8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish.

Slides:



Advertisements
Similar presentations
Schedule Risk Analysis (SRA) Tariq Ashraf Systems Engineering Feb 24, 2005.
Advertisements

AACEI Contingency Forum Contingency Management
PROJECT RISK MANAGEMENT
1 Overview of Simulation When do we prefer to develop simulation model over an analytic model? When not all the underlying assumptions set for analytic.
11 Simulation. 22 Overview of Simulation – When do we prefer to develop simulation model over an analytic model? When not all the underlying assumptions.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
©2001 Plan B Systems Inc. PBSi Quantitative Cost/Schedule Risk Analysis.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Use of Physical Simulation, Computer Simulation and a Common Product in a Series of Courses to Illustrate Industrial and Manufacturing Engineering Technology.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
5-1 DoD Risk Management Policies and Procedures. 5-2 Risk Assessment and Management (DoD ) “Program Managers and other acquisition managers shall.
Overview Lesson 10,11 - Software Quality Assurance
Some Experience With COSYSMOR At Lockheed Martin
Fundamentals of Information Systems, Second Edition
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
1 Introduction to System Engineering G. Nacouzi ME 155B.
COSYSMO Risk/Confidence Estimation Prototype John Gaffney March 14, 2005.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
1 SOFTWARE PRODUCTION. 2 DEVELOPMENT Product Creation Means: Methods & Heuristics Measure of Success: Quality f(Fitness of Use) MANAGEMENT Efficient &
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Other Planning Processes: Final Planning Touches
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Project Risk Management
University of Palestine software engineering department Testing of Software Systems Fundamentals of testing instructor: Tasneem Darwish.
Edward B. Farkas, Managing Director, Project Management Practice
From Research Prototype to Production
After Lesson 6 next is Lesson 13 to fit topic on Software Development SOFTWARE PROJECT MANAGEMENT.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish.
Chapter 8 Managing Project Risk Copyright 2012 John Wiley & Sons, Inc. 8-1.
MARCH 1 Risk Management Why carry out Risk Assessment? l Is the project too risky? l Threat intensity? l Improve decision making l Clarification of terms.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
1 Chapter 5 Project management. 2 Project management : Is Organizing, planning and scheduling software projects.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Achieving peak performance in contracting for services Presentation to the 10 th IPPU CPD Grand Imperial Hotel 31 st March, 2012 John F. A. Etidau.
Lockheed Martin Aeronautics July 4, Managing Customer Expectations Through an Integrated Approach to Risk Management, Program Performance Measures,
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Welcome to Session 3 – Project Management Process Overview
Outline of Chapter 9: Using Simulation to Solve Decision Problems Real world decisions are often too complex to be analyzed effectively using influence.
Review of Software Process Models Review Class 1 Software Process Models CEN 4021 Class 2 – 01/12.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
SOFTWARE PROJECT MANAGEMENT
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Information Technology Project Management Managing IT Project Risk.
What is project management?
7-1 Decision Analysis Exercise Your decision is whether or not to conduct a final system level factory test on a ground based radar or repair/replace the.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Toward A Framework for Implementing Systems Engineering Development for Complex Systems Karl L. Brunson, GWU Thomas A. Mazzuchi, D.Sc., GWU Shahram Sarhani,
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
What is a WBS? A Work Breakdown Structure is not a list of tasks, a schedule or an organization chart. Rather it provides the basis on which a task.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
Managing Project Risk Chapter 8 Copyright 2012 John Wiley & Sons, Inc.
Project Activity and Risk Planning
Schedule Risk Assessment (SRA) Overview
CIS12-3 IT Project Management
Schedule Risk Assessment (SRA) Overview
Schedule Risk Assessment (SRA) Overview
Schedule Risk Assessment (SRA) Overview
Presentation transcript:

8-1 Establish Cost/Schedule Performance Impacts Program Requirements Assess Risks Evaluate Risk Handling Options Evaluate Subcontractor Risks Establish Cost Schedule/ Perf Impacts Manage Risks Identify Key Ground Rules Identify Risk Factors Estimate Effect On Cost Establish Management Reserves Estimate Effect On Schedule

8-2 Changing Acquisition Environment Aeronautics Systems Center has implemented a new proposal evaluation process. What’s In - New low cost criteria termed “Most Probable Life Cycle Cost.” What’s Out - Credibility of “single point estimate” in contractor bid.

8-3 Who Is “Low Cost” In the Example Below? Contractor A Contractor B Contractor C 8M* 10M 12M 15M 14M* 15M 20M 18M 16M* Contractor Bid ASC Assessment of Most Probable Cost (i.e., 50%) ASC Assessment of 90% Cost Confidence

8-4 What is Most Probable Cost Based On? Answer - The 90% cumulative probability span time in the government’s Most Probable Schedule. How does the government prepare a “Most Probable Schedule”? They perform a risk assessment of our proposal and map the risk into our proposed schedule.

8-5 What Are The Impacts Of the New ASC Source Selection Process? 1. Schedules will need to be prepared early in the proposal development cycle. 2. Risk should be identified and mapped to the proposed schedule. 3. A Most Probable Schedule should be developed and “pushed” to the left to help squeeze out cost.

8-6 OUTLINE What is a Scheduled Risk? What is the purpose of Assessing Schedule Risk? How can an assessment of Schedule Risk be Performed? Examples of Schedule Risk Assessments(SRA) How can we use SRA during: Pre-Proposal Discussions Proposal Development Contract Implementation What are the tools with which to perform SRA?

8-7 Definition What is a Schedule Risk? The likelihood of a schedule delay and the magnitude of the delay. Note:Schedule risk can be characterized as high, medium, or low depending on the level of disruption to the program schedule.

8-8 Purpose of Assessing Schedule Risk Verify that schedule risk drivers have been accounted for (i.e., concurrency of design/test/production, interrelations between tasks and teams, requirements stability, etc.). Provide basis to evaluate worth of schedule risk abatement options.

8-9 Common Schedule Risk Factors Concurrency (Design/Test/Production) Interrelations (between IPD Team/Functions) Funding (Timely Turn-On) Requirements Availability Requirements Stability Degree of state-of-the-art Commonality with previous systems Number/historical performance of subcontractors Lead times (materials, etc.) Amount and complexity of software required Number and complexity of engineering drawings Testing requirements (Timely Development) Tests (number of hours\ required or number of successful flights) Amount of new materials being used Facilities Availability Manpower Availability Equipment Availability Producibility Improvements Urgency/priority of the program Contractual incentives for meeting program schedule

8-10 Schedule Risk Assessment Methods 1. Experience Based Reviews - Recollection of lessons learned from similar work. 2. Technical Content Assessment - Analysis of empirical data on specific tasks. 3. System Level Modeling/Simulation - Computer-based representation of schedule.

8-11 Technical Content Assessment Example 1 What is the expected schedule duration for a 500 hour durability life test on an avionic subsystem given that a large number of spare subsystems are available? 500 hr 8 hr/day =62.5 days ? ?

8-12 Technical Content Assessment Example 1 (Cont.) Analysis of data on a similar avionic subsystem test shows that when: Mean time between maintenance action is 3.5 hr Mean time to remove and restore is 19 hr, and Test facility availability is 80% Schedule Duration is 502 days!! What if the number of spares is limited?

8-13 Technical Content Assessment Example 2 Simulation Flow Compute run time to failure  Run Times Met 500 hour req’t? Spare available ? Compute remove and restore times Compute remove repair and restore times  Down times &  # failures Running this simulation flow repeatedly and plotting the results in a histogram format is a Monte Carlo simulation technique for estimating the calendar time and generating a final schedule estimate for conducting a durability test. NY N Y Stop Start

8-14 Technical Content Assessment Example 2 (Cont.) # of Occur- rences Test Duration (Days) Assumptions: 500 hour Dur. Test No Spares Limitation 3.5 hour MTBMA

8-15 Technical Content Assessment Example 2 (Cont.) Test Duration (Days) ($) # Equivalent Ship Sets ($) (1000 Monte Carlo runs) % Mean 10%

8-16 Show Schedule Risk Presentation

8-17 How to Leverage Applications of SRA Experienced Based Reviews Technical Content Assessment System Level Modeling/Simulation Pre-Proposal Discussions Proposal Development Contract Implementation High Risk Tasks As Required to Defuse Complex Issues Discretion of P.M.

8-18

8-19

8-20

8-21 Risk + - Add-on tool for Microsoft – Add-on tool for Microsoft Excel

8-22 Cost-Schedule Containment Chart