Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
Basics of Vacuum Technology Unit: Pa = N/m 2 = J/m 3 UnitPa or N/m 2 bar10 5 mbar100 atm= 760 torr x 10 5.
PWF 3/01 Plasma Fueling Program1 Pumping Systems for ITER, FIRE and ARIES P. W. Fisher Oak Ridge National Laboratory C. A. Foster Cryogenic Applications.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Cryostat Structural, Thermal, and Vacuum Systems 14 October 2008 Martin Nordby, Gary Guiffre, John Ku, John Hodgson.
Prepared by: Bassem Sobaih ©2014. Fossil fuels, like gas and oil, are not renewable energy. Once they are gone they can't be replenished. Fossil fuels.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Outline (1) Heat Exchanger Types (2) Heat Exchanger Analysis Methods
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Iván Fernández CIEMAT 2 nd EU-US DCLL Workshop, University of California, Los Angeles, Nov th, 2014.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
West input Rotated DN1000 standard valve Options: - small or large link - small link: small or large diameter by Nikhef team.
LISA October 3, 2005 LISA Laser Interferometer Space Antenna Gravitational Physics Program Technical implications Jo van.
AdV cryotrap: cryostat surface is partially exposed to the near mirror (input ~ end). Its seismic shaking is amplified by LN2 boiling. The rest of vacuum.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
Cooling of NA62 vacuum system November 11 th, 2014 E. Harrouch, EN-MEF, on behalf of the NA62 Vacuum Team.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Vacuum / cryo links Design issues Jo van den Brand, Martin Doets Nikhef Cascina Feb. 3,
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Thermodynamics – branch of physics concerned with the study of both thermal and mechanical (or dynamical) concepts. Application: Steam Engines in 1800’s.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Installation of the T600 at Fermilab CSN2, September 22,
MAIN LINAC CRYOMODULE DESIGN REVIEW INPUT COUPLER September 5, 2012V. Veshcherevich.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
CERN – Zanon discussions
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
Sub-system integration for the VBOX
Ti/SS transitions A.Basti INFN-PISA*
HFM Test Station Main Cryostat
RTML Vacuum System RDR Summary FermiLab October 24, 2007
Proximity Cryogenics P&IDs meeting
SPS cryogenic proximity equipment and SM18 validation
LARP Vertical Test Facility
Functional interfaces
Pixel CO2 Cooling Status
Advanced Virgo – Nikhef tasks
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
AdV - Internal Review of VAC subsystem
Sketch and rough estimation of a colder trap for AdV central area
Cryomodules Challenges for PERLE
Presentation transcript:

Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,

West end Conceptual design Antonio

West input Rotated DN1000 standard valve Options: - small or large link - small link: small or large diameter

West input Short cryo link

West input DN1000 standard valve DN630 standard valve (D = 650 mm) Ion pumps

West input New valve position Valve DN630 Adapter 700 for end stations

West / North end Cold surface: length: 2023 mm diameter: 1000 mm Baffles: diameter: 600 mm 3 needed to cover cold surface temperature influences mirror temperature material: stainless / glass? Mirror

Side view L = 3490 mm D = 1208 mm S.St. 304LReinforcement ribs Hydroformed bellows

Cryo link details LN2 vessel support Baffle D= 620 mm 3.2 mm/m Heat bridge/expansion bellows superinsulation LN2 (200 l)

Transfer line connections 34 mm 60 mm LN2 max level (control ± 10 mm) Bath width: 325 mm Rapid heatup LN2 inlet duct

Phase separator 2 m above cryo link

Performance Expected water load: mbar l/s – Q 1 year = 3150 mbar l gas – 22,400 mbar l = 1 mol = 18 gram – Thus, expected load 0.14 mol or 2.5 gram water Expected layer – Length 2.0 m, diameter 1 m, Area =  DL – Number of sites cm -2 – After 1 year expect 0.4 micron layer Heat load and LN2 consumption – Depends on emissivity 0.1 – 0.2 – Heat load 200 – 300 W LN2 consumption: 3.5 liter/hour Expected gas load: 0.2 liter/s

Logistics Quotations: total 789 kEuro (939 kEuro including VAT) – R&D phase10 kEuro – Design & engineering45 kEuro – Short link 125 kEuro x 4 Standard phase separator Simple LN2 extraction Simplification of separation rings for LN2 circuit – Valve DN kEuro x 4 ex VAT ex 7.5% discount – Other items75 kEuro Valve DN100 Turbo molecular pump station Gauges, control, tubing, etc. Manpower ~ 5 fte – Mechanical and control system design – Construction of (support) structures, etc – Testing – Installation

Summary Preliminary design for short cryo links – Length 2.0 m, diameter 1 m – Capacity > 1 year for 1 micron layer – Reduced heat load: 200 – 300 W LN2 consumption: 3.5 liter/hour Low gas load (0.2 liter/s), less bubbles, less noise – Thermal effect on mirrors acceptable – Reduced cost Test set-up – Operations External vs closed loop condensor Consumption versus coverage (emissivity development) Control issues (normal running, regeneration, …) – Bubble induced noise