POWER SECTOR REFORMS IN INDIA. 1. Vertically Integrated Utilities - Generation - Transmission - Distribution 2. Central Sector Generation 3. Central Sector.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Electricity Supply Industry Reform Strategy and Roadmap Prepared by MEM June, 2014.
THE STATUS OF POWER SECTOR REGULATION IN NEPAL THE ELECTRICITY TARIFF FIXATION COMMISSION FORMED IN 1994 IN ACCORDANCE WITH ELECTRICITY ACT OF 1993.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Power Sector SCENARIO in Rajasthan Presented By: Deepak Saxena CUTS Centre for Consumer Action, Research & Training (CART)
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Organization of the electricity supply industry © 2012 D. Kirschen & University of Washington 0.
Slide 1 Sudan Private Sector Forum A Forum to support Sudanese Public – Private Sector Dialogue Prepared by Amin Sid Ahmed- World Bank, PSD Advisor Presented.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Discussion on Power Tariff in Delhi Jointly organized by Rajiv Gandhi Institute for Contemporary Studies (RGCIS) & energywatch 6 th May 2003, New Delhi.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
Electricity Reforms in Bangladesh
INDIAN POWER SECTOR. Presentation Contents: Power Sector Structure in India Transmission Planning Criteria RLDC ’ s Management System Restoration Procedures.
Comparative Legal and Regulatory Framework of Nepal and India relating to Hydropower Development Advocate Amar Jibi Ghimire.
Emerging Transco’s -The New Role Managing Director Karnataka Power Transmission Corporation Ltd., Bangalore, Karnataka.
CHITALE & CHITALE PARTNERS 1 POLICY FRAMEWORK FOR TRANSMISSION & DISTRIBUTION IN POWER SECTOR ADVOCATES & LEGAL CONSULTANTS ONGCONGC.
October 8, 2003Ontario Energy Board1 Ontario Energy Board Update E.A. Mills Director – Regulatory Affairs Market Advisory Committee October 8, 2003.
CII – PTC Conference on The Power Market Post Electricity Act 2003: Entities, Business Models and Implications by Karthikeya Pisupati Deloitte Touche Tohmatsu.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Requirement details Expression Of Interest Jaipur Vidyut Vitran Nigam Limited Ajmer Vidyut Vitran Nigam Limited Jodhpur Vidyut Vitran Nigam Limited For.
REFORMS IN DELHI. Reforms in Delhi --- Points of Concern Heavy urbanization, unbridled influx, ballooning population, haphazard growth, abundant availability.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
The Future of Energy Markets in India: Structure and its Regulation Anoop Singh Dept. of Industrial and Management Engineering, Indian Institute of Technology.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
Energy Agency of the Republic of Serbia
Overview of NER and its Future Business Direction Presentation to Standing Committee on Minerals and Energy Parliament 09 May 2001.
Natural Gas – Some Regulatory Issues Oil & Gas Industry Practice.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
India. Agenda Introduction Industry Structure and Regulations In Power Other Initiatives in Power Industry Natural Gas Markets Privatization Initiatives.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
1 ISSUES RELATING TO RE-ORGANIZATION OF S.E.B.s Bhanu Bhushan.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
Competition in the Indian electricity sector The experience so far Shahid Hasan Fellow, Energy Reforms Group The Energy and Resources Institute New Delhi,
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
POWER SECTOR REFORMS IN INDIA. POWER SECTOR REFORMS IN DELHI Delhi Model of Distribution Privatization.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Power Sector Reform in Russia: Results and Steps Forward Y.A. Udalcov, Board Member, Head of the Reform Management Centre JSC “Unified Energy System of.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
RAO UES Reform: The Final Stage. 2  RAO “UES of Russia” today  Reform: company transformation and market development  Conclusions Table of Contents.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
LEGAL FRAMEWORK, POLICIES AND REGULATIONS AND ORGANIZATIONAL SET UP IN INDIA -Dr. Aditi Raja Director, Finance, KPTCL
SRLDC 1 COMPETITION IN GENERATION Power Grid Corporation of India Limited New Delhi, India.
Understanding the Dynamics of Electricity Trade in the Philippines with the Entry of Retail Competition and Open Access.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Transmission Tariff V.Balaji Chief Manager SRLDC.
Overview of Market Reforms and the WESM
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
Point of connection Mechanism
PRESENTATION ON TARIFF POLICY By S.R.SETHI DIRECTOR (OPRS) DELHI TRANSCO LTD.
EgyptEra 1 Market Reform By: H. Waheed. 2 Objectives Of Regulatory Agency  Regulates and supervises all electricity generation, transmission, and distribution.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
STATE ENERGY REGULATORY COMMISSION (SERC) Prof. Konstantin Shushulov Chairman Budapest, Hungary May 19, th Annual Meeting of the Energy Regulators.
Japanese Electricity Market M. Hossein Javidi Iran Electricity Market Regulatory Organization & Administrative Department for Electricity Market Regulatory.
Sharing of Inter-State Transmission Charges and Losses Abbhimanyu Gartia, Dy General Manager, WRLDC, MUMBAI.
Georgy TAVADZE Chairman Georgian National Energy Regulatory Commission (GNERC) Budapest, Hungary April 14, th Annual Meeting of the Energy Regulators.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Power Sector Reform in Asia
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Power Sector Reform in Asia
Exit Capacity Substitution and Revision
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
London Business School and City University, London
Presentation transcript:

POWER SECTOR REFORMS IN INDIA

1. Vertically Integrated Utilities - Generation - Transmission - Distribution 2. Central Sector Generation 3. Central Sector Transmission Indian Power Sector (Pre-Reforms )

G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG

COORDINATES/ RLDC REGIONAL GRID IPP STATE GENR. SHARE CENTRAL

1. Enactment of ERC Act Constitution of CERC 3. Constitution of SERC’s 4. Unbundling of State Electricity Boards 5. Privatisation of Distribution Indian Power Sector (Reforms : Milestones)

REFORMS IN INDIAN POWER SECTOR Status in Different States

Thrust areas and progress 1. SERCs constituted in 22 out of 29 states SERCs have issued tariff orders states have unbundled their SEBs Indian Power Sector Reforms

Thrust areas and progress 4. 2 states have privatised distribution states have signed MoUs with the Ministry of Power states have provided 100% metering at 11 kV Indian Power Sector Reforms (contd/-)

Thrust areas and progress 7. 5 states have provided 100% consumer metering states have provided for anti-theft legislation Indian Power Sector Reforms (contd/-)

POWER SECTOR REFORMS ROLE OF CERC & SERC’s

INDIAN ELECTRICITY ACT 2003 Chapter X Constitution Powers and Functions of CERC & SERC’s

NEED FOR AN IEGC Period Situation Early 1970sVertically integrated SEBs. Few problems – resolved either bilaterally or at REB level. Late 1970s- Entry of Central Generating Utilities. Early1980s Gradual increase in disputes but consensu generally emerged at REB level. Late 1980s Disputes/conflicts increased in direct proportion to number of Central Sector Power Stations. Limitations in resolving the same at REB level.

NEED FOR AN IEGC Period Situation Early 1990s Unresolved commercial disputes resulted in need of an umpire Transfer of RLDCs from CEA to POWERGRID Amendments to ES Act, Constitution of CERC / SERCs, Unbundling of SEBs, possible entry of mega IPPs, IPTCs - more players, more scope for confusion.

DEVELOPMENT OF IEGC Feb 1999 Special Working Group Under Shri D.P. Sinha, Member CERC Submits Its Report Indicating Modalities for Formulating IEGC. 31 st Mar 99 CERC issues directives to POWERGRID for preparing IEGC and organisational arrangements for the CTU. 9 th April 99 Draft IEGC submitted to CERC (Petition 1/99). Apr-May 99 Draft IEGC made public on the directions of CERC to elicit comments from all sections.

DEVELOPMENT OF IEGC July 1999 Public hearings by CERC on the draft IEGC on 20 th, 21 st & 23 rd July th Aug 99 Revised IEGC draft submitted by POWERGRID to CERC. 30 th Oct 99 & CERC’s orders on above IEGC draft (Aug nd Nov 99 Version) 7 th Dec 99 IEGC draft ( Aug. 99 Version ) revised as per above orders and filed before CERC.

DEVELOPMENT OF IEGC 21 st Dec 99 Final directions of CERC on the above IEGC draft. 28 th Dec 99 First version of IEGC as per above orders and circulated to all agencies & implemented w.e.from 1 st Feb th July IEGC Review Panel constitution approved 2000 by CERC 17 th Nov Rules & Guidelines of IEGC Review Panel 2000approved by CERC

DEVELOPMENT OF IEGC 29 th March Amendments to IEGC forwarded by 2001 Review Panel to CERC after meetings on 12 th Feb & 26 th March nd Feb First review of IEGC approved by CERC 2002based on the draft submitted by CTU based on orders dated 3 rd Aug 2001 and meeting of Review Panel on 10 th Dec st April First review of IEGC in force. 2002

POWER SECTOR REFORMS Orissa Model

Power Sector Reforms : Orissa Model Facts of the case: Orissa was the first State in the country to go in for reforms. OERC was set up WEF Reforms were conceived by the World Bank and funded by DFID. The Agenda included running the electricity industry in an efficient and competitive manner (--- without any major change in procedures and environment). The valuation to corporations at the time of transfer was done on the basis of assets transfer.

Orissa Model BC G G G G G D RC T G : Genco BC : Bulk Consumer T : Transco RC : Retail Consumer D : Discom

Valuation of the assets at the time of transfer to the utilities were unrealistic (…higher side). Since the transfer costs were high, the tariff was high. The concept was on cost plus return on capital, rather than on efficiency and performance based returns. Transfer policy did not stipulate any goals for loss reduction. Average tariff increased by around more than 15 % without any customer service. Power Sector Reforms : Orissa Model Pitfalls:

Distribution companies found it difficult to sustain financially and finally defaulted. Discoms defaulted to Gridco, which in turn defaulted to Gencos, and hence inadequate cash realization by all concerned agencies. T&D losses continued to remain high with 46.94% in and 46.63% even after 5 years, i.e. in Even escrow failed. Power Sector Reforms : Orissa Model Endresults:

BC Recommended Model D NG OG RC OG : Old Genco BC : Bulk Consumer NG : New Genco RC : Retail Consumer D : Discom

POWER SECTOR REFORMS IN DELHI Delhi Model of Distribution Privatization

Reforms in Delhi --- Points of Concern Heavy urbanization, unbridled influx, ballooning population, haphazard growth, abundant availability of electrical gadgets, rise in affordability level were some of the reasons that had been adding to the unplanned growth of the Power Utility of the Capital, year after year.

On the eve of privatization DVB was being rated as the SEB having large portion of total dealt energy as theft and unaccounted losses. Initial thinking was to unbundle DVB into Corporations for Generation, Transmission and Distribution businesses. But seeing the unmanageable stage where distribution had reached, it was decided to start the privatization process with Distribution first. Reforms in Delhi -- Points of Concern (contd..)

There was a continuously rising trend in the theft and losses quantam. Gap between cost of power purchased and amount of realization was widening year after year. Increasing demand was adding to the losses with each unit of power purchased or generated and inducted into the network. Reforms in Delhi -- Points of Concern (contd..)

Thank You