR examines the proposed mission/system architecture and the flow down to all functional elements of the system. Technology planning with off-ramps will be described. The preliminary description of the management approach and initial budget and schedule will be presented. Risk assessment and management will be presented as well as initial de-scope plan. Preliminary Design Review (PDR) The PDR demonstrates that the preliminary design meets all system requirements with acceptable risk and within the cost and schedule constraints and establishes the basis for proceeding with detailed design. It will show that the correct design option has been selected, interfaces have been identified, and verification methods have been described. Full baseline cost and schedules as well as all risk assessment, management systems and metrics will be presented.