National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.

Slides:



Advertisements
Similar presentations
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Advertisements

Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Non-code User Pays. 2 What we will cover Background Current Services Governance Arrangements What is working well What is not working as well.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 Mod Review Group 126 Feb 07 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Customer Charge On behalf of all DNs 25 October 2010.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Industry Dialogue on xoserve Services 14 th September 2007.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Customer Charge On behalf of all DNs 19 November 2010.
Background Current balance of LDZ System and Customer charges
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Distribution Workgroup 24/11/16
Code Governance Review UNC Modification Proposals
Transmission Workgroup 4th October 2012
Performance Indicators
Mod 0621 Amendments to Gas Transmission Charging Regime
Richard Fairholme, E.ON UK
NTS Entry Charging Review Update
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
Exit Capacity Substitution and Revision
Questions for Consultation
Draft Capacity & Connection Plan
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Joint Office Presentation for Modification 0678
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Transmission Workstream 7th December 2006
Transmission Workstream 2nd December 2010
Mark Freeman 29th January 2007
Reinstatement of NTS Interruption
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Presentation transcript:

National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews

Content  Transportation Charging  Changes to DN Transportation Charges  October 2007 Price Changes  General Updates  Changes to Siteworks Terms & Conditions  Developing Competition in Connections Services  National Grid Code of Practice  I&C Round Table

Transportation Charging

DN Transportation Charges  Changes following Ofgem’s review of DN Charges  Rebalancing of Capacity / Commodity split  Change to the Domestic Customer Charge  Updating of the Economic Test  Update of data used to determine structure of Charges  DN Interruption Reform  Removal of Interruptible status  Tender process for DN interruption

Rebalancing of Capacity / Commodity split Forthcoming Pricing Consultation  Move to new capacity / commodity system charge split and adjustment to interruptible discount from April 2008  Move to high capacity element  Better reflects costs  Bring charging structure more into line with expected Price Control structure, to give better price stability  Adjust interruptible discounts to keep them at the same level as at present  May allow move to April rather than October price changes  Initial Discussion Paper expected February

Change to the Domestic Customer Charge  Move from commodity to capacity charging basis  Better reflects costs which don’t vary with throughput:  Service pipe costs  Emergency service costs  Reduces sensitivity of collected income to throughput from 63% to 35%  Helps provide price stability  But Price Control income fixed for 2007/8  April 2007 implementation  Allows capacity charge to be set at annual level  Change is revenue neutral for DNs  Billed by adjusting LDZ System Capacity Charge rate in short-term  New rates will be published by 1 February 2007

Updating of the Economic Test  New DN-specific Economic Test for new connections to be introduced shortly  Test is used to meet Gas Act obligation to connect loads where it is economic to do so  Operates in same manner as existing test  Excludes NTS costs and income  Reflects DN-specific costs and transportation income  Explanatory note issued on application of Economic Test if Interruption Reform goes ahead

Data used to determine Charging Structure Forthcoming Pricing Consultation  The data and calculations to determine current charging structure is on a national basis for all DNs  Ofgem have requested DNs to update this analysis to reflect the individual nature of each DN  Changes to be implemented in October 2008

DN Interruption Reform Forthcoming Pricing Consultation  End of Interruptible Discounts from 2010  subject to Mod 90  How costs of purchasing NTS offtake capacity will be reflected in Distribution Charges from 2010  subject to Exit Reform  Both expected in next month or two  Note that Pension Cost payments to NTS will be reflected through existing DN charging structure

October 2007 Price Changes  Several factors driving price changes  Increased allowed revenue (11%) to cover increased costs  Material under-recovery in 2006/7 (weather effect)  Reductions in SOQ’s in October 2006  October price effect (1.5 x)  Impact of previous price changes  Allowed revenue for 2007 still uncertain:  DNMRA still being determined  Under recovery from 2006/7  Indicatives to be provided asap, updated on ongoing basis

General Updates

Changes to Siteworks Terms & Conditions Background  Changes are necessary to ensure recovery of connections costs from customers and alignment with the Ofgem’s views that DNs should take “…additional steps to manage under-recoveries in connection costs from customers due to time lags and conservative charging…”  In providing fixed quotations for connections, National Grid Gas is exposed to any changes to its cost base between issuing the quotation and final completion  This period is currently 1 calendar year - the combined effect of the changes reduce this risk period down to 6 months  Following the changes to charging methodology in July 2006, where charges now reflect the costs we reasonably expect to incur, we believe that 6 months is a reasonable and manageable time frame on which to base our quotations  Section G7.2.4 of the Uniform Network Code requires National Grid to give Users 3 months notice of any change to contract terms  Formal notice was issued 29 th December 2006.

Changes to Siteworks Terms & Conditions Changes effective from 1 April 07  Changes will be effective for all new requests received on or after 1 April key changes are detailed below:  Quotation validity period  Reduced from 90 to 45 days, and  Termination  Quotation to substantial completion (gas on) - reduced from 270 days to 120 days and Quotation to final completion - reduced from 1 calendar year to 6 months  Customers will be able to extend works beyond these timescales on payment of a variation to cover any increases in costs where they arise  Stage Works Notice Period  An alignment of the notice period (from the customer) for non main laying works with the notice period for main laying works – customer to notification increase from 15 to at least 30 working days  Guidance Notes  Currently significant duplication between the Guidance Notes (introduced in 2004) and Siteworks Terms – guidance notes therefore to be withdrawn

Changes to Siteworks Terms & Conditions Changes effective from 1 April 08  National Grid also intends to carry out a complete review of the Siteworks Terms during this will involve:  Bringing the terms into line with the Engineering and Construction Short Contract  Moving all customers onto pre-payment terms  National Grid will provide detail of these changes once proposals have been developed further

Developing Competition in Connections Services Background  National Grid is committed to the ongoing support for a competitive connections market

Developing Competition in Connections Services National Grid Consultation  Consultation launched proposing specific changes to improve and simplify business processes  Published 12 th January 2007  Closing Date 1 st March 2007  Initiatives remain consistent with established National Grid principles, namely  Every Customer should have a choice of Connection Service Provider  There must be equality of treatment between Connections Service Providers  Customers should pay market price for connection services received* * except where a gas transporter has a legal or licence obligation to fund part of the cost (which may be recovered from transportation customers)

National Grid Code of Practice for Gas Customers  National Grid has a Licence obligation to make available to the general public its Code of Practice  The Code informs customers:  When and how we might contact them  How they can get in touch with us to enquire or complain about any service we provide  The steps we take to ensure that only properly trained staff or contractors make visits to their home  The special services available to those customers who are blind, partially sighted, deaf or hearing impaired

National Grid Code of Practice Raising Awareness  Availability from February:  Hard Copies: 9 language versions, Braille, Audio, Large Print  Website: as above and an easy to read version  External Organisations to be contacted  Shippers/suppliers  Care agencies  Libraries  All employees and contractors in the UK gas business will be briefed from February

National Grid I&C Round Table  Next “I&C Round Table” date confirmed!  Date: Tuesday 20 th March  Time: 11.00am – 1.00pm  Venue: National Grid House, Gallows Hill, Warwick, CV34 6DA  Agenda items would be welcomed as early as possible to assist in collating information and arranging speakers