Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.

Slides:



Advertisements
Similar presentations
Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
CALICE: WP4 Thermal and Mechanical Roger Barlow Cambridge 10 September 2005.
Top Side Conductor vacuum deposition Aluminum sputter deposit in Argon plasma CVC 601-sputter deposition tool.
Placing glue dots 18 x 18 (324) dots on 5mm grid takes ~5min.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
Chip Carrier Package as an Alternative for Known Good Die
Status and outlook of the Medipix3 TSV project
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Current ILC work at Fermilab Electrical Engineering Dept.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Receive processed un-thinned wafers from E2V. Processed for bump bonding (dice, bump and attach read out chip)
3M Bonding Systems Division Adhesives for Electronics Reliability Study of Sub 100 Micron Pitch, Flex-to-ITO/glass Interconnection, Bonded with an Anisotropic.
Co-Cure Stave Construction 11/10/2010. Co-Cure cables should have flashbreaker tape still covering the surface for this process. SO - don’t remove the.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Manchester Qualification M-O-048. Mechanical dummy. Check that tuning of alignment parameters had correct sign and adjustment of transfer chucks Z was.
RAL Instrumentation DepartmentViraj Perera Generic Test Module & BGAs Similar architecture to DSS with Virtex FPGAs.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
Low Mass Rui de Oliveira (CERN) July
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
ATHENA - Module Construction P. Riedler, J. Rochet.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
S Pyatt 1 UV glue dispensing studies on the Dima Dotmaster Glue gap checks.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Update on Pavia MM mechanical prototype
Glue curing studies (contd)
Ladder Assembly All tools and jigs produced Glue dispensing works
Sector 002 Assembly status report
Hybrid Pixel R&D and Interconnect Technologies
Ladder Assembly All tools and jigs produced Glue dispensing works
Gluing jigs for Demonstrator
UV glue dispensing studies
SCUBA-2 Detector Technology Development
Module/Ladder Assembly
What determines impedance ?
Pixel module assembly tooling
Presentation transcript:

Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08

Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical resistances < Ohm ( Gold /dot/Gold) Need good control on gap thickness Now modifying commercial BGA workstation as demonstration pick and place tool to position wafers on glued pcb. Wafers not handled manually Manual operation of workstation but shows automated concept

Placing glue dots 18 x 18 (324) dots on 5mm grid (1 wafer ) 0.2 sec/ dot takes ~ 5min Highly reproducible Glue Dot dispensing Sony dispensing robot

Ø1.6 mm +/- 50 micron gap = +/- 0.5 mm diameter Ø2.0 mm Ø2.5 mm Ø3.6 mm Dot size dependence on gap spacing 200  0 Glass plate wedge spacing

12 x 6 sec on CALICE test board Each pad probe able from rear Two boards sandwiched together, 66µm gap Interpad links cut on top board 4 Terminal resistances between overlapping pads measured – <0.005Ω per pad Dot resistance tests Needs repeating with silicon wafer

Wafer Pick and place demonstrator Modifying existing commercial BGA placement station to pick and place wafers on to glued pcb held on vacuum jig. Alignment via split prism viewing system. Align images of wafer pixels and PCB pixels. Manual operation could be automated with pattern recognition rebuild pick up vac chuck for 90 mm wafer base vac chuck to hold PCB Investigate spacing control ideas - vacuum transfer chuck Assistance from Scott Kolya

Spacing Control Solutions 1.Removable spacers such as nylon line – c.f calice prototype - difficult at this dot size - very manual - not automatable  reject this 2. Make few small (100 micron?) glue dots on PCB in a previous step to act as minimum gap defining spacers. Dispense glue on pcb Carefully tune height of top jig - weight flattens wafers. 3. Use a top vacuum jig to control height – vacuum straightens wafers More complex handling – align 4 wafers with BGA tool then pick up using a vacuum transfer jig. Transfer to separate jig with glued pcb as bottom plate. Maintain vacuum during cure Preferred solution - Wafers held flat and defined in x,y,z during glue cure Spacing control is critical to dot diameter and also module thickness It is known that silicon wafers are usually bowed -typically microns - single sided etch – uneven stress

Schematic of wafer assembly steps 1.4 wafers (red) picked and aligned on BGA station relative to pcb pattern ( orange). Held in position by vacuum. 2. Transfer chuck lowered on top.Vacuum top on, bottom off. Wafers now held on transfer chuck 3. Remove transfer chuck from BGA workstation maintaining vacuum 4.Pcb (blue) held flat in bottom vac jig. Glue robot dispenses dots 5. Transfer chuck with wafers placed on bottom jig. Alignment dowels/touch bearings Fine tune height. Maintain vac during cure 6. Remove assembled board

Vacuum Transfer Jig controls Portable vacuum Jig Control Trolley with resevoir for moving transfer jigs from glue robot to alignment workstation Panel controls vacuum on/off to the various jigs.

Summary Glue dot parameters understood Working on wafer pick and place - building jigs/ vacuum transfer system to control flatness/spacing Timescales - influenced by : - STFC cut backs reduced effort to 2 months technical 1 month engineer - Manchester priorities - attempting to get electronics help with placement - Scott Kolya - components PCB, Wafers.