This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.

Slides:



Advertisements
Similar presentations
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
Advertisements

e-ScienceTalk: Supporting Grid and High Performance Computing Reporting across Europe GA No September 2010 – 31 May 2013.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
Interest for the Economy: Reaching Supersites sustainability through the creation of a science - commercial ecosystem This document produced by Members.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
The Preparatory Phase Proposal a first draft to be discussed.
European Life Sciences Infrastructure for Biological Information ELIXIR
Procurement Innovation for Cloud Services in Europe CERN – 14 May 2014 Bob Jones (CERN) This document produced by Members of the Helix Nebula consortium.
Advanced Computing Services for Research Organisations Bob Jones Head of openlab IT dept CERN This document produced by Members of the Helix Nebula consortium.
WP2 – Engagement and Dissemination HN Annual Review Dr. Giles Hogben Cloud Security Alliance, EMEA 1 This document produced by Members of the Helix Nebula.
WP2: Engagement and Dissemination Daniele Catteddu Cloud Security Alliance.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
Helix Nebula The Science Cloud CERN – 14 May 2014 Bob Jones (CERN) This document produced by Members of the Helix Nebula consortium is licensed under a.
December 2010iTEC - Designing the future classroom1 אלף כיתות משתתפות במיזם לעיצוב כיתת הלימוד העתידית – iTEC דב וינר iTEC – Designing the future classroom.
WP8– Governance Models Bernd Schirpke / Jurry de la Mar T-Systems - 03 July 2013 Bernd Schirpke - T-Systems 03/07/20131.
EPOCA – 11. June EPOCAConsortiumOrganisation.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
CLARIN work packages. Conference Place yyyy-mm-dd
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
WP8– Governance Models Jurry de la Mar T-Systems – 26 June 2014.
A public-private partnership building a multidisciplinary cloud platform for data intensive science Bob Jones Head of openlab IT dept CERN This document.
Cloud Services for Research CERN – 26 June 2014 Bob Jones (CERN) This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
WP2: Engagement and Dissemination Daniele Catteddu Cloud Security Alliance 1 This document produced by Members of the Helix Nebula Partners and Consortium.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse Technical Director CERN.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
1 ASTRONET Coordinating strategic planning for European Astronomy.
WP8– Governance Models Jurry de la Mar T-Systems - 03 July 2013 Bernd Schirpke - T-Systems 03/07/20131.
WP2 – Engagement and Dissemination HN Annual Review 1.
Helix Nebula The Science Cloud CERN – 13 June 2014 Alberto Di MEGLIO on behalf of Bob Jones (CERN) This document produced by Members of the Helix Nebula.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
WP3 – Representation of requirements This document produced by Members of the Helix Nebula consortium is licensed under a Creative Commons Attribution.
WP8– Governance Models Jurry de la Mar T-Systems – 26 June 2014.
Work Plan for the Second Period Bob Jones, CERN First Helix Nebula Review 03 July 2013 This document produced by Members of the Helix Nebula consortium.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
WP3 – Representation of requirements Robert Jenkins CEO CloudSigma 1 This document produced by Members of the Helix Nebula consortium is licensed under.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
WP8– Governance Models Bernd Schirpke / Jurry de la Mar T-Systems - 03 July 2013 Bernd Schirpke - T-Systems 03/07/20131.
ATOS in Period 2 (WP4 leader) Technical Review Period 2 Michel van Adrichem, Mick Symonds, Josep Martrat This document produced by Members of the Helix.
WP6 – Inter-operability with e- infrastructures Sergio Andreozzi Strategy and Policy Manager, EGI.eu This document produced by Members of the Helix Nebula.
EMI is partially funded by the European Commission under Grant Agreement RI NA2 : Outreach and Training Emidio Giorgio, INFN NA2 Leader 2 nd EMI.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI strategy and Grand Vision Ludek Matyska EGI Council Chair EGI InSPIRE.
WP5 – Flagship Deployment Period 1 Review Phil Evans – Logica/CGI 1.
Helix Nebula final dissemination report Daniele Catteddu Cloud Security Alliance Helix Nebula – The Science Cloud.
Interoperability and Integration of EGI with Helix Nebula - Workshop Sergio Andreozzi Strategy and Policy Manager (EGI.eu) 11/04/2013 EGI Community.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
3 nd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Sergio Andreozzi Strategy and Policy Manager, EGI.eu EGI Technical.
WP5– Flagship Deployment Phil Evans - CGI This document produced by Members of the Helix Nebula consortium is licensed under a Creative Commons Attribution.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Plans for PY2 Steven Newhouse Project Director, EGI.eu 30/05/2011 Future.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Authentication and Authorisation for Research and Collaboration Licia Florio REFEDS Meeting AARC and AARC2 Vienna, 1 st December.
Helix Nebula Workshop On Interoperability among Public And Community Clouds Session 2: Networking Connectivity Convener: Carmela ASERO, EGI.eu19 September.
Summary and next steps for the future Bob Jones, CERN Second Helix Nebula Review 26 June 2014 This document produced by Members of the Helix Nebula consortium.
WP9– Evaluation, roadmap & development plan Rupert Lueck EMBL – 26 June
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI
WP4 – Cloud Platform & Provisioning Technical Review Period 1 Michel van Adrichem, Mick Symonds, Josep Martrat Atos This document produced by Members of.
WP5 – Flagship Deployment Period 1 Review Phil Evans – Logica/CGI 1.
WP9– Evaluation, roadmap & development plan This document produced by Members of the Helix Nebula consortium is licensed under a Creative Commons Attribution.
The Helix Nebula marketplace 13 May 2015 Bob Jones, CERN.
WP6 Inter-operability with e-infrastructures Sergio Andreozzi Strategy and Policy Manager, EGI.eu 1 Helix Nebula – The Science Cloud Final review, 26 June.
EGI-InSPIRE EGI-InSPIRE RI The European Grid Infrastructure Steven Newhouse Director, EGI.eu Project Director, EGI-InSPIRE 29/06/2016CoreGrid.
Making the future happen Some remarks from the perspective of the Reykjavik-Group Chair full report:
WP6 – Inter-operability with e-Infrastructures Sergio Andreozzi - WP6 Task Leader Strategy and Policy Manager, EGI.eu Helix Nebula - 1st Year Review 1.
EGI-InSPIRE RI EGI Compute and Data Services for Open Access in H2020 Tiziana Ferrari Technical Director, EGI.eu
Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Cloudsa Wrap-up This document produced by Members of the Helix Nebula.
Work Plan for the Second Period Bob Jones, CERN First Helix Nebula Review 03 July This document produced by Members of the Helix Nebula consortium.
Brussels, January 16th, Overview and status of the project.
WP2 Governance Per Öster
Presentation transcript:

This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions beyond the scope of this license may be available at The Helix Nebula project is co-funded by the European Community Seventh Framework Programme (FP7/ ) under Grant Agreement no WP6 – Inter-operability with e-Infrastructures Period 1 Review Sergio Andreozzi (WP6 Task Leader) Strategy and Policy Manager, EGI.eu

WP Objectives Identifying the interoperation and integration issues between commercial cloud infrastructures and publicly owned pan-European e-infrastructures for technology and policy issues in order to define a roadmap for their integration with commercial cloud computing resources Specific goals Understanding the interoperation and integration issues around technology and policy between commercial cloud infrastructures and publicly owned e- Infrastructures: GEANT: a pan-European network for the research and education community built on a federation of European NRENs: National Research and Education Networks EGI: a pan-European federation of resource centres organised into National Grid Initiatives (NGIs) PRACE: a federation of peta-scale and high-end computing centres across Europe EUDAT: a project exploring the data services and support needed in Europe for the European Research Area Helix Nebula - The Science Cloud - WP62

Effort Contribution Lead Beneficiary: EGI.eu Person-Months per Participant ParticipantPerson- months EGI.eu13.00 TOTAL13.00 PM24PM1 WP6 Helix Nebula - The Science Cloud - WP63 Budget to support workshops Total13,000E Used3,769E

Deliverables and Milestones – Period 1 TypeNo.NameNatureDissemination level Date Delivered Deliverable6.1Interoperability requirements reports ReportPU21/05/2013 Milestone14 Kick-off meeting engaging public and commercial resource providers ReportPU12/10/2012 Milestone15 Technical Workshop ReportPU07/03/2013 Helix Nebula - The Science Cloud - WP64

Scientific/technical achievements and their impact Interoperability workshops “3 workshops each for 50 people and a core group of participants involved in the preparation of the roadmap” (from Description of Work) 1 st Workshop co-located with the EGI Technical Forum 2012 Prague (Czech Republic), 19 Sep 2012 ∼ 70 participants 2 nd Workshop co-located with the 2 nd Helix Nebula General Assembly Frascati (Italy), 16 Jan participants 3 rd Workshop planned with the EGI Technical Forum 2013, Madrid, Sep 2013 Helix Nebula - The Science Cloud - WP65

Establishment of communication channels across the different communities DANTE: joined the Helix Nebula Consortium (Oct 2012) SWITCH (Swiss NREN): joined the Helix Nebula Consortium (Jan 2013) EGI: key representatives from EGI Federated Cloud actively participating in the discussion EUDAT: Helix Nebula representatives will attend the EUDAT Conference in Oct 2013 PRACE: to be approached during the second year to understand integration scenarios between clouds and high-end HPC resources Helix Nebula - The Science Cloud - WP66 Scientific/technical achievements and their impact Communication Channels with e-Infrastructures

Helix Nebula - The Science Cloud - WP67 DANTE offering free IP connectivity in GÉANT for research traffic during the pilot phase NRENs have different commercial agreements (usually they apply a fee) Scientific/technical achievements and their impact Connecting commercial providers to the GÉANT/NRENs

Analysed and proposed three integration scenarios between commercial clouds and e-Infrastructures Initially focusing on EGI and DANTE/NRENs Framed the analysis around the European Interoperability Framework V2 Levels: Political context, legal, organisational, semantic, technical Defined 17 high-level recommendations agreed with stakeholders Drafted an initial list of actions for implementation with evaluation of feasibility based on available resources Engagement on these recommendations and actions implementation will be further developed at the 3rd WP6 workshop (Madrid, September 2013) Helix Nebula - The Science Cloud - WP68 Scientific/technical achievements and their impact Defining the Interoperability Roadmap

Identification of a test case to evaluate interoperability with EGI Federated Cloud Approach In collaboration with CERN, deploy the CMS/ATLAS flagship use case Use the same evaluation criteria adopted for deployment on commercial suppliers Helix Nebula - The Science Cloud - WP69 Scientific/technical achievements and their impact Testing the interoperability EGI Federated Cloud Task Force Launched in Sep members from 40 institutions and 13 countries Pre-production test-bed: 14 resource centres actively providing resources (900 cores, 16 TB storage) 30 active users from structural biology, linguistics, ecology, space science, software engineering

Exploitation and use of foreground Identified recommendations are relevant for policy makers e.g.: see presentation at last e-IRG workshop Identified recommendations and actions can influence strategic and technical decisions of both publicly-funded infrastructures and commercial providers e.g.: common technical standards profile, common standards for services managements in federated environments, common service catalogue Helix Nebula - The Science Cloud - WP610

Collaboration with other beneficiaries Other WP representatives attended the WP6 workshops to ensure cross-WP collaboration WP6 participated in the business model innovation workshops organised by WP7 to support the design of business models that include e-Infrastructures WP6 participated in WP8 activities to share experience in governance and contribute requirements from WP6 viewpoint Helix Nebula - The Science Cloud - WP611

Interaction with other FP7 projects, and stakeholders outside the consortium FedSM Service level management of federated infrastructure Participated in both WP6 workshops as speaker; collaboration in defining/implementing one of the recommendations e-FISCAL Cost assessment of public funding HTC/HPC infrastructures and comparison with commercial cloud offerings Participated in the first WP6 workshop as speaker, knowledge transfer in the area of cost and business models EGI-InSPIRE EGI Federated Cloud, main stakeholder at WP6 workshops from public funded infrastructures; dialogues at all level from political to technical GEANT3+ Collaboration around Software Defined Network (SDN) Information exchange about High-level framework for multi-cloud infrastructures Helix Nebula - The Science Cloud - WP612

Contribution to the dissemination of project results Co-location of two out of three WP6 Interoperability workshops with EGI Forums to maximise exposure Support to dissemination of news, events, results via social media channels Twitter, Facebook, LinkedIn Helix Nebula - The Science Cloud - WP613

Summary Successful organisation of two interoperability workshops, planned for the third Established communication channels between key players Connected two commercial providers to GÉANT/NRENs Defined key high-level recommendations and identified initial actions for implementations Defined a test case to evaluate the interoperability with EGI Good engagement with project beneficiaries and with relevant EC-funded projects Helix Nebula - The Science Cloud - WP614