Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair.

Slides:



Advertisements
Similar presentations
INTERTANKO Latin American Panel Lima, Peru 13 – 14 September IMO GOAL-BASED SHIP CONSTRUCTION STANDARDS Gary Horn Director, Structures & Hydrodynamics.
Advertisements

Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 70 th GRPE th January 2015 Geneva Chair: Petter.
GBS PILOT PROJECT ROUND TABLE REVIEW TRIPARTITE TOKYO 20th SEPTEMBER 2007.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
IMO Goal Based Standards for New Ship Construction Roberto P. Cazzulo RINA Member of IACS Council Former IACS EG GBS Chairman.
Results of January 2007 Meeting of Working Group on the Questionnaire and Indicators 24 January 2007.
Tripartite Meeting Beijing, 1 November 2005 IMO GBS Classification Society’s View about the Scope, Verification Process and Acceptance Criteria Roberto.
1 Houston Tanker Event 2007 Houston, TX 26 March 2007 Common Structural Rules for Tankers Gary Horn, P.E. Director, Technology ABS Houston.
The 22 nd meeting of the INTOSAI Working Group on IT Audit (WGITA) KPI Project Final Report — Key Performance Indicators Methodology for Auditing IT Programs.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
United Nations Counter-Terrorism Committee Executive Directorate (CTED) Revised documents and procedures for assessing Member States’ implementation efforts.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The Korea Shipbuilders’ Association Shipbuilders’ Experience & Feedback on IACS C ommon S tructural R ules.
Balance between Intellectual Property Rights and Design Transparency Tripartite meeting Beijing, 8 th - 9 th Nov *** A GBS-related issue *** O Kitamura.
Adopted by IACS Council on 14 December 2005 Summary of CSR – Tanker Rules – Bulk Carrier Rules Harmonization Maintenance Common Structural Rules for Tankers.
Tripartite Meeting Seoul, Korea, September 2009 Safety & SOLAS Agenda item 4.1 Goal-Based Standards --- application and compliance --- Toshiro Arima.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
1 IACS Common Structural Rules INTERTANKO LATIN AMERICAN PANEL Rio de Janeiro, 25 April 2006.
Page 1 Mission-Based Management July 2010 Electronic CV System Users Group.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Tripartite meeting Japan, Tokyo, 20 – 21 September 2007 Agenda item 3.2 Status and Early Experience of CSR Kirsi Tikka Vice President, ABS Global Technology.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Tripartite Meeting September 2006 Seoul, Korea Item B12. CSR Maintenance Procedures - feedback and commentary mechanisms on Q&As, CIs and Rule Change Proposals.
E-PRTR Refit evaluation and Article 17 official data review 1 2 nd Global Round Table on PRTRs 25 November 2015 Andreas Grangler.
Anti-Trust/Competition Law Compliance Statement INTERTANKO’s policy is to be firmly committed to maintaining a fair and competitive environment in the.
1 Approved Terms of Reference for HAPUA Working Group No.5-ESI Services Project 6 Bilateral Contract Benchmarking.
Briefing to the Portfolio Committee on Police 21 August
EMSA Study on DH Tanker Safety Tripartite Discussions Beijing 2005, 31 st Oct – 1 st Nov Agenda Item Europe EMSA Study on DH Tanker Safety.
1 27 Feb 2007 TAIEX THE HELP DESK EN 13445: A tool to promote the use of the standard 27 February 2007 Danielle Koplewicz TAIEX - Bucharest.
Part-financed by the European Union From application to implementation – the procedures Joint Technical Secretariat Lead Applicant Seminar for 1st application.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Tripartite meeting Beijing, China, 8-9 November 2008 Agenda item 4.1 Early Warning System Konstantin Petrov Manager, External Relations, Lloyd’s Register.
Agreement concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such.
4th ASF/SNEC – ACS Seminar, Seoul, 22 March 2013
Chanchal C Sarkar DY. Director, Trade Policy Division Department of Commerce, Ministry of Commerce & Industry TBT Agreement : Key Principles.
European Developments Transmission Workgroup 3 rd May 2012.
GBS for Oil Tankers and Bulk Carriers
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
August ICA Agenda Time Topic 8:00 – 8:15
M&E Task Force Meeting
UNSD report 5th UNCEEA Meeting New York, June 2010
MODULE A - ADMINISTRATIVE
Yearly Maintenance Process (for existing messages)
Improving assessment of GES Draft conclusions and Way forward
Evan Kane Division of Water Resources
Review of Decision 2010/477/EU and MSFD Annex III
Review of Decision 2010/477/EU and MSFD Annex III
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
EMEP/CORINAIR Atmospheric Emission Inventory Guidebook
Item 6: Improving assessment of GES Draft conclusions and Way forward
TBT Agreement : Key Principles
Exit Capacity Substitution and Revision
Development of guidance Meeting of the IED Article 13 Forum subgroup
Value-Based Payments.
Statewide Accountability
Status report of the cycle and gearshift issues task force (GSTF)
Ctclink executive leadership committee May 31, 2018
Review of the 1958 Agreement
Information on work related to
Second Independent Evaluation of UNAIDS
Potential Minor Release Drop 4 Timeline & Scope
Scene setter European Commission DG Environment
Inputs Regard to “Test Phase” to TFCS
Review of Decision 2010/477/EU and MSFD Annex III
XRN Nov 19 Release - Status Update
Value-Based Payments.
Presentation transcript:

Tripartite meeting Beijing, 8-9 November 2008 Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair

Update on CSR History of the Common Structural Rules – Adoption January 2006 – Implementation April 2006 – One year feedback period before developing harmonization plan – Currently ongoing: CSR Maintenance CSR Harmonization

IACS Organisation for CSR

Tripartite meeting Beijing, 8-9 November 2008 Update on CSR Maintenance

Adopted CSR Rule Changes and Corrigenda Tanker: – Rule Change Notice 1 (Sept 2006) – Corrigenda 1 (Apr 06) – Corrigenda 2 (July 06) – Corrigenda 3 (Nov 2007) – Rule Change Notice 2 (Feb 2008) – Corrigenda 4 (June 2008) Bulk Carrier: – Corrigenda 1 (May 06) – Corrigenda 2 (Jan 07) – Corrigenda 3 (July 07) – Corrigenda 4 (Sept 07) – Rule Change Notice 1 (Nov 2007) – Rule Change Notice 2 (Feb 2008) – Corrigenda 5 (May 2008) – Rule Change Notice 3 (12 Sept 2008) Tanker consolidated version 1 July 2008 Bulk Carrier consolidated version 1 July 2008

Current CSR Rule Change Proposals Tanker: – RCP 3 Accepted by HP 1 st round of TC and Industry Group review (July – Aug 2008) Comments incorporated or addressed by CSR PT2 2 nd round of TC and Industry Group review starting now (Oct – Nov 2008) Publish January 2009 Effective date 1 July 2009

Current CSR Rule Change Proposals Bulk Carrier: – RCP 4 Accepted by HP 1 st round of TC and Industry Group review (July – Aug 2008) Comments incorporated or addressed by CSR PT1 2 nd round of TC and Industry Group review starting now (Oct – Nov 2008) Publish January 2009 Effective date 1 July 2009

Revision History – Tracking Database IACS CSR Tracking Database is ready to go on-line Objective - Provide users with a searchable database on CSR revision history with supporting materials. - Provide users easy and quick access to a full and up-to-date history of a particular requirement Test and development: It has been tested since Jan 2008, and is now ready to go on-line to general public as a development version. Web link:

Revision History – Tracking Database What is published: - Full History of Revision (Rule Changes and Corrigenda) on a paragraph by paragraph basis; - Date of approval, what was amended/corrected, Technical Background, implementation date Search Facility Search and sort out rule change text by Rule Change Notice/Corrigenda No., approval date, or effective date etc. Industry and interested users are invited to contact the IACS CSR Secretariat for log- in IDs and a User Manual.

IACS CSR Knowledge Centre (KC) activity (as of 31 July 2008) KC since 1 August 2006 to capture Questions & Answers, Common Interpretations, and Rule Change requests 657 entries in the database relating to the Tanker Rules, 435 to the Bulker Rules and 8 to both sets of Rules 550 of the items have been completed (195 tanker, 349 bulker and 6 both) 222 items led to a rule change being requested (around 50% editorial changes)

Types of changes Category I Corrigenda; corrections of Category I do not affect the technical background nor intention of the requirement, they are not controversial, i.e. they correct an obvious error. Category II Rule changes; which possibly affect scantling requirements or the technical background. IACS PR32 – CSR Maintenance

IACS PR32 - CSR Maintenance Rule Change Proposals are reviewed by Members’ Technical Committees: Based on the input from the first review, Rule Change Proposals may be amended and are sent back to the Technical Committees for second review.

IACS Council decisions regarding PR 32 implementation : Hull Panel should be conservative about issuing Corrigenda. “Corrections” to the Rules which require additions to the Rule text must be dealt as Rule Changes. PR 32 Annex A, Attachment 2, Para 6: Permsec should publish the approved simple Answers to Questions, Clarifications and CIs, upon confirmation by the PT Manager, on the IACS CSR Website. PR 32 Annex A, Attachment 2, Para 7: A summary report on Q&As and CIs is produced twice a year and sent to Project Teams dealing with Rule maintenance. The Project Teams carry out periodical review, at least twice a year, of the Q&A and CIs to determine the need for Rule changes. IACS PR32 - CSR Maintenance

Cross Check Project Status Prescriptive Rules Cross Check and FEA Cross Check All 10 IACS members involved First phase of the Cross Check for Tanker and Bulk Carrier calculations has been completed The results provide a benchmark for the societies to verify their calculation tools The results indicate reasonable coherence Common interpretations and/or Rule changes will be needed to clarify the application of the Rules Additional work will be carried out to cover more ships

Tripartite meeting Beijing, 8-9 November 2008 Update on CSR Harmonization

Harmonized Structural Rules for Oil Tankers and Bulk Carriers Deliverables – Common Rules covering Oil tankers and bulk carriers – 3 booklets: Common parts for both types Specific part applicable to Oil Tankers Specific part applicable to Bulk Carriers Issue of complete harmonized rule for stakeholder comment Dec 2011

General Action Plan for CSR Harmonisation Items identified at CSR release for long term harmonisation: – Wave loads – Fatigue – Finite element analysis – Buckling – Prescriptive requirements Comments from ICS: – Quartering Sea – Corrosion – Welding – FEM analysis

Project Teams Established in 2008 HPT 1 Wave Loads Harmonization of the Loads Includes re-examination of the environmental data and quartering sea condition for bulk carriers HPT 2 Buckling Harmonization of Buckling calculation methods for prescriptive and FEM HPT 3 FEAHarmonization of FEM calculation methods HPT 4 Corrosion Re-examination of data HPT 5 Welding Review of welding requirement especially in way of high stress areas HPT 6 Fatigue assessment of hatch corners of Bulk Carriers under Quartering Sea for updating CSR BC HPT 7Ship in Service Criteria

Project Status HPT 1 Wave Loads Detail action plan and work schedule defined Comparison of 2 CSR Rules in progress for the motions, accelerations and the outside pressure Sub-PT for Re-Examination of the environmental data For quartering sea : connection btwn HPT1 & HPT6 HPT 2 Buckling Detail action plan and work schedule defined Work in progress (slenderness and prescriptive formulae) HPT 3 FEA Detail action plan and work schedule defined Rule comparison in progress

Project Status HPT 4 Corrosion 1 Detail action plan defined HPT 5 Welding Detail action plan and work schedule defined 1 IACS will welcome corrosion data from ICS and other industry associations for analysis with the current IACS data.

Project Status HPT 6 Fatigue of Hatch Corner under quartering sea in CSR BC 3 different models of BC-A investigated with respect to the structural response under pure torsion. Comparison made between the structural response of the global (Complete ship) models and 3-Cargo-Hold-models. Boundary conditions for the 3-Cargo-Hold-model are investigated HPT 7 Ship in Service Work in progress under supervision of Survey Panel

Thank you Status and Early Experience of CSRs Gary Horn Director Rules & Standards, ABS IACS Hull Panel Chair