Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.

Slides:



Advertisements
Similar presentations
ColumbiaGrid Reliability Workshop October 1, 2007 Developmental and Staffing Reliability Functional Agreement (DSRFA) Details This program is the cornerstone.
Advertisements

WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
1 WECC PCC Meeting March 7, Members Avista Bonneville Power Administration Chelan County PUD Cowlitz County PUD Grant County PUD Puget Sound Energy.
VGS-Planning Work Group (PWG) Activity Update to PCC Ann Finley PWG Liaison to PCC Metropolitan Water District of So. California June 9-11, 2010.
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
CREPC Meeting November 5-6, 2007 Snapshot of Major Transmission Proposals and Status of Transmission Planning Presenters: Paul Arnold and Jeff Miller.
Shawn Davis Regional Policy and Operations Analyst Portland General Electric Proposed Mid-C Scheduling Changes August 20, 2014 Interchange Scheduling and.
NORTHWEST POWER POOL Reliability Update
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Resource Adequacy Forum 2019 Adequacy Assessment Overview PNGC Offices June 28, 2013.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
Multi-Area Stochastic Unit Commitment for High Wind Penetration in a Transmission Constrained Network Shmuel Oren University of California, Berkeley Joint.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
Northwest Power and Conservation Council Oversupply Issue and Challenges Ken Dragoon August 31, 2011.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
Variable Generation Subcommittee Update to PCC Ann Finley - VGS-PCC Liaison Metropolitan Water District of So. Cal October 7, 2014 Salt Lake City, Utah.
Imbalance costs of wind power – how to improve the market integration of wind power Hannele Holttinen Senior Research Scientist, Team leader.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Ann Finley VGS-PCC Liaison VGS Discussion March 25-26, 2014 Salt Lake City, Utah.
Wholesale Power Price Forecast 01/28/03 Current Trends Update March 11, 2003.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
1 Joint Initiative Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
1 The Sustainability Network of Washington County January 27, 2010 Jason Eisdorfer Bonneville Power Administration.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
GHG, Renewables, and Reliability IEP ANNUAL MEETING SEPTEMBER 29, 2015 Carrie Bentley Resero Consulting
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
2010 Work Plan Steering Committee January 29, 2010.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Economic Assessment of Implementing the 10/20 Goals and Energy Efficiency Recommendations – Preliminary Results Prepared for : WRAP, AP2 Forum Prepared.
California’s Summer Outlook and Emerging Electricity Issues Dave Ashuckian, P.E., Manager Electricity Analysis Office Irwindale Energy Forum February 15,
RES = transmission capacity or... December 2011January 2012 MW.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Jagan Mandavilli Senior Reliability Engineer Texas RE NERC DERTF Update ERERERCOT WMS June 3, 2015.
Chuck Goldman Lawrence Berkeley National Laboratory
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
Overview of Northwest Wind Integration Action Plan
Proposed Energy Imbalance Market The Basics
Modeling Assumptions for 2033 High Renewable PCM
IWG Update January 2015 ISAS Danielle Johnson.
Presentation transcript:

Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid

REC Impacts Issue: How will REC definitions, requirement to deliver, and trading practices impact VG placement, energy marketing, and system reliability? Activity: Review current reports and discussions of REC accounting and trading practices, develop a white paper that addresses appropriate recommendations

REC Impacts Work Team is at information gathering stage. – Policy being made by other than operational and marketing types – What impacts will emerge? Penetration levels in excess of load in off peak periods? Upward pressure on BA Reserve Requirements? More curtailments? Downward pressure on market prices, negative pricing, or price volatility? Lowering of GHG through displacement of thermal generation? Offset by need for balancing services? Less need for new long distance transmission to deliver VG?

REC Impacts Work Team participation is open – APS, BPA, Chelan PUD, RNP, SDG&E, PG&E, NPPC – Next conference call is 3 rd week in January – Work Groups meet March 1-3 – VGS meets March 30