Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves.

Slides:



Advertisements
Similar presentations
1 ACE Diversity Interchange. 2 ADI Pilot Project Founded on Negotiation Theory: A transaction should occur if the parties involved are either held harmless.
Advertisements

1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
FERC Order minute Scheduling.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
1 Utility Wind Integration Group Workshop ACE Diversity Interchange (ADI) Project Sharing Area Control Errors July 2007 Sponsoring Utilities: British Columbia.
GPA Renewable Energy Resource for Guam Power Authority
Presentation to Montana Public Service Commission October 27, 2004.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
NORTHWEST POWER POOL Reliability Update
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Presentation to WECC Market Interface Committee March 24, 2015
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Slide 1 Large Wind Integration Challenges for Operations / System Reliability By : Steve Enyeart, BPA With contributions from: Bart McManus, BPA Roy Ellis,
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
ANCILLARY SERVICES THE NEXT STEP IN MARKET GRANULARISATION.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
The Transmission Imperative November 3, 2011 Jay Caspary.
NORTHWEST POWER POOL Reliability Update – Summer 2010 April 2010 Jerry D. Rust.
Turkish Power System Overview March 2012
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
1 The Northwest Wind Integration Action Plan Status Update December 14, 2010.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
Avista Wind Integration Thoughts Clint Kalich, Avista Utilities (509) Wind Integration Forum Technical Workgroup.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Managing Reliability and the Markets with PI
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Hawaii Energy Storage Seminar: Utility Regulation Service
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Generation: Control & Economic Dispatch 2016 System Operator Seminar.
NW Loss of Load Probability James Gall Power Supply Analyst
PacifiCorp and CAISO Expanding Regional Energy Partnerships
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Fuel Cost Components in the Fuel Adder
Wind Management at MISO
Fuel Cost Components in the Fuel Adder
Asia-Pacific Energy Regulatory Forum
Fuel Cost Components in the Fuel Adder
Affordable Energy Production from Renewable Fuel
Grid Integration of Intermittent Resources
Pseudo-tie business procedure
MIT tour of the California ISO Control Center March 31, 2015
Rates & Regulatory Updates
Alternative ICAP Proposal
Update on Energy Imbalance Market
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
Pseudo-tie business procedure
Presentation transcript:

Montana Energy Summit April 22, 2008 Ancillary Service – Regulating Reserves

2 TRANSMISSION OVERVIEW Control Area Concepts  Control Area or Balancing Authority Must balance loads and resources (supply and demand) on a moment by moment basis. »Requirement – 60 cycles/second (Hz) »System slows down when load>gen »System speeds up when gen>load »Frequency is the same in all of WECC »Equipment is extremely sensitive to frequency ♦ We start tripping load at 59.5 Hz  Not always geographical »Colstrip project is in 5 C/As ♦ Puget, Portland, PacifiCorp, Avista, NorthWestern »Defined by telecom signals “telemetry”

3 Regulation Criteria  Control Area Must Balance Load with Generation »The difference between the planned and actual balance is called the Area Control Error (ACE) ♦ ACE = ( Ni A - Ni S ) - 10β ( f A - f S ) ♦ ACE = Actual Interchange – Scheduled Interchange adjusted by frequency difference ♦ Automatic Generation Control (AGC) adjust regulation resources to draw ACE toward zero »A control area MUST have sufficient Regulating Reserves to meet NERC/WECC mandatory performance criteria.  Two control performance standards. »CPS1 - rolling 12 month average that is a statistical measure of ACE variability and its relationship to frequency Error. »CPS2 - a statistical measure designed to limit unacceptably large net unscheduled power flows.

4 CPS2  The following chart shows the ACE, L 10 band, and average ten-minute ACE for a 30 minute period. The second ten-minute average is in violation since it exceeds L 10.

5 Where have we been?  Regulating Reserves – NWE is a unique balancing authority with no resources capable of providing regulating reserves  NWE contracts with 3 rd party providers – and has since the mid-80s  Historical need for 60 MW of regulating capacity

6 Where have we been? Wind Integration  Traditional Needs »Historical Transmission Customer Resource (before wind integration) »Idaho Power contract – 60 MW  Wind Integration  Requires much higher quantity of regulating reserves to integrate wind »Purchased 25 MW of regulation for 135 MW of wind »Compared to 60 MW of regulation for 1700 MW of load  Regulating reserves to support the new wind generation »25 MW ~18% of default supply wind resource  Costs are significantly increasing for this product.…

7 Historic Need for Regulating Reserves  The measure of need is quite simple on NorthWestern’s system  Required by FERC/NERC to balance loads and Measures this balance over 10 minute periods of each month – CPS2  Prior to the startup and integration of Judith Gap, NorthWestern consistently met the standard »Failed to meet standard in 4 months in 2006 »Failure to meet standards could cause significant reliability issues and may lead to civil penalties

8 NWE Historic CPS2 Performance

9 What more are we doing?  NWE is participating in ACE Diversity Interchange (ADI) with Idaho Power Company, PacifiCorp, and British Columbia Transmission Corporation

10 Current Scope of ADI  Current Scope of ADI:  Initial Participating Control Areas are: »Idaho Power Company »NorthWestern Energy »PacifiCorp – Eastern Control Area »PacifiCorp – Western Control Area  British Columbia Transmission Corporation is the “host” of this activity.  Any control area operator located in the WECC and adjacent to and interconnected with one or more Participating Control Areas may join as a new ADI participant.  Arizona Public Service, Sierra Pacific Resources, and Public Service New Mexico have signed the Agreement and integration to begin June 2008.

11 What is ACE Diversity Interchange or ADI?  ADI is the pooling of individual Area Control Errors (ACE) to take advantage of control error diversity (momentary imbalances of generation and load).  By pooling ACE the participants will be able to: »Reduce control burden on individual control areas »Reduce unnecessary generator control movement »Reduce sensitivity to resources with potentially volatile output such as wind projects »Realize improvements in Control Performance Standards  While ADI may help, it will not replace need for regulating reserve resources

12 Request for Proposals  Getting more difficult to find Regulating Reserve products.  Began RFP process in November 2006 for longer term needs beginning January 1, Existing Transmission contract expired December 31, 2007 »Very few proposals received 1/15/2007 »Transmission negotiated 2 agreements to replace traditional 60 MW agreement »Energy Supply extended arrangement with Avista for self provision of Regulating Reserves for Judith Gap Integration

13 Description of Transmission Group Contracts  The new agreements replace what NWE had.  Term of Agreements: One Year - January 1, 2008 – December 31, 2008  Agreements filed and accepted by FERC late in 2007

14 Energy Supply Contract with Avista  Required for wind integration  Term of Agreement: 13 Months – Dec 1, 2007 – Dec 31, 2008  Agreement filed and accepted by FERC  Significant Cost increase for the products and there is no guarantee of continued availability »Old Costs – 60 MW - $2.6 million annually for the capacity fee »2008 Costs – 85 MW (Transmission and Supply agreements) ♦ over $13 million

15 Next Steps - RFP for Service – beginning 1/1/2009  On November 8, 2007, NWE issued another Request for Proposal for Regulating Reserve Service to begin January 1, 2009 »Very broadly distributed »Currently evaluating responses  Supply Evaluating Option of Equity Ownership of Regulation Resource