Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.

Slides:



Advertisements
Similar presentations
CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Mar. 22, 2005 TB Summary, LCWS2005 J. Yu, UTA 1 ILC Test Beam *On behalf of the HEP group at UTA. Introduction What has been happening? Beam Test Timeline.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
(I)LC Test Beam Accomplishments IN2P3 – LAL Nov. 3, 2009 Jae Yu World-wide effort of ILC Detector R&D TB Facilities’ Accomplishments Detector.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
June 20, 2007US ILC TB J. Yu 1 US ILC Test Beams DOE/NSF ILC Detector R&D Review June 19 – 20, 2007 Jae Yu University of Texas at Arlington Introduction.
08/04/05Erika Garutti1 Status of Detector R&D March 18-22: in LCWS05 Latest news on: - detector concept - detector R&D - dead lines and schedules - test.
Plans for Linear Collider Calorimetry Test Beam Work at Fermilab Andy White for U.S.+European-CALICE and other collaborators.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Summary of LCTW09 Roman Pöschl LAL Orsay LCWS 2010 Beijing/China March 2010.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
CALICE meeting - ANL 1 I am sad to announce you that Vincent Lepeltier died this morning by heart attack He was a strong supporter of ILC in France Working.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
9/2/2004 TB Strategy J. Yu 1 LC Test Beam Funding and Strategy Large number of detector R&D groups made great progress Technology decision provides great.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
June 1, 2007GEM DHCAL Status Report J. Yu 1 UTA GEM DHCAL Update June 1, 2007 LCWS2007, DESY Jae Yu University of Texas at Arlington For GEM/DHCAL Group.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
5/12/2007 CALICE Meeting, Kobe Univ. J. Yu, UTA 1 Technical Board Review Report Forewords Review Goals Review results: Finding, Risks and Recommendations.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
Test Beam: Calorimetric Wishes… Steve Magill, Jose Repond, Andre Turcot, Jae Yu* Jan. 10, 2003 Goals for calorimeter test beam What’s needed for EFA? Requirements.
José Repond Argonne National Laboratory LCWS, Vancouver, Canada, July 19 – 22, 2006 American Test Beam Plans.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
SiD Detector Concept R&D Perspective Andy White SiD R&D Coordinator University of Texas at Arlington.
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Introductory remarks Felix Sefkow Collaboration Meeting
US ILC Test Beams Introduction
Outlook by the Physics Coordinator
Introductory remarks David Ward
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
(My personal) CALICE Report
Testbeam Timing Issues.
So what have we learned and what’s the roadmap?
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
GEM-based Digital Hadron Calorimetry for SiD
Status of SuperKEKB May 11, 2007 SuperB Workshop Masa Yamauchi KEK.
GEM DHCAL Status and Plans
CALICE: Major Items Since September
Michele Faucci Giannelli
CALICE(-UK) Status Paul Dauncey 7 Oct 2004 Paul Dauncey.
Presentation transcript:

Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions

Beam Test Activities Facilities Update FNAL: –MTBF was brought back up June 2006 after a 14 week shutdown –MTBF is offered to a few existing programs –An upgrade proposal has been made and the detailed schedule is still being worked out for it Improvement of low E secondary beam rates  See Erik’s talk Possible MC beam line availability for additional actvities EUDET: –Kicked off on Feb.15 – 17 at DESY –Will utilize DESY and CERN facilities CERN: –Offers beam tests this year –Next year’s schedule is unclear KEK facility has been shutdown since end of 2005 but.. –A new proposal for 3GeV electron beam using bremsstrahlung photons from KEK-B HER

Beam Test Activities Many calorimeter activities –DHCAL (Repond) RPC DHCAL –Three ANL+IU RPC Chambers at MTBF early 2006 (FNAL T955) –Plan to go in again in the fall 2006 and slice test in early 2007 GEM DHCAL –One 30cmx30cm chamber exposed to high intensity, low E electron beam at KAERI in May 2006 –Plan to expose to hadron beams at MTBF in the fall 2006 and slice test in early 2007 NIU TCMT –One layer of cassette exposed to beam at DESY in fall 2005 –Exposed to hadron beams at MTBF early 2006 (FNAL T957)

Beam Test Activities –CALICE (White) Si-W ECAL and Scintillator AHCAL installed at CERN SPS H6 beam line Will be exposed to beams in three distinct periods, totaling 8 weeks –ASIAN Scintillator-Tungsten ECAL Plans to come in mid to end 2007 to FNAL for beam tests Muons –FNAL-IU+WSU scintillator muons (Abrams) ongoing at MTBF (FNAL T956) Tracking: –TPC group wants high E, multi-particle beam at FNAL in 2007 –No US group plans in the immediate future but some Si tracker activities anticipated in 2007 Vertex: LBNL Vertex group using LBNL radiation facility –Will need pion beams in late 2007 or early 2008 E  >5GeV needed

Beam Test Activities FNAL ILC-Task Force FNAL Directorate initiated TF on increasing FNAL’s contribution to ILC and its chance to bid for hosting it Test Beam Facilities is one of the working group tasks –Made several initial draft recommendations Upgrade of MTBF to meet needs in the immediate future Availability of MCenter for the intermediate future Develop plans to gradually convert Neutrino beam lines to prepare for ILC activities in 3 – 5 year time scale Boost TB activities to a level of experiments Establish beam tests as scientific programs The working group needs to collect your requirements for beam tests

Beam Test Activities Detector R&D, ILC Detector Concept Development LC Detector Time Line Det. Construction Selection of ILC Detectors Det. R&D Technology choices We are here!! ILC Global Detector Prototyping & calibration ILC Detector prototype testing, Construction & Calibration ILC det. CDR/TDR ILC Construction ILC Physics Program ILC Physics

Beam Test Activities Existing Fermilab Assets MT MC KTeV NWA Lab-E

Beam Test Activities Conclusions A lot of beam test activities since the last meeting –Still calorimeter driven but other detectors will pick up speed soon Some good news in funds to support large scale beam test activities A lot more are expected in the near future Limited facilities’ availability Need better coordination within ourselves