08/04/05Erika Garutti1 Status of Detector R&D March 18-22: in LCWS05 Latest news on: - detector concept - detector R&D - dead lines and schedules - test.

Similar presentations


Presentation on theme: "08/04/05Erika Garutti1 Status of Detector R&D March 18-22: in LCWS05 Latest news on: - detector concept - detector R&D - dead lines and schedules - test."— Presentation transcript:

1 08/04/05Erika Garutti1 Status of Detector R&D March 18-22: in LCWS05 Latest news on: - detector concept - detector R&D - dead lines and schedules - test beam activities and plans http://www-conf.slac.stanford.edu/lcws05/default.htm  A brief summary of the hottest news

2 08/04/05Erika Garutti2 Three Detector Concepts SiD: Silicon basedLDC: large detectorGLD: even larger detector Silicon tracker Gaseous tracker B = 5T B = 4T B = 3T

3 IFAE Catania - E. Garutti3 Detector Concepts Concepts currently studies differ mainly in SIZE and aspect ratio Relevant: inner radius of ECAL: defines the overall scale LDC SiD GLD ECAL end-view Tracker SiD LDC GLD B = 5T B = 4T B = 3T Figure of merit (ECAL): Barrel: B R in 2 / R m effective Endcap: "B" Z 2 / R m effective R in : Inner radius of Barrel ECAL Z : Z of EC ECAL front face Different approaches SiD: B R in 2 LDC: B R in 2 GLD: B R in 2

4 Inner Tracking/Vertex Detection Detector Requirements Excellent space point precision ( < 4  s ) Superb impact parameter resolution ( 5µm  10µm/(p sin 3/2  ) ) Transparency ( ~0.1% X 0 per layer / 4-5 layers) Track reconstruction ( find tracks in VXD alone )  commonly agreed: Pixel Detector keep occupancy below 1% given the bunch structure:  with pixels ~ 20 x 20 μm 2 : 1) readout ~20 times during bunch train CCD: Charge-Coupled Devices DEPFET: DEpleted P-channel Field Effect Transistor MAPS: Monolithic Active Pixels SoI: Silicon on Insulator 2) store ~20 signals during bunch train ISIS: Imagine Sensor with In-Situ Storage HAPS: Hybrid Pixel Sensors OR 3) make pixels 20 times smaller FPCCD: Fine Pixel CCD (5x5 μm 2 ) before LCWS05 11 technologies 26 groups 12 / / 30 / / after

5 08/04/05Erika Garutti5 1 Storage gate 2 4 5 6 20 19 18 17 7 8 RSEL OD RD RG OS to column load Storage gate 3 Transfer gate 8 Output gate Output node Photogate Charge generation Transfer Storage Readback from gate 6 Idea by D. Burt and R. Bell (E2V) 2) Revolver ISIS

6 08/04/05Erika Garutti6 Tracking Detector: TPCs Carleton, Aachen, Desy(not shown) for B=0 studies with laser or cosmics Desy, Victoria, Saclay (fit in 2-5T magnets)

7 08/04/05Erika Garutti7 TPC: status and next steps A large international Community is engaged in TPC R&D Both GEMs and MICROMEGAS seem to work Construction of a ‘Large Prototype’ Full System Test with the ‘Large Prototype’ in a beam A Collection of ongoing R&D topics: Choice of gas mixture (Diffusion, D-velocity) Ion feedback Readout electronics (pad density) Neutron background R.K.Carnegie et.al., to be published First results Micromegas with charge dispersion readout GEM with charge dispersion readout

8 08/04/05Erika Garutti8 Tracking detector: Silicon Strip H. Park (BAERI, KNU) On behalf of Korean Silicon Group Double sided silicon strips Fabrication “in house” Sensor size: 55.6x29 mm 512 strips, 50 um pitch 5” wafers, 380 um thick Quality control test performed: Electronic, Source, Radiation damage

9 08/04/05Erika Garutti9 ECAL designs Si-W CALICE  30% of layers tested @ DESY  SLAC-Oregon  under production Scintillator-W Korea  tested @ CERN 29%/  E (vs. 18%/  E for GEANT4) Colorado  under production Scintillator-Pb Japan-Korea-Russia  tested @ DESY & KEK Hybrid Scintillator/Si-W INFN Padova  tested @ CERN  E/E ~11.-11.5% /  E,  pos ~2 mm (@ 30 GeV)

10 08/04/05Erika Garutti10 Move (completed) module to Fermilab test beam late 2005 CALICE ECAL @ DESY testbeam Detector slab

11 08/04/05Erika Garutti11 HCAL and Tail catcher designs HCAL: Scintillator + Analog readout Japan  tested @ KEK & FNAL CALICE  100 ch. prototype tested @ DESY  8000 ch. prototype under construction HCAL: Digital readout CALICE  GEM plates, under construction CALICE  RPC plates, under construction Tail catcher / Muon detector: US Collaboration  Scintillator strip CALICE / NIU  Scintillator strip CaPiRe (European)  RPC plate, tested @ Frascati

12 30 March 200512 100 channels prototype tested at DESY testbeam in 2004 Excellent results obtained!  Prototype under construction: 1m 3 8000 cells, from 3x3cm 2 CALICE A-HCAL Lateral shower shapeLongitudinal shower shape 5x5cm 2 tile

13 08/04/05Erika Garutti13 Next Test Beam Activities CALICE SiW ECAL CALICE TILE AHCAL+TCMT OTHER ECALs CALICE DHCALs Combined Calorimeters 2008200720062005 2009>2009 PFA and shower library Related Data Taking ILCD R&D, calibration Phase I: Detector R&D, PFA development, Tech. Choice Phase II Phase 0: Prep. Timeline of Beam Tests MDI, , tracking, etc Mainly driven by calorimeter activities From 2006 only FNAL / Protvino available with low-high E hadrons

14 08/04/05Erika Garutti14 CalorimeterProjectLead institution ECAL Silicon-Tungsten (CALICE)LLR Silicon-Tungsten (US)SLAC, Oregon Scintillator-TungstenShinshu Scintillator-TungstenColorado Scintillator-Silicon-TungstenKansas Scintillator-Silicon-LeadPadova HCAL Scintillator-SteelDESY RPC-SteelITEP, ANL GEM-SteelUTA Muon-detectors/tail catcher Scintillator-SteelDESY/FNAL/NIU RPC-SteelFrascati An ILC planning document submitted to Fermilab (FNAL–TM–2291)FNAL–TM–2291 11 projects proposed by 28 institutions from 3 regions Planning Document for FNAL J. Repond

15 08/04/05Erika Garutti15 Tail Catcher ECAL HCAL Electronic Racks Beam CALICE Setup V-Trial at FNAL MTBF K. Gadow (DESY)

16 08/04/05Erika Garutti16 Test beam for VTX & Tracking VTX and Tracking group plans to put down requirements for beam tests –Less stringent beam requirement compared to CAL Broader facility options But still need to specify requirements –First requirements to be presented in Snowmass D. Bailey, H.E.Fisk

17 08/04/05Erika Garutti17 Conclusion Wolfgang Lohmann (review of detector R&D): Its time to organize our community world wide to strengthen and structure the efforts in ILC Detector R&D Andy White (summary talk on Calorimetry): A vigorous program of LC calorimetry […] development is underway Many results from prototypes – but we should avoid too much duplication It is critical to carry out an R&D survey and ensure that Detector R&D proceeds in a timely manner alongside Accelerator R&D. Ji Yu (summary talk on Test Beams): Tremendous amount of activities Limited number of facilities for a combined calorimeter beam tests Fermilab is working closely with LC TB community WW coordination effort to pick up momentum Outlook: see you at LCWS06 !!!