Development in Austin. West Campus Redevelopment.

Slides:



Advertisements
Similar presentations
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Advertisements

GreenPlan Downtown Design and Greenberg Development Services Report.
Agenda Presentation: Background Proposed Corridors Uses Standards & Building Examples Q & A Small Group Discussions Report Back.
General Overview of Parking Requirements. Standard 8 ½ x 17 feet Parallel 22 x 6 ½ feet 8.5 feet 17 feet 6.5 ft 22 feet.
Twinbrook Sector Plan A New Community in the Technology Corridor
San Mateo Rail Corridor Transit Oriented Development Plan ABAG/MTC/ULI Workshop September 29, 2006.
Suggested Changes to Centers and Corridors Design Standards and Guidelines Amber Waldref August 11, 2014.
Height Recommendations September 25, 2008 Zoning Commission Case No The District of Columbia Office of Planning’s Comprehensive Review of Zoning.
Department of Transportation Street Classification September 20, 2010.
Source of Specifications:
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
CATEGORIES OF COMMENTS REGARDING THE DOWNTOWN MOTOR APARTMENTS From October 28 th meeting.
Community Opportunities The values associated with Smart Growth communities encourage affordable, mixed income housing; higher density; and a vibrant,
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
St. Albans Guide to the Rewrite Process ZONING & SUBDIVISION REGULATIONS.
Land Use Study for the Community of Winchester May 21, 2012.
MARICOPA ZONING CODE REWRITE Outline and Module 1 Discussion Prepared by Dyett & Bhatia June 26, 2013 ZONING CODE REWRITE.
Land Use and Development Regulations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Our object in the construction of the state is.
Draft Zoning Code Residential Focus Neighborhood Meeting May 8, 2007.
Waterford Oaks Comprehensive Plan Amendment A-4-2 January 28, 2014 Board of County Commissioners.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
LEE’S SUMMIT M-150 SUSTAINABLE DEVELOPMENT CORRIDOR OVERLAY DISTRICT AND DESIGN STANDARDS Residential Mixed-Density  Residential density range: 6-10 du/ac.
Official Plan Zoning Bylaw Land Uses
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
West Tampa Volunteers Transportation and Land Use Committee.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Integrating Uses.
3D Computer Study Model: Hillhurst/Sunnyside Richard M. Levy, Ph.D. MCIP.
Request: rezone 32 acres from PD-OP (Office Park) to R-16 (Residential) & PD-CC-CC (Commercial Center) – 128 multifamily units & 260,000 sf retail and.
IMPACT OF ADDITIONAL RESIDENTIAL DENSITY ON Redevelopment of North Toronto Collegiate Institute February 19, 2004 Architects Crang and Boake Inc. Teeple.
CTC Planned Development and Development Agreement Modification January 26, 2016 Planning Commission Hearing Greg Turner, Land Use Manager.
CTC Planned Development and Development Agreement Modification January 12, 2016 Planning Commission Workshop Greg Turner, Land Use Manager.
Dreamer Development, LLC Northeast Gateway A Mixed-Use Land Bridge Development Minneapolis, MN.
University of Kentucky College of Agriculture Landscape Architecture Franklin-Simpson County Potential Neighborhood Development Strategies 158 acres Close.
September Sign Ordinance Meeting. Portable Signs Strip Malls, Downtown, Right of Way.
CITY OF TEHACHAPI DOWNTOWN MASTER PLAN IMPLEMENTATION October 2, 2008.
Community Meeting May 22, 2013 City of Richmond Department of Planning & Development Review.
2803 Dundas Street West Avenue Segment Study. Presentation Outline 1.Study Area and Proposal 2.Policy Context 3.Character Area Response Statement 4.Precedent.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Land Use and Development Regulations © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Our object in the construction of the state is.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZ Glisan Commons May 17, 2012.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
Single Family Districts Working with staff, we ultimately settled on two districts.
1 Pedestrian Commercial Overlay (PCO): Potential Expansion/Creation Presentation to Ghent Business Association June 12, 2013.
Land Development Code Update: 3. Commercial & Multifamily Zones.
BOMES THEATER INFORMATIONAL MEETING Department of Planning & Development City of Providence October 24, 2013.
NEW AND ENHANCED STANDARDS OF THE CURRENT PARKING PLAN BYLAW Proposed Site Plan Review Bylaw.
Works of Art: Redeveloping Properties for Cultural Reuse Harvester Artspace Lofts Council Bluffs, Iowa Tina Hochwender – City of Council Bluffs.
206 THIRD STREET DR/TRP Appeal of. Planning Commission Hearing March 12, 2014, P/C approved a Design Review Permit: - Demolition of the existing.
1 City of Portland Bureau of Development Services Staff Presentation to the Design Commission Land Use Review LU DZ Arthouse.
July 4, 2017 AURORA UNITED CHURCH + SOUTHBOUND DEVELOPMENT LTD Yonge Street, 55&57/57A Temperance Street, 12&16 Tyler Street General Committee Meeting.
Presentation Preview Introductions Purpose for Zoning Code Rewrite
CFT Gateway Center ( E. Foothill Blvd
Residential Building Height Standards
Gateway Specific Plan Concepts
E Properties & Development Holy Family Project Community Report Back Meeting August 7, 2012 St. Mary’s Lyceum – 6pm.
Agenda 15th and Race Project Summary Current Requests
Drawing & Building Names
Site Analysis ID 240 Spring
MarketStreet Advisory Committee Updates
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Land Use and Development Regulations
Hotel Conversions Background
WWPNA General Member Meeting October 16, 2018
Article XIII – Form Districts Community Meeting
Impact of Zoning on Affordable Housing February 16, 2018
115-Unit Mixed-Use Project (711 E
Section 8: SIGNS.
Presentation transcript:

Development in Austin

West Campus Redevelopment

2006

2007

Multi-family residential Single- family residential Commercial

Zoning Revisions “West University Overlay” Heights up to 90’ in some areas, varies throughout West Campus (see map) Building setbacks between 10’ and 15’ At ground level, 75% of frontage must be dedicated to pedestrian- oriented, ground-level uses (e.g. shops, services, housing) Above 1 st storey, 42% of street-side building wall must contain occupant (resid. or commercial) spaces No trash bins, dumpsters, or service boxes obstructing sidewalk or adjoining space Masonry, metal and glass are the recommended surface materials [prohibited are highly-reflective glass (because of glare) and wood (because of rapid deterioration)] Attempt to respond to lower roof-lines in adjacent buildings with angled roofs, strong horizontal elements, etc. Many others see allsee all

Impacts Evident –Lots of demolition –Lots of construction –Deep excavations for parking –Much higher roof lines Expected –As much as more students living within walking-distance from campus –Livelier and more interesting pedestrian environment with shops and services at ground level –Reduction in overall traffic in Austin (up to 10,000 vehicle trips per day)

Downtown Development