STORM IMPACT THE CLARE EXPERIENCE. Tom Tiernan SE, Clare Co Co Cyril Feeney SEE, Clare Co Co.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

Queensland Flood Table Top Exercise.
Case study: coastal management in Holderness
1A2 Geography 10 th February 2015 Objectives: To introduce students to the causes and effects of earthquake activity. To briefly explain measures taken.
1970’s Natural Disasters By: Austin Klingaman, Cole Johnson, Lucas “Cookie” Cook.
What is a hurricane? A severe, rotating tropical storm with heavy rains and cyclonic winds exceeding 74 mph.
Major Hurricane Earl Advisory 34 North Carolina – Threat Assessment Prepared at: 5 PM Thursday September 2, 2010 Hurricane and Tropical Storm Warnings.
Birr Public Realm Work achieved to date February
By Andrew Burke, James Ferguson and Chris Silins.
Caribbean Disaster Mitigation Project Caribbean Institute for Meteorology and Hydrology Impacts of Tropical Cyclones Horace H. P. Burton and Selvin DeC.
Section 3: Tides Preview Objectives Tides The Causes of Tides
Our Changing coastline
Case Study: Christchurch Bay
© Crown copyright Met Office Enhanced rainfall services Paul Davies.
Roger Robertson Samuel Olson
Ensemble storm surge forecasting in the UK during the exceptional 2013/14 winter Helen Titley Senior Weather Impacts Scientist, Met Office, UK With thanks.
UNIT 7 The Earth’s dynamics Natural Science 2. Secondary Education HISTORIC EARTHQUAKES.
Potential Historic Winter Storm February 8-9, 2013 Briefing Summary: 830 AM Thursday, February 7 th, 2013 National Weather Service Boston, MA.
HISTORIC WINTER STORM (FEBRUARY 8-9, 2013) CONFERENCE CALL Wednesday 2:30 PM February 6, 2013.
Visualizing Hurricanes A multimedia lesson about hurricanes, storm surge, and scientific visualizations from models
Coastal Erosion in West Africa. The Issues n Rapid erosion of around 8 m per year n Affects a 2000 km stretch of coastline from Ivory Coast to Nigeria.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
Hurricanes.
South Carolina Coastal Geography
Bangladesh BY ELLIE JOHNSTONE. Tuesday, 14 April 2009  Physical factors:  Sources of rivers are in Himalayas so snowmelt adds to the discharge during.
Cyclones. What are cyclones? 0 Cyclones are giant, spinning whirlwind storms. In order for a cyclone to be identified as a cyclone, it must be travelling.
(Project based of WebQuest)
HURRICANE FLOYD IF YOU WERE IN THE MIDDLE OF A HURRICANE WHAT WOULD DO? By: Javari Parker.
The small Cornish village of Boscastle is not prone to regular annual flooding as many locations affected by extreme flooding events are. The village.
Hurricane Katrina: HEI and its impact. What is a Hurricane? A hurricane is a tropical storm with winds greater than 119km/h. Hurricanes also have very.
Flood Disaster Math Water, Wind and Earth Game By Grace!
Explorers Education Programme: Flooding & Coastal Communities.
Date: 1/27 (A) and 1/28 (B) Outcome: Students will understand that weather is a result of complex interactions of Earth's atmosphere, land and water, that.
Natural Disasters in Latin America
2004 INDIAN OCEAN TSUNAMI (BOXING DAY TSUNAMI) JACK MEEKS NICOLE WHITE ANA HEIMULI ANTONE BURBIDGE.
Hurricanes!! By Sarah Johnson Mr. Shepard’s 2 nd block.
Sea Level Rise in the North East Jennifer Iacono.
A flood happens when too much rain falls brought by stormy weather and stormy winds. Rivers burst their banks and the water spills onto the land strong.
11 October 2011 JANE MOON IMPACT OF THE TERMINAL GROYNE ON SEDIMENT TRANSPORT IN MINEHEAD BAY SENIOR GEOMORPHOLOGIST.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
Barrier Islands… The low down.. On these important depositional features The low down.. On these important depositional features.
Hazards: Take Control TSUNAMI By NEMO Saint Lucia.
Hightown Dune Restoration Scheme and the River Alt Update – September 2013 Graham Lymbery Sefton Council.
Boscastle Floods, 16 th August Boscastle Floods, 16 th August 2004 – Causes:  Over 70mm of rain fell in just two hours  The ground was already.
Holderness in East Yorkshire is the fastest eroding coast in Europe (c.1m/yr average, but 10m + in some places). Traditionally, management strategies have.
Hurricanes. Hurricane a storm system with a large low-pressure center with many thunderstorms produces strong winds and heavy rain.
Hurricane s. What conditions lead to the development of Hurricanes?
By Max Müller October 1954 Canadian Geography 11.
Flooding: Changes Around the Firth Mark McLaughlin Senior Hydrologist (Flood Map Manager) Scottish Environment Protection Agency Firth of Clyde Forum -
Significant and Potentially Dangerous Coastal Storm Tuesday Night into Wednesday March 25 th – 26 th, 2014 National Weather Service Monday Afternoon March.
Applied Fieldwork Enquiry
What would you do? You are a planning officer responsible for choosing the best coastal defences to use for a number of different places. You need to look.
OPW FLOOD DEFENCE WORKS
Update on SEAI activities relevant to Belmullet
The Ecology of the Australian Landscape
2013/14 Coastal Storms and Emergency Response in Dorset
Natural Disasters in Latin America
Mid-Latitude Weather Systems
PowerPoint 10: Coastal management at Lyme Regis
2013/ 2014 Stormiest period of weather experienced by the UK for 143 years 12 major winter storms affecting the UK, from mid-December to early January.
Coastal defence (management) against flooding and erosion.
U.S. Army Corps of Engineers Coastal Storm Risk Management
North Atlantic Coast Comprehensive Study Collaboration Webinar Series #2: Ecosystem Goods and Services U.S. Army Corps of Engineers Coastal Storm Risk.
BARBADOS BASIC FACTS AREA:- 170Sq Mls POPULATION:- 255,000 (1990)
…And Their Coastal margins
Hard Engineering Case Study
CLIMATE.
Mark Adamson Office of Public Works 27th February, 2019
Presentation transcript:

STORM IMPACT THE CLARE EXPERIENCE. Tom Tiernan SE, Clare Co Co Cyril Feeney SEE, Clare Co Co

Overview 1.Inland Flooding – large scale in Ennis and South East Clare 2.Inland Flooding – lesser scale at various other locations 3.Wind Damage 4.Coastal Storm Damage

Inland Flooding Ennis – town centre flooding and several locations in environs – 1995, 1999 and 2009 Coincidence of elevated river levels, high tide and South West wind Approximately 80% resolved by relief schemes to date

Inland Flooding 2 South East Clare – extreme inundation in mostly rural area in Counties Clare and Limerick Very elevated river Shannon forced to bypass Ardnacrusha – most recent extreme, Future – depends on CFRAMS recommendations to emerge in 2015

Inland Flooding 3 Smaller scale flooding issues in North and East Clare Backup of overwhelmed sub- terranean systems- Karst Limestone

Effect of Inland Flooding. Roads become impassable in most cases Resolution – Flood Relief Schemes, Drainage Schemes or Road Upgrade or various combinations of same Some success in recent years in Clare

Wind Damage Coastal – public and private property – Dec/Jan/Feb of 2013/14 Coastal and inland on Feb. 12 th,2014 – public and private property including large scale tree damage. Highest recorded gust in country in Shannon – almost 160km/hr – 1,000 trees lost.

Tree Damage

Climate Change

Coastal Storm Damage Weather pattern change in Mid- December, 2013 Development of Extreme Low Pressure centres in Atlantic Coincidence of high winds off low centres with associated ocean swells impacting directly onto coast at time when Spring Tide were peaking

Storms Coastal storms occurred on January 3 rd and 6 th and on February 1 st All in coincidence with extremely high tide in early morning All exacerbated by ocean swell varying between 0.5 and 1m Slight variation in wind direction resulting in different damage locations

Severity Damage at 35 public infrastructure locations along entire coastline in January Devastation in private areas also eg Doonbeg Golf Club

Nature of Damage Demolition/undermining of sea walls Resort facilities destroyed Dune systems compromised or removed Roads compromised or destroyed 1000’s of tons of sea rubble and shingle thrown long distance inland Examples to follow:

New Quay

Over 3km of coast road damaged Coastal defences found to be inadequate and need to be reinstated/strengthened Total estimated cost of remediation: €3.8million

Lehinch

Rock armour defences destroyed over a distance of more than 1.5km Promenade walls damaged/removed Promenade undermined and pulverised by wave power Damage to car parks, playground and a variety of other facilities Total estimated cost of remediation: €6.7 million

Cloughaninchy

Dune system obliterated or seriously eroded over a distance of 2.2km Up to 20 houses / Road network left exposed to wrath of next Spring tide Potential for Seafield Pier/ peninsula to be cut off permanently Estimated cost: €5.2 million

Kilkee

Several significant breaches in historic sea walls Major wall destabilisation resulting in collapse of Strand Line Destruction of extensive paved spaces, walkways and various other structures. Estimated cost €1.3m

Kilbaha

Total destruction and undermining of significant sections of sea wall 150m of Regional road completely removed along with supporting sea wall – no road through village for 6 weeks Total estimated cost of remediation: €3.5 million

Works completed Clean up at all 40 sites (twice in some cases) Roads, tourism and harbour infrastructure restored to fulfil normal function Additional restoration works carried out and ongoing at tourist resorts

The Cost Overall estimated damages: January €27.2 million February €10.9 million TOTAL €38.1 million

Cost Breakdown Estimated damages by category: Clean up €1.39 million Roads €3.12 million Tourism €2.04 million Piers/Harbours€0.34 million Coastal Restoration €13.06 million Coastal Strengthen €14.27 million Contingency Sum €2.9 million

Funding Confirmation of availability of €16.8 million to date based on January application Application to strengthen coastal defences damaged in January - €12.1 million – decision awaited Application for funding to deal with February damage - €10.9 million – decision awaited

Issues Issues to be considered to facilitate implementation of remediation: Planning requirements Environmental issues/designations Prioritisation Procurement of consultants Procurement of works Timescale and programme

Main Issue

Thank You