TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Autonomous Sensor and Control Platform Rover Tae Lee Josh Reitsema Scott Zhong Mike Chao Mark Winter.
PH4705 ET4305 Interface Standards A number of standard digital data interfaces are used in measurement systems to connect instruments and computers for.
Engineer Training TN 59 Ink Management Solution TJ8300 / TJ8500 TN 59 Ink Management Solution Machine 75 and Above.
Presents The Silver Family An Integrated Approach to Processors, Data Communication and Head End Integration.
TE-MPE-TM meeting 09/10/2014, Jaromir Ludwin, IFJ-PAN, Kraków The ELQA LabVIEW Application Framework or how to become a successful test system developer.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
CHANGE OF RESISTANCE TEST STAND – P13472 Mission Statement: To design a test stand capable of measuring the temperature of an H.I.D. Magnetic Ballast using.
Hardware-In-The-Loop Testbed Team 186: Douglas Pence, Ken Gobin, Aaron Eaddy, Advisor Sung Yeul Park Department of Electrical and Computer Engineering,
International Scientific & Technical Conference
Sharepoint Portal Server Basics. Introduction Sharepoint server belongs to Microsoft family of servers Integrated suite of server capabilities Hosted.
New HV test specification for the LHC N. Catalan for the EI section.
Electronic Component Functions What is this component doing my in electronic device?
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Group Members: Brad Cox Kevin Burkett Tera Cline Arthur Perkins CS10 Battery Management System.
A Scalable Application Architecture for composing News Portals on the Internet Serpil TOK, Zeki BAYRAM. Eastern MediterraneanUniversity Famagusta Famagusta.
Objectives How Microcontroller works
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Christophe Martin / DQLPU Test Bench MPE-TM of 24/10/ DQLPU Functional Test Bench Front view Rear view.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
IBM - CVUT Student Research Projects Remote Control of a Furby Toy with BlueTooth Tomáš Kunc
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
ESLM 21/02/2013, Rafal Kulaga, TE-MPE-EE Hardware and software upgrade for the High Voltage Crate Rafal Kulaga, AGH UST (Krakow)
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
FIRST Electrical Design FIRST Robotics Championship Conference Steven Shade Team 1111 April 16, 2003.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
TE/MPE-TM GRZEGORZ SEWERYN THE UPGRADE OF TT SENSORS C-50 TO THE REDEL CONNECTOR 1.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Hybrid Power Controller (HPC) Final Presentation Senior Design II.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Hybrid Power Controller (HPC) Mid-Semester Presentation Senior Design II.
1 TestDescription Schema Implementation in SAMe ATE ATML Meeting – Boston, MA October 2006.
Grounding.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Report on database work for INB in ALICE Latchezar Betev (ALICE) Information Session INB – June 8, 2006.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
A Mini project on “DRIVERLESS TRAIN ENGINE USING 8051 MICROCONTROLLER” GUIDED BY K.RAMBABU.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Radiation Resistant Lighting Ben Fiedler Supervisor: J. Devine.
ProtoDUNE SP – Slow control temperature gradient monitor
Considerations from machine protection and the ELQA teams
Electrical insulation of magnet circuits in sector 7-8
ELQA Electrical Quality Assurance
SCADA for Remote Industrial Plant
Giorgio on behalf of ELQA team
LHC Hardware Commissionning
Giorgio on behalf of ELQA team
ELQA How to define test voltages
Status of ELQA equipment and related software
Project guide B. SUBBULAKSHMI M. E Assistant Professor C. A. R
Circuits description and requirements - Closed Session-
Universal Serial Bus (USB)
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow

TE-MPE-TM 25/10/2012, ELQA team ELQA prior to the Powering Tests All possible ELQA scenarios are described in EDMS document Main part of ELQA activities was marked in black.

TE-MPE-TM 25/10/2012, ELQA team ELQA campaign Tests are divided into 3 groups: TP4 – Test Procedure 4 o HV and LV tests of circuits powered via DFBs o 743 circuits DOC – Dipole Orbit Corrector check o HV and LV tests of circuits powered locally o 914 circuits MIC – Magnet Instrumentation Check o HV and LV tests done locally on each magnet – it includes quench heater qualifications o 1763 magnets. TP1, TP2, TP3 were the test procedures suitable for testing DFBs at different stages of assembly. TP4 is the last test procedure that shall be applied once the DFB are connected to the magnet chain.

TE-MPE-TM 25/10/2012, ELQA team Typical circuit tested with TP4 2 current leads Magnet chain We need to check: Electrical insulation of the circuit, Continuity and resistance of the circuit, Continuity and resistance of V-taps, Check if V-taps are properly distributed along the CLs. Make sure that the Pt100 is properly attached to the CL potential (to be implemented)

TE-MPE-TM 25/10/2012, ELQA team Complexity issue For the MIC test there are 23 different types of magnets. The TP4 and DOC tests are even more varied o 2-4 current leads in one circuit, o 7 types of current leads, o 6 types of connectors on DFBs

TE-MPE-TM 25/10/2012, ELQA team Complete system overview A universal measurement system is needed to cover all configurations Measurements have to be automated Results must be stored in the central database Follow-up web page should be available as well

TE-MPE-TM 25/10/2012, ELQA team Complete system overview

TE-MPE-TM 25/10/2012, ELQA team The TP4 System The TP4 system was recently upgraded by the team from IFJ-PAN (aka HNINP), Krakow o The hardware of the old system was unmaintainable o There were not enough spares o The old system was entirely dependent on the Keithley multimeter o The stability parameters of the old system were acceptable, but there was a lot of room for improvement o Many additional features were added in the upgraded version In this presentation we will focus on the current version of the system

TE-MPE-TM 25/10/2012, ELQA team Hardware – general architecture

TE-MPE-TM 25/10/2012, ELQA team Hardware Measurement of the ohmic resistance of the highly inductive superconducting magnet, requires extremely stable current. Using voltage source with stable serial resistance gives better results than using current source. In order to stabilise the resistance of the current path within the measurement system, we have decided to thermally stabilise the crucial elements.

TE-MPE-TM 25/10/2012, ELQA team Hardware The resistors are used to set the working point of the power supply and for current measurement. 18 Internal voltage taps are routed to the inputs of the multiplexers.

TE-MPE-TM 25/10/2012, ELQA team The temperature regulation The temperature regulator is based on the microcontroller, connected to the computer via USB port. Regulation is done in two stages: o Temperature of internal part is controlled by proportional- integrating regulator using 4 heaters. The current relays PCB and resistors are enclosed in thermally insulated box. o Temperature of external part is controlled by proportional regulator using set of heaters and fan Parameters of regulators are stored in the EEPROM, and can be modified from the level of LabVIEW software. Since we know the power that will appear on the resistors during the measurement, we can use feed-forward method to stabilise the temperature of the resistors. The feed-forward control is done by altering the integral term of PI regulator.

TE-MPE-TM 25/10/2012, ELQA team Hardware The system is equipped with 84 inputs: 18 internal, 66 available on the front panel. Having 4 independent 1 of 84 multiplexers gives following possibilities: Measurements of any two voltages inside the system and on the device under test 4-wire resistance measurements Transfer function measurements using freely chosen reference impedance

TE-MPE-TM 25/10/2012, ELQA team PCBs arrangement Multiplexers are fitted into a 3U crate, Power supply is located in a separate 1U case

TE-MPE-TM 25/10/2012, ELQA team Shielding

TE-MPE-TM 25/10/2012, ELQA team Current status of the system All multiplexer crates are assembled and tested, Measurement instruments are mounted on the available trolleys, Most of the measurement cables are ready, During the development of the system emerged an idea of replacing Keithley multimeter with two PXI DMM cards. o The migration is ongoing o SM18 tests have shown that the migration is not going to be too complicated

TE-MPE-TM 25/10/2012, ELQA team Debug console Apart of the standard measurement applications (TP4, DOC, MIC) there is a “debug console” Access to all the measurement instruments in the system, Low level control of the multiplexers and the thermostats, Usage of functionalities inaccessible for standard applications, System self testing capability, Advanced circuit diagnostics, Designed to be used by experts only.

TE-MPE-TM 25/10/2012, ELQA team Software Database is the central part of the system. It stores: Reference data describing circuits Test content Validation conditions Configuration parameters Calibration parameters Results Signal translation in low voltage test applications.Measurement results validation process.

TE-MPE-TM 25/10/2012, ELQA team Open question During the MIC tests, we are powering the measurement system form 24 VDC batteries of Pefra tractor. There are rumours, that the tractor type at CERN may change. In such case we would have to adapt our hardware and the work flow. Source: Model 507 datasheet

TE-MPE-TM 25/10/2012, ELQA team Conclusions TP4 is a very versatile system perfectly suited for the complex LHC circuits, Upgrade works are almost finished, If needed the TP4 platform may be used for new types of measurements, The database system makes it a reliable and scalable system, A test on a highly inductive superconducting magnet is still missing

TE-MPE-TM 25/10/2012, ELQA team Acknowledgements The new TP4 is a very complex project. Many details had to be carefully designed in order to achieve expected performance, both from electrical and mechanical points of view. Credit for solution of those problems goes mainly to the IFJ-PAN team: Piotr Jurkiewicz, Marek Ruszel, Ryszard Tarczoń and others, who are not mentioned here, but realisation of this project would be impossible without them.

TE-MPE-TM 25/10/2012, ELQA team Thank you for your attention!

TE-MPE-TM 25/10/2012, ELQA team Back-up slides For the discussions

TE-MPE-TM 25/10/2012, ELQA team Keithley -> PXI controversy Pros of having a PXI on board o Reduction of time needed for the measurements, o Increased precision as the current can be measured at the same time as the voltage across a component of the circuit, o Decreased wear of the multiplexer relays, o Increased versatility of the system Cons o Increased complexity of the user interface, o Communication with the central DB will need to be modified

TE-MPE-TM 25/10/2012, ELQA team Example screenshots