OSU 9/7/03 1 Radioactive Source Tests at OSU Our source tests are made using three Cs137 sources 10  C sources (~15 years old, t1/2 Cs137=30.2yrs) Cs137.

Slides:



Advertisements
Similar presentations
18 Bit ADC Status Collaboration meeting May 18, 2007.
Advertisements

11/24/2004EE 42 fall 2004 lecture 361 Lecture #36: Transmission lines Last lecture: –Transmission lines –Balanced and unbalanced –Propagation This lecture:
5.5 The potential divider. 6V 3V 5.5 The potential divider.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
Salk Institute Mobile Lab DNA Extraction from wheat germ Protocol Salk Institute Mobile Lab.
Experiment 11: An Inverting Amplifier
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
ECE 201 Circuit Theory 11 Energy Calculations for Mutually – Coupled Coils.
68000 Interface Timing Diagrams Outline –68000 Read Cycle –68000 Write Cycle Goal –Understand bus cycles –Learn how to attach memory, peripherals.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
A High Voltage System with 60 High Voltage Power Supply Channels in 2U Height EURO Crate Masatosi IMORI, Nagataka Matsui, Masaya ISHINO, Toshiyuki Kimura.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
ALL magnets have two poles NORTH seeking pole SOUTH seeking pole.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
Mercury Spill Response Instrumentation. Mercury Vapor Analyzers Jerome 431-X MVA (gold film) Lumex 915+ MVA (Atomic Absorption) Jerome J405 MVA.
Straw spatial resolution (beam test 2007 and 2008) A.Zinchenko, S.Shkarovskiy.
Electric Current Remember: Copper atoms are much bigger than electrons and are packed together in the wire October 2015.
2.6 Special Functions Step functions Greatest integer functions Piecewise functions.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Radiation, Conduction or Convection Radiation The transfer of energy as electromagnetic waves.
Run13 MUID Hit Efficiency RIKEN/RBRC Itaru Nakagawa 1.
11/22/2004EE 42 fall 2004 lecture 351 Lecture #35: data transfer Last lecture: –Communications synchronous / asynchronous –Buses This lecture –Transmission.
The Electricity and Magnetism Connection
Reser- Voir Turbo Pump 1 Five- Fold Turbo Pump 2 Scroll Pump1 Scroll Pump2 Tgt. Cham- ber N2N2 H2H2 P2 P1 P3 P4 P5 P6 Panel Tgt. Cell V2V1 V3 V0 E0 E1.
The Physics of Electricity and Magnetism Activity: Being a Part of a Current Event 9-12 Science Std: Phys 5h, 5j.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22 Aug Ageing studies: the Miracle HV training.
1 Nov 2007IEEE NSS (N48-3) - Ageing in the LHCb Outer Tracker - N. Tuning1/16 Ageing Phenomena in the LHCb Outer Tracker 1 November 2007 IEEE2007 Niels.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
UM PPS Lab Activities Mid-size Panel Tests PPS meeting January 15, 2012 Claudio, Curtis, Dan, Ethan, Riley.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
COTS Regulator Studies Derek Donley*, Mitch Newcomer, Mike Reilly *Hospital of the University of Pennsylvania, Radiation Oncology.
TPC ALARM HANDLER In addition to the big slow controls alarm handler I usually ran a TPC only alarm handler as a separate process. The TPC alarm handler.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Current Electricity It’s all about energy To start off, see if you can arrange these phrases into word equations – You may want to use ‘change of’ in certain.
JMU Dark Current Tests By: Kevin Nash.
CS 3305 System Calls Lecture 7.
Potential Divider Aims What is a potential divider
copying & sequencing DNA
Teacher’s Notes This sequence of slides is designed to introduce, and explain, the idea of Graphs in practical work, as explained on pages in.
How Science works: Graphs.
Shifter Instructions regarding the ZD, Dan Peterson
About different types of graphs,
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
Teacher’s Notes This sequence of slides is designed to introduce, and explain, the idea of Graphs in practical work, as explained on pages in.
ConcepTest 30.3a Moving Wire Loop I
This shows the shoot through on the motor driver
Chapter 1 Introduction of Arduino
DIRC Background Status
Single rate plateau curve with different gas mixture
23 Barrel chambers and 12 Endcap chambers
DNA Extraction from wheat germ
ElectroMagnetic Induction
Presentation transcript:

OSU 9/7/03 1 Radioactive Source Tests at OSU Our source tests are made using three Cs137 sources 10  C sources (~15 years old, t1/2 Cs137=30.2yrs) Cs137 gives off: e’s (0.51MeV/94%, 1.2MeV/6%)  ’s (0.662 MeV/85%) We did two types of sources tests “scan” test (V=5700V) moved the 3 sources sources (by hand) ~1 cm/sec “long term” test (V=5500V) let a source sit in same location on tube for > 8hrs Set HV and monitor the current using CAEN system Tests were performed on large cell tubes 10,12,13 All source tests were done using ZEUS gas mix

OSU 9/7/03 2 Sources test setup Cs source A Cs source The bar holding the 3 sources was moved by hand along the wire ~1 cm/s

OSU 9/7/03 3 Cs137 Scan Tests Each wire was scanned with a source. Initial Study found: 16 wires “ok” 8 wires suspect types of Problems: 1) I increases in a few regions of wire tube 10, wires 2, 6 2) I > 1  A over the length of the wire tube 10, wires 3, 4, tube 12 wire 4 3) I jumps up to > 1  A over a region of the wire tube 12 wires 5, 7, tube 13 wire 2 happens near the HV end of the tube OK=low current, I<~1  A uniform along wire All 8 wires looked OK after a second scan ! Cycled HV, waited a few minutes and scanned V=5700V EXAMPLES on FOLLOWING PAGES NOTE: on scan plots “400” is the voltage input end of tube

OSU 9/7/03 4 Scan tests Tube 10 wire 6 “Problem #1” First scanSecond scan “400” is the voltage input end “hot” regions

OSU 9/7/03 5 Scan Tests Tube 10 wire 4 “Problem #2” First scan I>1  A Second scan I<200nA “400” is the voltage input end 1A1A

OSU 9/7/03 6 Scan test First scan: I jumps >1  A Second scan: I<1  A Tube 12 Wire 5 “Problem # 3” “400” is the voltage input end

OSU 9/7/03 7 9/8 Scan Test

OSU 9/7/03 8 9/8 Scan Test

OSU 9/7/03 9 9/8 Scan Test

OSU 9/7/03 10 Lateral Scan (3 tubes)

OSU 9/7/03 11 “Long Term” Source Test We let a source sit in one spot on tube for > 8hrs and monitored the current Lowered voltage to 5500V so current in a cell would typically be nA We have sampled 12 spots so far 4 spots on each tube, ~L/5, 2L/5, 3L/5, 4L/5 Current is very stable in each region HOWEVER…..

OSU 9/7/03 12 Source Induced Current ! If I put a source on the purple dot the current rises from 3  A in seconds !! The effect is reproducible with HV > 5700V Could this be a problem with the wire termination or resistor pc board??