Course of MT- 362 Material Handling Lecture # 3.

Slides:



Advertisements
Similar presentations
The Ten Principles of Material Handling
Advertisements

Chapter 10 Material Handling.
Lean Manufacturing.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Logistics & Channel Management
Protective Packaging and Materials Handling
5/3/2015 IENG 471 Facilities Planning 1 IENG Lecture 14 Material Handling.
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
REVERSE LOGISTICS PROBLEM
Logistic Management Warehousing
ISO 9001 : 2000.
Supply Chain Management
INDUSTRIAL & SYSTEMS ENGINEERING
Warehousing Decisions
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
Chapter 14 Supply Chain Management
Copyright Cengage Learning 2013 All Rights Reserved 1 Chapter 14: Supply Chain Management Introduction to Designed & Prepared by Laura Rush B-books, Ltd.
GREENING SUPPLY CHAIN IN RETAIL SECTOR
David O’Sullivan Industrial Automation (IE423 Computer Integrated Manufacturing) (IE215 Design and Make) David O’Sullivan
Learning Objectives Determine the need for warehouses and inventory management Identify the various types of warehouses Identify and describe the different.
Dr. Muzaffer Kapanoğlu - Decision Support Systems © 2003 MATERIAL HANDLING (Textbook Chapter 5)
MATERIAL HANDLING: PRINCIPLES & EQUIPMENT DESCRIPTION
Manufacturing Engineering Department Lecture 1 - Introduction
Product Development. Major Topics The product portfolio of a company concretizes its mission A description of the product selection and development process.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Computerised Maintenance Management Systems
Defn Jack Ninemeir defines purchasing as "the series of activities designed to obtain products of the right quality and quantity at the right price and.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
LOGISTICS OPERATION Industrial Logistics (BPT 3123)
Packaging and Materials Handling
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Material Handling System Design
Transportation Infrastructure
From Research Prototype to Production
MODULE -7 IT IN THE SUPPLY CHAIN
Chapter 6 Sourcing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the difference between.
Supply Chain Management
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
Chapter 16 Global Logistics and Materials Management.
Logistics McGraw-Hill/Irwin
“Without the Cost of Waste …”
Course of MT- 362 Material Handling Lecture # 1. Course Outline.
Chapter 13 Logistics and Channel Management. Logistics13 Objective 1: L ogistics Planning, implementing, and controlling the physical flows of materials.
MH...CH LECT011 What is Material Handling? Materials handling is the science and art both involving the moving, packing and storing of substance.
SCM is a set of approaches utilized to efficiently integrate suppliers, manufacturers, warehouses, and stores, so that merchandise is produced and distributed.
Department of Marketing & Decision Sciences Part 5 – Distribution Wholesaling and Physical Distribution.
Product Development. Product Selection and Development Stages Figure 5.4, pg. 138.
11-IE IE IE-60  Facilities design for manufacturing systems is extremely important because of the economic dependence of the firm.  Facility.
L – 5 Distribution Channel - Warehousing and Inventory Management.
Computerised Maintenance Management Systems
DISTRIBUTION Distribution can be defined as an operation, or a series of operations, which physically bring goods manufactured or produced by any particular.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
1 Product Development Process Requirements Definition (Chap. 3) Conceptual Design (Chap. 3 and 4) Detailed Design (Chap. 5) Manufacturing (Chap. 7) Logistics,
Logistics. 英语班级: 08 级 1B6 专业:物流管理 组员: 温凯靖 王蒙露 叶雯雯 马昀 王晓 林.
Chapter 13 Logistics and Channel Management.
INTRO TO SAP EWM.
ME Spring 2015 Systems Engineering, Part II
Common Learning Blocks
Common Learning Blocks
The University of Jordan Mechatronics Engineering Department
Food Production Systems
Warehousing Decisions
Facility Planning Systematics Process
Design for Manufacture and Assembly (DFMA) BDD 4013
Facilities Planning and Design Course code:
Supply Chain Process ISCOM/ 374.
Chapter 13 Logistics and Channel Management.
Presentation transcript:

Course of MT- 362 Material Handling Lecture # 3

Principles of Material Handling • Planning principle • Standardization principle • Work principle • Ergonomic principle • Unit load principle • Space utilization • System principle • Automation principle • Environmental principle • Life cycle cost principle

Principles of Material Handling • Planning principle - All material handling should be the result of a deliberate plan where the needs, performance objectives and functional specification of the proposed methods are completely defined at the outset.

Planning principle

Principles of Material Handling • Standardization principle - Material handling methods, equipment, controls and software should be standardized within the limits of achieving overall performance objectives and without sacrificing needed flexibility , modularity and throughput (i.e., the quantity of raw materials processed within a given time)

Standardization principle

Principles of Material Handling • Work principle - Material handling work should be minimized without sacrificing productivity or the level of service required of the operation - The work principle for MH should be such that it should simplify the handling processes (e.g., by reducing, combining, shortening or eliminating unnecessary moves) • E.g., the shortest distance between two points is a straight line (not a curved path!)

Work principle

Principles of Material Handling • Ergonomic principle - Ergonomics is the science that seeks to adapt work or working conditions to suit the abilities of the worker - Human capabilities and limitations must be recognized and respected in the design of material handling tasks and equipment to ensure safe and effective operations

Ergonomic principle

Principles of Material Handling • Unit load principle - A unit load is one that can be stored or moved as a single entity at one time, such as a pallet, container or tote (bag), regardless of the number of individual items that make up the load - Unit loads shall be appropriately sized and configured in a way which achieves the material flow and inventory objectives at each stage in the supply chain

Unit load principle

Principles of Material Handling • Space utilization principle - Space in material handling is three dimensional and therefore is counted as cubic space - Effective and efficient use must be made of all available space • In work areas, messy and unorganized spaces and blocked passageways should be eliminated • In storage areas, the objective of maximizing storage density must be balanced against accessibility and selectivity • When transporting loads within a facility the use of overhead space should be considered as an option

Space utilization principle

Principles of Material Handling • System principle - A system is a collection of interacting and/or interdependent entities that form a unified whole - The MH should be such that material movement and storage activities are fully integrated to form a coordinated and operational system • This system should consist of receiving, inspection, storage, production, assembly, packaging, unitizing, order selection, shipping, transportation and the handling of returns activities

Principles of Material Handling • System principle - Systems integration should include the entire supply chain including reverse (return i.e., two way) logistics - It should include suppliers, manufacturers, distributors and customers - Inventory levels should be minimized at all stages of production and distribution • however process requirements and customer service should be considered

Principles of Material Handling • System principle - Information flow and physical material flow should be integrated and treated as concurrent (simultaneous) activities - Methods should be provided for easily identifying materials and products, for determining their location and status within facilities and within the supply chain and for controlling their movement - Customer requirements and expectations regarding quantity, quality, and on-time delivery should be met without any distinction

System principle

Principles of Material Handling • Automation principle - Automation is a technology concerned with the application of electro-mechanical devices, electronics and computer-based systems to operate and control production and service activities. It suggests the linking of multiple mechanical operations to create a system that can be controlled by programmed instructions

Principles of Material Handling • Automation principle - Material handling operations should be mechanized and/or automated where feasible to improve operational efficiency, increase responsiveness, improve consistency and predictability, decrease operating costs and to eliminate repetitive or potentially unsafe manual labor - Pre-existing processes and methods should be simplified and/or re-engineered before any efforts at installing mechanized or automated systems

Principles of Material Handling • Automation principle - Computerized material handling systems should be considered where appropriate for effective integration of material flow and information management - All items expected to be handled automatically must have features that accommodate mechanized and automated handling - Treat all interface issues as critical to successful automation, including equipment to equipment, equipment to load, equipment to operator, and control communications

Automation principle

Principles of Material Handling • Environmental principle - Environmental consciousness stems from a desire not to waste natural resources and to predict and eliminate the possible negative effects of our daily actions on the environment - Environmental impact and energy consumption should be considered as criteria when designing or selecting alternative equipment and material handling systems

Principles of Material Handling • Environmental principle - Containers, pallets and other products used to form and protect unit loads should be designed for reusability when possible and/or biodegradability as appropriate - Systems design should accommodate the handling of spent dunnage (wooden boxes), empty containers and other by-products of material handling - Materials specified as hazardous have special needs with regard to spill protection, combustibility and other risks

Environmental principle

Principles of Material Handling • Life cycle cost principle - Life cycle costs include all cash flows that will occur between the time the first dollar is spent to plan or procure a new piece of equipment, or to put in place a new method, until that method and/or equipment is totally replaced - A thorough economic analysis should account for the entire life cycle of all material handling equipment and resulting systems

Principles of Material Handling • Life cycle cost principle - Life cycle costs include capital investment, installation, setup and equipment programming, training, system testing and acceptance, operating (labor, utilities, etc.), maintenance and repair, reuse value, and ultimate disposal - A plan for preventive and predictive maintenance should be prepared for the equipment, and the estimated cost of maintenance and spare parts should be included in the economic analysis

Principles of Material Handling • Life cycle cost principle - A long-range plan for replacement of the equipment when it becomes obsolete should be prepared - Although measurable cost is a primary factor, it is certainly not the only factor in selecting among alternatives. Other factors of a strategic nature to the organization and which form the basis for competition in the market place should be considered and quantified whenever possible

Life cycle cost principle