3.5.12 Student Book © 2004 Propane Education & Research CouncilPage 1 3.5.12 Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
4.2 Student Book © 2004 Propane Education & Research Council Preparing and Installing Vapor Distribution System Components 4.2.
Passive Leak Detection Operation Training October 2014.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Identifying Equipment & Procedures Used on Propane Transports
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
Transporting ASME, DOT Portable, and Intermodal (IM) Tanks
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
MODULE 5 Loading and Unloading.
3.6.6 Student Book © 2004 Propane Education & Research CouncilPage 1 In the wake of the September 11 th attack and continuing terrorist threats, shippers,
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
MODULE 6 Injecting Methanol and Evacuating Containers.
Left side compressor behind Left control box Right side compressor behind Right control box.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.4.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Bulk Plant Security Procedures In the wake of the September 11 th,
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
MODULE 6 Vehicle Parking, Servicing, and Security.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
MODULE 3 Bobtail Equipment and Systems.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
MODULE 2 Operate the Propane Liquid Supply System.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2011 PLANT OPERATIONS MODULE 8 Maintain Bulk Plant Systems and Equipment.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
CCNA1 v3 Module 9 v3 A+ Type 1 JEOPARDY K. Martin.
14 Refrigerant Recovery, Recycling, and Recharging.
Installing DOT/ICC Exchange or Stationary Cylinders
R1 Fundamentals of Refrigeration
R1 Fundamentals of Refrigeration
Presentation transcript:

Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use compressor to unload transports and recover the vapor left in the cargo tank, it is important to understand the process of reducing vapor pressure. In this module you will identify: (1)U.S. DOT regulations pertaining to unloading operations and attendance requirements (2)Reasons for reducing cargo tank pressure (3)Procedures for recovering propane vapor using the bulk plant compressor

Student Book © 2004 Propane Education & Research CouncilPage 1 DOT Regulations Pertaining to Unloading Operations U.S. Department of Transportation regulations require that qualified persons be “in attendance” throughout the process of loading a cargo tank motor vehicle. The person who is responsible for loading the cargo tank is also responsible for ensuring that it is so attended. A person is “qualified” if he/she has been made aware of the nature of the hazardous material has been instructed on the procedures to be followed in emergencies is authorized to move the cargo tank has the means to do so.

Student Book © 2004 Propane Education & Research CouncilPage 1 & 2 DOT Regulations Pertaining to Unloading Operations 3.The qualified person attending the unloading operation must remain within 25 feet of the cargo tank when the internal self-closing stop valve is open. 4.The qualified person attending the unloading operation must have an unobstructed view of the cargo tank and delivery hose to the maximum extent practicable, except during short periods when it is necessary to activate controls or monitor the receiving container. 5.When unloading the transport cargo tank using the plant compressor, the vehicle engine must not be running during the unloading operation.

Student Book © 2004 Propane Education & Research CouncilPage 2 DOT Regulations Pertaining to Unloading Operations 6.The cargo tank must be equipped with a passive emergency discharge control system no later than the cargo tank’s first pressure test scheduled after July 1, After that date it must have a means to automatically shut off the flow of product without the need for human intervention within 20 seconds of an unintentional release caused by a complete separation of a liquid delivery hose (passive shut-down capability).

Student Book © 2004 Propane Education & Research CouncilPage 2 Reasons for Reducing Cargo Tank Pressure Tank Car or Cargo Tank Pressure, psig 33,000 Gal. Cap Tank Car—Gal. of LP-gas 10,600 Gal. Cap Cargo Tank— Gal. of LP-gas Figure 1. Vapor Left in a Railroad Tank Car or Transport Cargo Tank Expressed in Gallons of Liquid LP-Gas

Student Book © 2004 Propane Education & Research CouncilPage 3 Reasons for Reducing Cargo Tank Pressure Figure 2. Propane Evacuation Time for a 33,000 Water Gallon Tank Car

Student Book © 2004 Propane Education & Research CouncilPage 3 Reasons for Reducing Cargo Tank Pressure It is not economical, however, to operate the compressor for the time required to recover the maximum possible amount of propane. To do so requires expense of unloading attendant time, electricity, and wear and tear on the compressor. More than half of economically recoverable vapor is removed in the first hour of compressor operation. For that reason, many common carriers and propane marketers who operate company-owned transports, limit the vapor recovery time.

Student Book © 2004 Propane Education & Research CouncilPage 3 Vapor Recovery Procedures Plant vapor compressors are used in unloading operations for the following reasons: 1.It saves time and eliminates the hazards associated with using the transport unloading pump. 2.It allows for recovery of some of the propane that remains in cargo tanks after the liquid has been unloaded. 3.It prepares the cargo tank for inspections, maintenance, or repairs.

Student Book © 2004 Propane Education & Research CouncilPage 4 Vapor Recovery Procedures Step 1:Position the transport at the unloading bulkhead connected to a compressor. Step 2:Examine the plant piping and flow control valves to determine how vapor will move from the cargo tank to the suction side of the compressor and into the liquid section of the bulk storage tanks.

Student Book © 2004 Propane Education & Research CouncilPage 4 Vapor Recovery Procedures Figure 3. Typical Plant Compressor

Student Book © 2004 Propane Education & Research CouncilPage 4 Vapor Recovery Procedures Figure 4. 4-Way Valve Vapor Flow—Position One

Student Book © 2004 Propane Education & Research CouncilPage 5 Vapor Recovery Procedures Figure 5. Compressor and Bulk Plant Connections and Valves

Student Book © 2004 Propane Education & Research CouncilPage 5 Vapor Recovery Procedures Figures 6 & 7. 4-Way Valve & Piping Valve Positions Operation of Valves for Cargo Tank Unloading 4-Way Valve Position Two Valve A Closed Valve B Open Valve C Open

Student Book © 2004 Propane Education & Research CouncilPage Vapor Recovery Procedures Step 3:Check the Liquid Level Gauges on the Storage Tank(s). Step 4:Connect the Bulkhead Vapor Hose to the Cargo Tank (if not already connected for liquid unloading). Step 5:Inspect the compressor and check the crankcase oil level in the sight glass or by using the dipstick. Step 6:Open the vent on the compressor’s liquid trap, if so equipped, or if not, verify that liquid is not present in the vapor hose and suction line.

Student Book © 2004 Propane Education & Research CouncilPage 7 Vapor Recovery Procedures Step 7:Verify that the 4-way valve is in the proper position for unloading the cargo tank. Check all in-line valves and bulk tank valves for proper open or closed position. Step 8:Ensure that all shutoff valves are open in the vapor hose and cargo tank connection. Step 9:Start the compressor in accordance with manufacturer's instructions.

Student Book © 2004 Propane Education & Research CouncilPage 7 Vapor Recovery Procedures Step 10:Closely monitor the cargo tank, compressor and receiving tank(s), ready to stop the compressor if any abnormal operating condition is noticed. Stop the compressor when the cargo tank pressure is reduced to the desired reading or the time allowed for vapor recovery has elapsed Step 11:Close all valves in the transfer hose and on the cargo tank. Step 12:Close all valves in both the suction and discharge vapor piping circuits. Close the ESV(s) at the transfer bulkhead, and the appropriate liquid and vapor valves in the bulk storage tank(s), if applicable.

Student Book © 2004 Propane Education & Research CouncilPage 7 & 8 Vapor Recovery Procedures Step 13:Disconnect the Transfer Hose and Prepare the Transport for Travel. If for any reason the transfer operation is interrupted, or the attendant must leave the area, the compressor must be shutdown and transfer hoses disconnected as outlined in step 13. DO NOT leave transfer hoses connected to a cargo tank while unattended by a qualified person.

Student Book © 2004 Propane Education & Research CouncilPages Time to See If You Got the Key Points of This Module… Complete the Review on page 9 & 10. See if you are ready for the Certification Exam by checking off the performance criteria on page 11 & 12.