LAUNCH VEHICLE DOWNSELECT A Wide Variety of Launch Systems Are Available Today Initial Downselect Constraint Based Upon UMRM Requirements Primary Payload.

Slides:



Advertisements
Similar presentations
MIT Rocket Team November 20, 2010 Design and Fabrication.
Advertisements

Concept Overview for 2 mt Case “2 mt case”: integrated payloads of no more than 2 mt can be landed on the surface of Mars; extension of current Mars EDL.
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
FEDERAL SPACE AGENCY International conference “Europe space policy: ambitions 2015” Session 1. “General view on propulsion systems: LV of the future”
Secondary Payloads Overview
Ares V RFI Point of Departure Information Package
Exploration Launch Office Scope
Mission Design Requirements First priority is to deliver takeoff mass to aircraft team. Deliver 5kg item to ISS 24 hour launch lead time Vehicle must be.
Launch Vehicles. LAUNCH SYSTEM CONCEPTS SHROUD PROTECTS THE SPACECRAFT SHROUD PROTECTS THE SPACECRAFT MAIN VEHICLE PRIMARY LIQUID OR SOLID ROCKET PROPELLANT.
Launch Propulsion: SMC/LR Perspectives Presented to
Architecture Team Industry Day Briefing 17 January, 2002.
Heavy Launchers by Alain Souchier president Association Planète Mars France EMC11 Neuchâtel, 1 Octobre 2011.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
MAE 4262: ROCKETS AND MISSION ANALYSIS Single and Multi-Stage Rockets September 9, 2014 Mechanical and Aerospace Engineering Department Florida Institute.
Lessons from Apollo * Data from NASA Apollo 11 Press Kit Shows spacecraft weight delivered to LEO (Low Earth Orbit) Shows weights for each portion of Apollo.
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Titan IV Launch Vehicle. Titan IVATitan IVB Titan IV Heritage Reference Information Titan IV Launch Vehicle Titan IV Launch History Select Image or Text.
AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE 450 Spring 2008 Vince Teixeira 28 February 2008 Structures Nose Cone “Sarah”/ Shear Analysis.
1 Atlas Truss Adapter & Launch Vehicle Details (all I can find in the Atlas Mission Planner’s Guide and Standard Interface Spec) David Robinson/543 7/18/08.
Choices: Some Considerations in Configuring Launch Systems Dr. John M. Jurist Adjunct Professor of Space Studies, Odegard School of Aerospace Sciences,
MAE 5495: Launch Vehicle Analysis LECTURE 1 Dr. Andrew Ketsdever Spring 2008.
MAE 5495: Launch Vehicle Analysis and Design Lesson 8: Liquid Propulsion Systems.
THE FUTURE PLANS OF NASA FOR HUMAN SPACE FLIGHT; MISSIONS, LAUNCH VEHICLES.
Rocket Power Introduction to Rockets and Missiles Scott Schoneman.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #18 Gateway To Space ASEN / ASTR 2500 Class #18.
Rocket Power – Part 2 Introduction to Rockets and Missiles Scott Schoneman 4 Nov 03.
Propulsion Engineering Research Center NASA Technology Roadmap: Launch Propulsion Systems Robert J. Santoro The Propulsion Engineering Research Center.
Launch Opportunities for Standardized Payloads kg The 17th Annual Small Payload Rideshare Symposium June 9-11, 2015 Johns Hopkins University Applied.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
Copyright © 2010 United Launch Alliance, LLC. All Rights Reserved.
The Return to Space Exploration Constellation. NASA Authorization Act of 2005 The Administrator shall establish a program to develop a sustained human.
A3 Altitude Test Facility
Dynamic Design: Launch and Propulsion Genesis Launch Vehicle: The Delta Rocket Student Text Supplement.
Constellation Program Overview Mark Geyer Constellation Program Office October 2006.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #14 Gateway To Space ASEN / ASTR 2500 Class #14.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
AAE 450- Propulsion LV Stephen Hanna Critical Design Review 02/27/01.
Copyright © 2008 United Launch Alliance, LLC. All rights reserved. Images Courtesy of Lockheed Martin and The Boeing Company O22P1-478 SPACE Transportation.
Copyright © 2010 United Launch Alliance, LLC. All Rights Reserved.
Mars Today 1 An immediate and inexpensive program for manned Mars visitation.
Delta II 7925H - 10L Baseline workup Launch Vehicle TheirsOurs Delta II 7925H Launch Vehicle 10L Composite Fairing 10L Stretch Composite Payload Fairing.
LRO/LCROSS Launch Preview How Where When Presentation for NASA Solar System Ambassadors and Museum Alliance March 20, 2009 Brooke Hsu, LRO E/PO Lead Brian.
The Shuttle Transportation System Produced by Loren Fletcher (click picture)
Structural Practices Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Structural Design Practices Payload interfaces to launch vehicles.
What Makes Up the Space Shuttle? The space shuttle is the most complex machine ever created by human beings. The first shuttle was launched on April 12,
Learning Goals  I will be able to identify the names of the space shuttles in NASA’s program.  I will be able to identify two shuttle disasters.
CRICOS No J a university for the world real R ENB443: Launcher Systems Image Credit: ESA Caption: The generic Ariane-5 (Ariane Flight 162) lifting.
LEO Propellant Depot: A Commercial Opportunity? LEAG Private Sector Involvement October 1 - 5, 2007 Houston, Texas LEAG Private Sector Involvement October.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #19 Gateway To Space ASEN / ASTR 2500 Class #19.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #19 Gateway To Space ASEN / ASTR 2500 Class #19 T-18.
Hello! I am Ahamath Jalaludeen I am here because I love to give presentations. You can find me at
Mission data MissionTotal mission duration [d]Crew size [-] Total mission Δv [m/s] from LEO (including mid-course corrections) Lunar flyby Low lunar.
Launch Structure Challenge - Background Humans landed on the moon in 1969 – Apollo 11 space flight. In 2003, NASA started a new program (Ares) to send.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
Dave McGrath ACM Chief Engineer February 18, 2010
Flight Hardware. Flight Profile - STS Flight Profile - SLS Earth Mars 34,600,000 mi International Space Station 220 mi Near-Earth Asteroid ~3,100,000.
How Astronauts Got Launched to the Moon Created by: Luke Sharman.
Liquid Rocket Engines Advantages Disadvantages High Isp
Development and Principles of Rocketry
Creating Spacelines to Grow the Smallsat Market
Space Travel Present & Future
Derivation of the FSOA in Ariane 6 Specifications
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Vice President, Business Development
Video ULA.
Team A Propulsion 1/16/01.
Presentation transcript:

LAUNCH VEHICLE DOWNSELECT A Wide Variety of Launch Systems Are Available Today Initial Downselect Constraint Based Upon UMRM Requirements Primary Payload Size TOF Concerns Initial Downselect Constraint Launch Vehicle Should Be Capable of Lifting At Least 10,000 kg into LEO

LAUNCH VEHICLE DOWNSELECT Ariane 5 Atlas V Delta IV ProtonTitan IV Zenit Six Expendable Vehicles

LAUNCH VEHICLE DOWNSELECT EVALUATION CRITERIA 1) Reliability Vehicle Success Rate Family Success Rate 2) Launch Inclination Availability 3) Usable Volume of Largest Fairing 4) Cost 5) Payload Capability To LEO

LAUNCH VEHICLE DOWNSELECT

Atlas V-552 Delta IV-Heavy PRIMARY LAUNCH SYSTEMS

LAUNCH VEHICLE CONFIGURATION ATLAS V-552 Single Common Core Booster (CCB) Powered By A Single NPO Energomash/Pratt & Whitney RD-180 LOX/RP-1 Engine Solid Rocket Boosters (SRB’s) 5 Aerojet SRB’s For Added Performance Fairing 5-m Diameter Composite Fairing Centaur Upper Stage and Adapter Dual Engine Centaur (DEC) Consisting of Two Pratt & Whitney RL10A-4-2 LOX/LH2 Engines

LAUNCH VEHICLE CONFIGURATION ATLAS V-552 LONG COMPOSITE FAIRING 5 m diameter by 23.4 m bisector fairing graphite epoxy face sheets aluminum honeycomb core

LAUNCH VEHICLE CONFIGURATION ATLAS V-552 TYPE D PAYLOAD ADAPTER Marmon-type clampband separation system Requires special payload interface adapter to be manufactured Hardware adapter will attach to the main tank aft structure, surrounding the 7 MITEE engines Must jettison adapter prior to spacecraft’s initial burn

LAUNCH VEHICLE CONFIGURATION DELTA IV-HEAVY 70-m 60-m 50-m 3 Common Booster Cores (CBC’s) Each Powered By A Single Rocketdyne RS-68 LOX/LH2 Engine Interstage Adapter Housing A Single Pratt & Whitney LOX/LH2 RL10-B2 Engine Fairing 5-m Diameter Composite Fairing Encapsulating Payload and Attach Fittings

LAUNCH VEHICLE CONFIGURATION DELTA IV-HEAVY COMPOSITE FAIRING 5 m diameter by 19.1m bisector fairing graphite epoxy foam core composite sandwich structure

LAUNCH VEHICLE CONFIGURATION DELTA IV-HEAVY Delta IV PAF Marmon-type clampband separation system Aft structure of each add-on tank will be designed to accommodate this connection interface