Getting Your Project Started Chapter 1 © 2014 by John Wiley & Sons, Inc.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Among the most important advisors to a construction firm are: –Professional surety bond producer –Construction-oriented certified public accountant –Knowledgeable.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
An Introduction to professional services. The professional services The professional services support businesses of all sizes across the economy, providing.
Unit 6: Procuring and Managing Resources CERT Program Manager.
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
CONSTRUCTION AND MAINTENANCE DEPARTMENT THE DRY DEPARTMENT PRESENTED BY HELLEN N. KARU University of Nairobi 1.
Executive Recruiting, Inc. Bringing together exceptional talent with exceptional opportunities.
Capabilities Presentation Please select the button above that best describes your interest to learn more about how Formare Technica, Ltd. can help you.
Customer Service & Customer Protection in MANSELL
The Analyst as a Project Manager
Copyright © 2006 by John Wiley & Sons, Inc. All rights reserved Introduction to Part 2. Feeding the Masses Chapter 7. Culinary Careers in B & I Foodservice.
It All Starts with the Menu
The Camp Audit “Keep your friends close and your auditor closer”
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Business Consulting Services Agenda Discussion: Initial Client Meeting Discussion: Statement of Work Upcoming Events Review Questions.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Construction Engineering 221 Cost Estimating and Bidding.
Cost Control Measures for Food Service Operations
Design & Layout of Foodservice Facilities
Principles of Food, Beverage, and Labor Cost Controls, Ninth Edition.
Chapter 5 Initiating and Planning Systems Development Projects
Genesis Solar Module Brochure ™
Measure what matters – to build stronger financial performance and to achieve financial stability under OFR Peter Scott Peter Scott Consulting
24 Legal and Ethical Considerations. 24 Legal and Ethical Considerations.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Hospitality Services Group COOPERATIVE PURCHASING SINCE 1989.
Systems Analysis and Design with UML Version 2
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
Topics for Today’s Program ä Is your company really Selling ? ä Do you differentiate yourself and sell your added value ? ä Are you selling the right people.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Dynamics of Leadership
Purchasing Overview. Fundamentals of Purchasing Procedures.
Chapter 3, Part 1 Product Design
Module 2 - Hire Find and Hire the Right People. Hiring a Virtual Team Keep it simple! Not the same as a corporate (employee) hiring process Be clear on.
Construction Contracts and Project Delivery Methods
Chapter 5 : Initiating and Planning Systems Development Projects.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
CHAPTER 19 INVESTMENT BANKING. Investment Banking Investment Banks (IB) are the most important participant in the direct financial markets Assist firms.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
Practice Management Quality Control
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
An Introduction To Food Service Consulting FCSI & AIA Working Together.
Agency Construction Management :CM NOT AT-RISK
Concepts in Enterprise Resource Planning Fourth Edition
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
 Establish a fair and honest fee for the work  Make sure that the Agency has developed a clear and concise program for the work  The DPW PM is the arbitrator.
Process of Planning, Designing and Financing a Hospital
Retail Certificate III 2010  Introductions  Name Name  What do you want to do in the future?  Course overview  Unit overview  Assessments  Review.
CH. 17 Class Discussion MANAGING OPERATIONS AND STAFFING.
Your Financial Toolkit: Who can provide the right financial tools for your charter school? presented by SEFCU.
POB 4.01 PARTS 1 & Understand financial planning.
1 Resource based planning Tom Schacher SHA Construction Course, March 16 – 20, 2009 in Walkringen.
Vendor-Selection Criteria Overall Value Understand how methods used to select a vendor affect an F&B operation’s cost of sales. Develop selection criteria.
Careers in Distribution, Copyright 2005, WERC Careers in Distribution Management Jobs.
Human Resource Management HRM Gary Dessler. Our syllabus will include these chapters: Ch. 1- Introduction to Human Resource Management Ch. 3- Human Resource.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Construction Management At Risk Process
ORGANIZATIONAL FEASIBILITY STUDY 1 Chapter (5) Lecturer.Ahmed El Rawas.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Reducing the Risk of Litigation. Coach Warn athletes of potential dangers involved in sport Supervise regularly and attentively Prepare and condition.
ETHICAL ISSUES IN HEALTH AND NURSING PRACTICE CODE OF ETHICS, STANDARDS OF CONDUCT, PERFORMANCE AND ETHICS FOR NURSES AND MIDWIVES.
How to write an effective RFP
Roles and responsibilities PM
Professional Relationships Important to Construction Firms The Value of Construction-Oriented Certified Public Accountants © Copyright 2016 NASBP.
Systems Analysis and Design in a Changing World, 4th Edition
Sections in a Venture Plan
MAINTAINING FINANCIAL INFORMATION
Sections in a Venture Plan
Presentation transcript:

Getting Your Project Started Chapter 1 © 2014 by John Wiley & Sons, Inc.

In this chapter, you will learn about:  Preliminary planning steps for foodservice businesses  Creating a business plan and feasibility studies  Calculating prime cost estimates  Types of foodservice designers and consultants  How to work with designers and consultants  Factors to consider in determining the scope of work and related fees for your project  Professional and ethical considerations of consultants Learning Objectives © 2014 by John Wiley & Sons, Inc.

 The design process is complex.  A lot of information must be provided to contractors.  The person or firm supervising a foodservice design project must have thorough knowledge of:  Current building codes and permitting processes  Health and safety codes, for buildings and equipment  Requirements of the Americans with Disabilities Act  Local contractors and equipment availability Why Hire a Consultant? © 2014 by John Wiley & Sons, Inc.

Don’t hire a contractor before you know exactly what you’re hiring them for. Prepare:  A basic business plan with details of your concept.  A financial feasibility study  Projected sales and expenses.  A market feasibility study  Site information Initial Planning & Project Considerations Source: John R. Walker, The Restaurant: From Concept to Operation, 6th Edition. This material is licensed by permission of John Wiley & Sons, Inc., © 2014 by John Wiley & Sons, Inc.

 Discuss the various areas of consultants’ expertise. Which would you find useful – or unnecessary? Finding a Qualified Designer or Consultant Accounting & FinanceArchitectural design Beverage system designBusiness strategy Capital budgetingCode compliance Compliance certificationConcept development Contract managementCulinary development Dietary and nutritionDistribution, procurement Due diligenceEnergy & environment Equipment surveysExecutive coaching Facility assessmentsFeasibility studies Finance-raisingFood production systems design © 2014 by John Wiley & Sons, Inc.

 More consultants’ areas of expertise. Which would you need? Finding a Qualified Designer or Consultant (cont’d) Food safety & hygieneFranchising Human resourcesImagineering Interior designIT systems, sourcing, management Kitchen designLaundry design LEED compliance & designLegal advice, litigation support Master planningMarketing & promotion Management recruitment & development Menu development & engineering Operating procedures & systems Operations review & re- engineering © 2014 by John Wiley & Sons, Inc.

 More consultants’ areas of expertise. Which would you need? Finding a Qualified Designer or Consultant (cont’d) Operator RFP selection & monitoring Quality management Revenue generationSpace planning Strategic financial analysisSustainability TrainingWaste management design Workshops and educationWorkstation ergonomics & design © 2014 by John Wiley & Sons, Inc.

Interviewing Design Candidates  Look for a level of comfort and trust in these interviews. Ask:  What is your foodservice operational and design background?  Have you worked in or had exposure to a foodservice facility of this type?  Describe your approach to a new project.  How do you ensure you’ll be reasonably accurate in providing what is needed?  How will you make my facility function according to my needs?  How will you select and size the equipment? Finding a Qualified Designer or Consultant (cont’d) © 2014 by John Wiley & Sons, Inc.

Finding a Qualified Designer or Consultant (cont’d) Interviewing Design Candidates (cont’d)  Explain some ways you try to reduce labor and operational costs in the design process or with equipment selection.  How do you charge for your services? Is anything specifically not included in your fees, or anything that requires additional fees?  Do you (personally, or as a company) carry liability insurance for the projects you work on? What other types of insurance do you have?  What are the payment terms for your services?  What value do you deliver that your competitors may not? © 2014 by John Wiley & Sons, Inc.

Types of Designers Membership requires high-caliber work and adherence to a code of ethics. “Professional” status requires yearly education credits. FCSI-affiliated designers Not affiliated with FCSI, which is not necessarily a reflection of their work or professionalism. Other fee- based designers Services included or discounted for purchasing equipment from dealer. Equipment dealer designers © 2014 by John Wiley & Sons, Inc.

Types of Designers (cont’d) Are hired separately or brought in by architect Interior designers Similar standards as FCSI; wide range of expertise. Might be an individual or a firm. Management Advisory Services Consultants (MAS) © 2014 by John Wiley & Sons, Inc.

Who’s in charge? The options:  You – because you’re paying the bills and want to stay involved; or your project is complex and you need to be involved.  The architect – because this person can deal with the design consultant and only involve you if necessary.  The general contractor – because this person can deal with the design consultant along with the other contractors and their crews. Who is the Consultant’s Customer? © 2014 by John Wiley & Sons, Inc.

 Most design work is done before the space is actually laid out.  If process goes smoothly, a consultant should not have to ask or justify need for more or less space in an area.  Everyone on team should know whom to ask if they have questions, and who makes the final call on design decisions.  Delays, cost overruns usually mean poor planning. Who is the Consultant’s Customer? (cont’d) © 2014 by John Wiley & Sons, Inc.

 Spell out all requirements in Requests for Proposal (RFP) to contractors.  Include detailed Scope of Work: timeline, deadlines, description of all services to be provided.  Determine your hard costs (construction, labor, materials, equipment)  Determine your soft costs (permits, license fees).  A wide range of bid amounts often means your Scope of Work isn’t detailed enough.  Consider quality and experience when comparing bids.  Ask contractors for a fee rationale – don’t be shy about asking how they set their fees. Establishing a Scope of Work, Bids & Fees © 2014 by John Wiley & Sons, Inc.

 Consultants’ Responsibilities  Can you think of examples in a team setting where these traits have been evident from a project consultant?  Bring a commitment to the project.  Be willing to share information.  Inspire confidence as part of the team.  Go the extra yard; give more than is expected.  Meet deadlines and respond quickly to questions.  Don’t promise what you can’t deliver  Respect the client’s knowledge and experience. Establishing a Scope of Work, Bids & Fees (cont’d) © 2014 by John Wiley & Sons, Inc.

 Consultants’ Responsibilities (cont’d)  Work hard to meld the consultants into the team.  Be totally honest and open about the operation and its problems.  Respond to questions and concerns quickly and fully.  Respect the consultants’ requirements and experience.  Pay on time. Establishing a Scope of Work, Bids & Fees (cont’d) © 2014 by John Wiley & Sons, Inc.

 Follow your gut in selecting your design team:  Will team members play by the rules?  Will they treat others with fairness and respect – even when deadlines loom and disagreements arise?  Can you trust people on the team with money? With confidential information?  If issues arise after the work is done, will this person or firm still be willing to work with you to make it right?  Are these the kinds of people you’d like to maintain an ongoing relationship with when the project is finished? Professionalism & Ethics © 2014 by John Wiley & Sons, Inc.