20 October 2008LBT Q3 2008 Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.

Slides:



Advertisements
Similar presentations
About Chelys About Chelys About Chelys Software development and integration for the space sector since 1996 Service provider for some of the most important.
Advertisements

Global Congress Global Leadership Vision for Project Management.
Donald T. Simeon Caribbean Health Research Council
FUNCTIONS OF THE HEALTH SYSTEM. Harmonization of Service Delivery 7.1 Yes 7.1 Yes  HA will provide strategic direction but the regional action /work.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
CS 325: Software Engineering January 13, 2015 Introduction Defining Software Engineering SWE vs. CS Software Life-Cycle Software Processes Waterfall Process.
Design Concepts and Principles
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
LBC-Blue pre-commissioning LBC-Blue LBC-Blue –E Giallongo (PI) Rome: diPaola, Pedichini, Speziali, Testa, Gallozzi Rome: diPaola, Pedichini, Speziali,
Introduction to Computer Technology
Computer Science and Engineering Computer System Security CSE 5339/7339 Session 20 October 28, 2004.
Integrated Growth Pillar 1 of the SEE 2020 Strategy SEEIC Meeting Sarajevo, 19 June 2013.
J. Large Binocular Telescope (LBT) Operational Readiness
N By: Md Rezaul Huda Reza n
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
ACL: Introduction & Tutorial
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Chapter 6 Control Using Wireless Throttling Valves.
FLAO commissioning with InfraRed Test Camera (IRTC) S. Esposito, G. Brusa, A. Riccardi FLAO system external review, Florence, 30/31 March 2009.
End HomeWelcome! The Software Development Process.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
The Grid System Design Liu Xiangrui Beijing Institute of Technology.
Science large collection of science cases for seeing improved imaging and spectroscopy also demand on diffraction limited imaging and spectroscopy (Italians)
Software Quality Assurance
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Chapter 8 Model Based Control Using Wireless Transmitter.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.

1 Characterization of the T/T conditions at Gemini Using AO data Jean-Pierre Véran Lisa Poyneer AO4ELT Conference - Paris June , 2009.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBTO CSQ Subsystem September 19, 2006 Chris Biddick 1 cjb.
Washington State Office of Insurance Commissioner State Insurance Management & Business Application Project Recap November 2007.
LBT Q Software Review GCS – Guiding and Active Optics.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
CIS/SUSL1 Fundamentals of DBMS S.V. Priyan Head/Department of Computing & Information Systems.
Guiding Control Subsystem (GCS) Overview
LBT Q Eng/SW Review MCSC – Mount Control System.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
Chapter 8 Testing. Principles of Object-Oriented Testing Å Object-oriented systems are built out of two or more interrelated objects Å Determining the.
LBT Q Eng/SW Review MCSC – Mount Control System.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
LBT Q Engineering and Software Review ENGG Engineering General.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
1 LBT Q Eng/SW Review PWR: Site electrical power.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
Software development techniques in Albanian private software companies Arbora Dalaci, Esmeralda Kapcari
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Degree programme development
CBP Biennial Strategy Review System
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
Enterprise Algorithm Change Process
Responsibilities & Tasks Week 2
Air Carrier Continuing Analysis and Surveillance System (CASS)
CBP Biennial Strategy Review System ~Meetings Detail~ DRAFT August 29, /6/2018 DRAFT.
CBP Biennial Strategy Review System
Process Evaluation the implementation phase
Programme Management Board
Presentation transcript:

20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña

20 October 2008LBT Q Eng/SW Review1 Highlights PCS Interfaces (GCS, MCSPU) PCS Interfaces (GCS, MCSPU) GCS: Pointing Correction GCS: Pointing Correction Improved algorithm which applies the difference between the PCS “predicted” versus the GCS “measured” guide star location Improved algorithm which applies the difference between the PCS “predicted” versus the GCS “measured” guide star location Better handshaking implemented to indicate when it is OK for GCS to verify the guide star is positioned on the hotspot before closing the guide loop Better handshaking implemented to indicate when it is OK for GCS to verify the guide star is positioned on the hotspot before closing the guide loop MCSPU: PCS Cold Start and New Target Trajectories MCSPU: PCS Cold Start and New Target Trajectories Better handshaking implemented which alleviates having to issue duplicate Presets - “Late” PCS trajectory communication  mount/rotator enters HOLD mode  reduces observing efficiency Better handshaking implemented which alleviates having to issue duplicate Presets - “Late” PCS trajectory communication  mount/rotator enters HOLD mode  reduces observing efficiency The philosophy is the mount should react to the ever-changing pointing demand - PCS is a pure compute engine while MCSPU has the responsibility to recognize discontinuities due to new target requests The philosophy is the mount should react to the ever-changing pointing demand - PCS is a pure compute engine while MCSPU has the responsibility to recognize discontinuities due to new target requests Functionality to Support Instruments Functionality to Support Instruments New functionality allows the observer to reposition where a target is imaged in the instrument focal plane (“hotspot” update) – pointing origin update vs dither. New functionality allows the observer to reposition where a target is imaged in the instrument focal plane (“hotspot” update) – pointing origin update vs dither. Observers can update the effective target wavelength (due to changing filters) and not have to issue a new Preset  improved efficiency Observers can update the effective target wavelength (due to changing filters) and not have to issue a new Preset  improved efficiency

20 October 2008LBT Q Eng/SW Review2 Open Issues Technical Technical Investigation of guiding issues (jumps/jiggles/jitters) Investigation of guiding issues (jumps/jiggles/jitters) Resolve the LBC “guide correction growth” problem  random occurrence Resolve the LBC “guide correction growth” problem  random occurrence Tuning of gains and filters used to modulate the Az/El guiding corrections to avoid over-correction and system oscillation Tuning of gains and filters used to modulate the Az/El guiding corrections to avoid over-correction and system oscillation Discussion on-going and an actual plan being formulated for near-term data collection Discussion on-going and an actual plan being formulated for near-term data collection Thorough examination of kernel guide correction filter and application Thorough examination of kernel guide correction filter and application Resolve high elevation guide oscillations (somewhat addressed in new kernel) Resolve high elevation guide oscillations (somewhat addressed in new kernel) Achieve definitive understanding of the various kernel angles, transformations, and trajectory offsets to apply a comprehensive solution for each instrument Achieve definitive understanding of the various kernel angles, transformations, and trajectory offsets to apply a comprehensive solution for each instrument Evaluate and utilize the updated (and slightly incompatible) pointing kernel Evaluate and utilize the updated (and slightly incompatible) pointing kernel Schedule Schedule Concern not enough on-sky testing time for technical observing Concern not enough on-sky testing time for technical observing Primarily weather, but also sky time scarce resource for testing (unit and integration) Primarily weather, but also sky time scarce resource for testing (unit and integration) Reconcile expectations when programmer participating in on-sky instrument support and required to implement new and robust functionality Reconcile expectations when programmer participating in on-sky instrument support and required to implement new and robust functionality Financial Financial Continued support for RAL consulting Continued support for RAL consulting Resource Resource None None

20 October 2008LBT Q Eng/SW Review3 Planning (Q4/2008) Resolution of the “Open Issues” (Oct…) Resolution of the “Open Issues” (Oct…) Initiation of a new PCS GUI (Dec) Initiation of a new PCS GUI (Dec) Incorporates the functionality from current PCS and Preset GUIs Incorporates the functionality from current PCS and Preset GUIs Provides additional control and monitoring Provides additional control and monitoring Sets the migration path for binocular support Sets the migration path for binocular support Implement telemetry module Implement telemetry module True Binocular Support (Dec…) True Binocular Support (Dec…) Implementation of basic structural modifications to PCS to accommodate the binocular arbitrator (Dec…) Implementation of basic structural modifications to PCS to accommodate the binocular arbitrator (Dec…) Define/design interface between the PCS and PSF for the tip/tilt computation (Q1/2009) Define/design interface between the PCS and PSF for the tip/tilt computation (Q1/2009) Elaborate/design the model for co-aligned and misaligned observations (Q1/2009) Elaborate/design the model for co-aligned and misaligned observations (Q1/2009) Implementation commencement – LBC emphasis (Q1/2009) Implementation commencement – LBC emphasis (Q1/2009)