M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 1 PEP ITPA Working Group on RMP ELM Control: 2 nd Inter-Meeting.

Slides:



Advertisements
Similar presentations
Leon County Schools Performance Feedback Process August 2006 For more information
Advertisements

Stability, Transport, and Conrol for the discussion Y. Miura IEA/LT Workshop (W59) combined with DOE/JAERI Technical Planning of Tokamak Experiments (FP1-2)
A. Kirk, 21 st IAEA Fusion Energy Conference, Chengdu, China, October 2006 Evolution of the pedestal on MAST and the implications for ELM power loadings.
HPV Policy Evaluation Update on Workgroup Progress R4 Air Enforcement Workshop November 2012.
Effective Project Management: Traditional, Agile, Extreme
1 st ITPA T&C Meeting, Milan, October WAHPage 1 ITER R&D Needs for Transport & Confinement W.A. Houlberg ITER Organization 1st ITPA Transport.
The Lumina Center Grantseeking Workshop Series Presents Outcomes & Evaluations April 20, 2006.
The Proposal. Project Proposals Genesis of Proposals: They can result for formal requests (e.g. Request For Proposal, RFP) They can be unsolicited (e.g.
19/20 May 2015, Riga “From Gaps to Caps – Risk Management Capability Based on Gaps Identification in the BSR” TASK D COMPARISON OF EVALUATIONS OF EMERGENCIES.
Teacher Appraisers receive copy of new PDP and policy ‘quiz’ for completion by Weds 17 Sept (Twilight) Weds 10 Sep Introduction Training Appraisers Create.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working Vale of Glamorgan Council Final Report- July 2008.
Report on ITPA-IEA CTP Meetings Dec 13-16, 2010; Cadarache, France Coordination and Implementation of Collaborations in International Tokamak Fusion R&D.
M.E. Fenstermacher - Summary of Progress and Outlook for Work Plan in PEP ITPA WG on RMP ELM Control 4/23/09 11:15 PM 1 PEP ITPA Working Group on RMP ELM.
Report on W66 at W69 M. L. Watkins 1 (4) MIT, Cambridge, MA, USA, 11 December 2008 Report on Sixth Joint Workshop (W66) “Implementation of the ITPA Coordinated.
ITPA - IOS st Oct Kyoto E. Joffrin JET programme with the ILW in and relations with the IOS Joint experiments.
REVIEW OF CMS “INITIAL APPROVAL” OF RHP PLAN AND FOLLOW-UP REQUIREMENTS May 8, 2013 REGION 10.
H-mode characteristics close to L-H threshold power ITPA T&C and Pedestal meeting, October 09, Princeton Yves Martin 1, M.Greenwald, A.Hubbard, J.Hughes,
ITER Design Review Physics Issues by R. J. Hawryluk presented at Budget Planning Meeting March 11, 2008 With special acknowledgements to D. Campbell, G.
Status and Plans Transport Model Validation in ITER-similar Current-Ramp Plasmas D. R. Mikkelsen, PPPL ITPA Transport & Confinement Workshop San Diego.
9th ITPA Confinement Database and Modelling Topical Physics Group meeting in St. Petersburg 1/5 NF paper on H-mode confinement DB3 Darren McDonald.
Status of the ASDEX Upgrade Tokamak Programme Hartmut Zohm MPI für Plasmaphysik, EURATOM Association Joint Executive Committee session of IEA-IAs on Pol.
High Potential & Succession Management AIHA Talent Review Prepared by ??? For ??? Meeting – ???
Research Supervisor Training Programme Regulations & Processes.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
L-H threshold database: Status and Plans J.W. Hughes, J. Stillerman, MIT PSFC Y. Martin, CRPP-EPFL P. Gohil, GA D. McDonald, JET-EFDA Meeting of the ITPA.
Student Growth Measures in Teacher Evaluation Using Data to Inform Growth Targets and Submitting Your SLO 1.
M.E. Fenstermacher - Status of Progress on Work Plan in PEP ITPA WG on RMP ELM Control 12/5/07 11:15 PM 1 PEP ITPA Working Group on RMP ELM Control: 1.
High  p experiments in JET and access to Type II/grassy ELMs G Saibene and JET TF S1 and TF S2 contributors Special thanks to to Drs Y Kamada and N Oyama.
Yves Martin Centre de Recherches en Physique des Plasmas Association Euratom - Confédération Suisse Ecole Polytechnique Fédérale de Lausanne (EPFL) CH.
Resonant magnetic perturbation effect on the tearing mode dynamics in EXTRAP T2R: experimental results and modeling L. Frassinetti, K.E.J. Olofsson, P.R.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
A. Kirk, ITPA Pedestal meeting, GA, 30 April H-mode pedestal characteristics on MAST A.Kirk, T. O’Gorman, R. Scannell Addition of new data at low.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Planned Theory Contributions to the FY’2011 Joint Research Target on Pedestal Research R. J. Hawryluk Thanks to the Pedestal Working Group: C-S Chang,
Supported by Imaging the Pedestal Island Structure during the Application of 3D Magnetic Perturbations Office of Science D.J. Battaglia 1*, M.W. Shafer.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Introduction of 9th ITPA Meeting, Divertor & SOL and PEDESTAL Jiansheng Hu
E. Doyle (Chair), V. Mukhovatov (Co-chair) for the ITPA Transport Physics Group 2nd IEA Large Tokamak Workshop on Implementation of the ITPA Coordinated.
Integrated Operation Scenarios ITPA Remaining duties ITPA CC meeting & IEA/ITPA JE planning meeting –12 – 14 (15) December 2011, Cadarache –Ide, Sips and.
1/5 D. C. McDonald et al, Status of the ITPA paper “Recent progress of the ITPA global H-mode confinement and pedestal databases”, Kyoto, 18-20th Apr 2005.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Task Force S1 J.Ongena 19th IAEA Fusion Energy Conference, Lyon Towards the realization on JET of an.
RFX workshop / /Valentin Igochine Page 1 Control of MHD instabilities. Similarities and differences between tokamak and RFP V. Igochine, T. Bolzonella,
PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION International Plan for ELM Control Studies Presented by M.R. Wade (for A. Leonard)
TPB Structure St.. Petersburg NEXT STEPS IN PROCESS Approach identified participants to ensure they are willing/able to participate Section coordinators.
4th Transport/ITB IPTA Meeting, St Petersburg, 8-12 April Role of Edge Current in ELM Behaviour: Modelling of Recent Current Ramp Experiment in.
DISCUSSION OF ISSUES, OPPORTUNITIES AND CONCLUSIONS FOR ROTATION AND MOMENTUM TRANSPORT SESSIONS 10th ITPA Transport Physics and CDBM TG Meetings Princeton.
TRANSP for core particle transport studies M. Maslov.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
SUMMARY OF 4th IPTA TRANSPORT AND ITB PHYSICS TG MEETING St. Petersburg, Russia, April 8-11, 2003 Presented by E.J. Doyle for the TG Note: this summary.
18th International Spherical Torus Workshop, Princeton, November 2015 Magnetic Configurations  Three comparative configurations:  Standard Divertor (+QF)
PPAI Decadal Prediction/Predictability/Variability –Reviewed the WGCM/WGSIP Decadal Prediction Experiment –Reviewed/Revised Decadal WG Prospectus Reviewed.
Page 1 Alberto Loarte- NSTX Research Forum st - 3 rd December 2009  ELM control by RMP is foreseen in ITER to suppress or reduce size of ELM energy.
Development and Assessment of “X-point limiter” Plasmas M. Bell, R. Maingi, K-C. Lee Coping with both steady-state and transient (ELM) heat loads is a.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Status of NSTX/DIII-D/MAST aspect ratio core confinement comparison studies M. Peng, for E.J. Synakowski For the ITPA Transport Physics Working Group Kyota,
Andy Wilson – Team Manager HR Education (School Teacher Appraisal) (England) Regulations 2012 A briefing for Heads and Governors.
Programme Description The Duke CE Advanced Certificate in Management for Oil and Gas (NQF Level 8) is aimed at Middle Managers making a transition to Senior.
Boundary Physics Breakout Session was a Good Start Breadth of topics: many issues pointed out in three plenary talks: pedestal, SOL/div/PFC, and technology,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
QUALITY IMPROVEMENT [SECOND]/[THIRD] QUARTERLY COLLABORATIVE WORKSHOP
Distribution Workgroup 24/11/16
Internship orientation: Research module basics
Andrew Kirk on behalf of
L-H power threshold and ELM control techniques: experiments on MAST and JET Carlos Hidalgo EURATOM-CIEMAT Acknowledgments to: A. Kirk (MAST) European.
D 4 Food webs Process: two open workshops WGGES consultation
Max-Planck Institut für Plasmaphysik Garching
Adult Education Survey Anonymisation Point 6
No ELM, Small ELM and Large ELM Strawman Scenarios
Presentation transcript:

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 1 PEP ITPA Working Group on RMP ELM Control: 2 nd Inter-Meeting Conference Call M.E. Fenstermacher (chair) M. Becoulet, P. Cahyna, C.S. Chang, T.E. Evans, A. Kirk, Y. Liang, A. Loarte, R. Maingi, O. Schmitz, W. Suttrop, (members) Conference Call by H.323 Remote Participation September 2, 2009

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 2 Purpose –PEP ITPA Work Plan on RMP ELM Control: review of actions, objectives, timescales, and proposals for modifications where necessary. Deliverables –Progress against the work plan in RMP ELM Control Area –Start on formulation of answers to some of the questions, or plan how to address others –Sufficient information for presentation of the status, covering: Questions that have now been answered Strategy to address those questions that cannot yet be answered New questions that the group should address. Purpose, Deliverables and Agenda for this Meeting

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 3 H. Wilson Requested Information at the PEP ITPA Meeting in Cadarache - Similar Request Appropriate for October at PPPL –At our next ITPA Pedestal Group meeting in Cadarache, April, one of the items for review and discussion will be the work plan that was submitted to the CC in December. This work plan, was approved. It is very adventurous, but needs to be. –At each meeting I would like us to spend some time reviewing the actions, objectives and timescales, and make modifications where necessary…. Now would be a good time to take stock of the progress against the work plan in each of these areas, and perhaps start to formulate answers to some of the questions, or to plan how to address others. –In Cadarache, could the working group leaders (or their delegated representative) present the status, covering (for discussion): (a) questions that have now been answered; (b) a strategy to address those questions that cannot yet be answered, and (c) new questions that the group should address.

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 4 H. Wilson Requested Information at the PEP ITPA Meeting in Cadarache - Similar Request Appropriate for October at PPPL (Are you) each happy with the approach we are taking to address the ITER urgent issues (see workplan attached) (Are you) able to come to the next formal ITPA pedestal meeting with –a proposal to meet the workplan objectives, revised if necessary, for discussion and agreement. I suggest that your roles at the formal ITPA meetings will include (You may choose to delegate parts of this to your working group members): (a) summarizing the status of the answers to the key questions and objectives in the workplan (you probably already have some answers to key questions); (b) suggesting revisions to the workplan to be approved by the ITPA pedestal members; (c) chairing a discussion of the approach to address your area; (d) assigning actions of work to be performed between formal ITPA meetings, and (e) providing a BRIEF written summary (1-page max) of progress following each formal ITPA meeting, for the meeting minutes.

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 5 H. Wilson Requested Information at the PEP ITPA Meeting in Cadarache - Similar Request Appropriate for October at PPPL We would like to propose that you organize one teleconference meeting half- way between each of the formal ITPA meetings –In order to monitor progress on the ITER tasks and actions set at the formal meetings –Perhaps we can use the ITER video-conferencing system as the hub for all of these meetings (Alberto to confirm). –It would be good if you are each able to organize one teleconference meeting of your groups before the next formal ITPA meeting so that you can receive the necessary input for your summary presentation there (though I appreciate that time is short).

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 6 PEP ITPA Work Plan in RMP ELM Control Based on 4 Assumptions The complete suppression of ELMs on DIII-D by RMPs, while not eg. on JET, is because the DIII-D coils are off-midplane, as presently designed for ITER –Only MAST and DIII-D are presently in a position to test ITER-relevant coils. –AUG will also be in this position from mid-2010 –Both MAST neutral beam are assumed to be operational early in 2009 to provide reliable ELMing H-modes Appropriate machine time, experimental and theoretical manpower are made available The criteria (to be validated) based on a minimum stochastic layer region (width) and alignment of the perturbation with q(r), are the main requirements for ELM suppression –If this proves not to be the case, other model development (including plasma response) and tests will be required. The target date for input to ITER IO on RMP coil design is Sept 2010, but results will be communicated as they are produced in advance of this date.

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 7 PEP ITPA Work Plan in RMP ELM Control Now Contains 8 Elements Reproduce RMP ELM suppression on at least one tokamak other than DIII-D Identify the criteria for ELM suppression from experimental data and theoretical models Quantify the impact of ELM suppression by RMPs on the pedestal pressure and core confinement and develop/validate theoretical models Quantify the power loading on the wall and divertor with RMP-suppressed ELMs; make recommendations on any requirement for rotating RMPs Explore the capability to suppress or mitigate ELMs during the current ramp phase (ie. close to the L-H transition threshold, and with time varying q95) Demonstrate ELM control with ITER-like pellet fuelling Investigate potential for ELM Pacing by RMP coils Model the performance of the ITER ELM control coil set, and propose changes to the design as appropriate; likely to require further developments in modeling the plasma response (challenging)

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 8 RMP ELM Control WorkPlan Revised July 2, 2009 Hatched areas indicate an extension compared to the original plan ITPA Coordinating Committee chair R. Stambaugh suggested that ELM Pacing with RMPs be added

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 9 Progress Toward Work Plan Goals Was Reported to the ITPA Coordinating Committee in July Progress is being made in understanding parameters that appear to influence ELM suppression. –These include q95 resonance, collisionality, density pump-out, beta, and island overlap width. –DIII-D initially suggested that island overlap width was a good ordering parameter for maximum ELM size and that ELM suppression was correlated with achieving a minimum island overlap width. Recent results from MAST now demonstrate that while this may be a necessary condition, it is not sufficient. –Major tasks: 1) quantify the importance of each of the important parameters, and 2) understand that importance in terms of a physically- motivated theoretical model. –Although both MAST neutral beams are now operational, providing reliable ELMing H-modes, complete ELM suppression has not yet been observed in MAST, so it will be necessary to adjust tasks and timescales. –Plans are progressing for the installation of a very flexible coil set on AUG for operation in 2010 (the full capability is expected to be available from 2011).

M.E. Fenstermacher - 2nd Inter-Mtg Conf Call, PEP ITPA WG on RMP ELM Control 8/31/09 18:05 10 Agenda (times are PDT, UK add 8, EU add 9 hours) 8:30 FenstermacherAgenda, Purpose, Deliverables, Work Plan Summary 8:40M. BecouletSummary of Theory progress toward work plan 8:48O. SchmitzSummary of TEXTOR progress toward work plan 8:56P. Cahyna Summary of COMPASS progress toward work plan 9:04A. KirkSummary of MAST progress toward work plan 9:12Y. LiangSummary of JET progress toward work plan 9:20R. MaingiSummary of NSTX progress toward work plan 9:28T. EvansSummary of DIII-D progress toward work plan 9:36W. SuttropSummary of AUG progress toward work plan 9:44AllDiscussion of questions answered, strategy for remaining questions, new questions 10:00Adjourn