Natural air drawn into horizontal slots in cladding, with pressure differentials generated by aerodynamic form of building drive natural ventilation. Architects.

Slides:



Advertisements
Similar presentations
Doors and Windows.
Advertisements

DOORS AND WINDOWS.
Buildings and Structures 1
Dr. Ruth Collins TrinityHaus
Space and shell structures
Concrete Fooring & Roofing System
Heavy Concrete Construction Formwork
Glenn Murcutt Anna James Construction & Structures 2 SRT251.
Gravity Force Resisting Systems
Mag Hansen - Hansen UnitAl Presentation Hansen UnitAl Hansen UnitAl a unique system for prefabricated elements.
Do Now: 1. Update your CAD II Notebooks 2. Answer the following on the Do Now Slide of your Notebooks: Based on what you know about materials used to create.
S R T C O N S T R U C T I O N & S T R U C T U R E S M A J O R A S S I G N M E N T M A T T H E W S Q U I R E
Technology in Architecture Lecture 10 Mechanical Systems Lecture 10 Mechanical Systems.
Heavy Timber Materials and Methods. What is Heavy Timber Type 4 Construction Heavy timber also referred to as Mill construction or slow burning construction.
Passive Heating and Cooling
An Najah National University Building Engineering Department Potential Energy glazing Technologies For Highly Glazed Buildings in Palestine Prepared by.
Kevin de almeida construction & structure srt 259 office showroom/ware house major project.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
INTERIOR WALL FINISHES
What you need today Text Notebook Calculator (optional) 1/8” = 1’ print of foundation (basement) plan –With dimensions.
Rectangular framed structures
First conceptual design 3D Side view Arch supporting the structure.
Topic C1 Superstructures - walls
BCT 102 Residential Printreading
Glass & Glazing.
Autonomous Building Design Elements
DOORS AND WINDOWS.
Windows Do not open or close all windows and doors at the same time. Optimise the ventilation by experimenting with opening different windows instead.
BUILDING CONSTRUCTION V ARCHITECTURAL FINISHING SYSTEMS
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
SENIOR ARCHITECTURAL PROJECT – JEFF CALICO PROJECT DESCRIPTION OVATION – “TO CELEBRATE LIFE” OVATION BUILDING DESCRIPTION: 28 FLOORS STEEL STRUCTURE COMPOSITE.
The Town Hall of Zevenhuizen S.H. Liem, A.H.C. van Paassen M.Verwaal, H.F. Broekhuizen Delft, April 1998 Presentation of the building Presentation of the.
HVACR416 - Design Heat Loss / Heat Gain Part 2. External Loads The greatest external load is the sun. The suns heat can get into a building in one of.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Riga Technical University Institute of Heat, Gas and Water technology OFFICE BUILDING NIGHT COOLING POTENTIAL IN BALTIC REGION RENARS MILLERS, ALEKSANDRS.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Commerzbank Headquarters Frankfurt Liakos Ben Ariston McKay.
First part:  Main facts  grounding  recycling of construction materials  heat regulation: ◦ arrangement of buildings ◦ platforms for every building.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Stability systems in high rise buildings - Neo Bankside, Southbank, London - The Gherkin (Swiss Re Bank) 30 St Mary Axe, London Maryam & Elisavet.
Topic Today’s Objective
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Chapter 23: Structural Drafting
1 SURFACE FINISHES, DOORS AND WINDOWS. SURFACE FINISHES OR PLASTERING Process of covering rough walls and uneven surfaces in the construction of houses.
Established in 1955 in Dunaújváros Produce m3 of concrete per year.
Federation Square Melbourne, Australia Greg Emms and Justin Moyes Lab Architecture (London) Bates Smart Architects (Melbourne)
Hearst Magazine Building, New York,
Windows & Doors Chapter 8. Windows Provide natural light, air circulation, and a view for the home and members living in the home Also serve as a point.
Cross Wall Construction
Learning Outcome Lesson Objective
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Mayor’s Office on Disability City and County of San Francisco Discussion of Common Design and Construction Errors.
Pecha Kucha Group 1. Design Concept Features? Features?External Cycle store to the right of the face of the buildings. Encased in timber cladding as will.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
DOOR &WINDOW DEPT. OF CIVIL ENGINEERING By Mr. M. M. MASKE.
Ariana Kevelier Paul King Building Technology III
Cast in Place 2 way Flat slabs Basically joists in both directions
Facade Panes Dealers in UAE
Arch205 Material and building construction 1 floor & Roof systems
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Arch205 building construction Windows- glazed curtain wall, skylights
Components of Construction
Arch205 building construction floor & Roof systems
1 Semester Project Design A Multi Story Office Building
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Project: 250 West Street, Columbus, Ohio
Masonry Bearing Walls.
Presentation transcript:

Natural air drawn into horizontal slots in cladding, with pressure differentials generated by aerodynamic form of building drive natural ventilation. Architects selected glass for thermal performance, safety and security reasons.

Productssliding hardware systems for - glass/metal construction - wood construction - furniture SwissRe’s new headquarters in London will have a double cladding. The inner façade is being realised with HAWA- hardware systems. Heavy glass panels, which appear as a flush front when closed, may be slid away. Thus enabling servicing staff access to the space between the two façades. Switzerland

Dupont Lmainated glass. External glass envelope acts as ecoustic buffer to outside and provides natuarl ventilation, daylight, and views. An assymetrical laminated inner panel in a sealed double glazed unit where a selective coating applied to thinner inner layer reflects reradiated heat, intercepted by blinds, away from internal ofice. Inner layer to have thermal potential.

2nd highest in part of town 40 story height First tall since 1970’s due to heirage consciousness Façade opens to provide freshh air, reduce a/c Decentrallised mechanical vents

1 basement parking level with bicylce spaces, showers, but no car spaces. 360 degree vies from conic shape roof top. Relatively small footprint led to unique shape. Climatroffice with enclosed glass skin and microclimate. Doubled curved geometry not sied for 1970s. Parametric modeling

Façade has structural grid wch frees floor plates of cross bracing. Central core is load bearing, no lat support Lightwells-light, venthilation, aptial quality Tined glass for solar radiation control., exhaust betweenpanels used fror solar raiation cushion to offs space

Site size: 1.4 acres (0.57 hectares) Area: 500,000 square feet / 46,450 square meters net Typical floor plate: 15,000 square feet / 1,400 square meters Height: m - 40 storey building Typical slab-to-slab heights: 4.15m Typical floor to ceiling height: 2.75m Typical raised floor level: 150mm >>> Frame construction: Steel. Floor construction: Concrete slab on profiled metal decking.

The tower foundation prior to concretin Week 36/146 Week 50/146