MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,

Slides:



Advertisements
Similar presentations
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Advertisements

PID activities 1. Summary of work/activities since last CM in Berkeley 2. PID parallel session in Frascati 3. Topics specific to each subdetector CKOV1.
1 Progress report on Calorimeter design comparison simulations MICE detector phone conference Rikard Sandström.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
Action Who Progress made status Implement central repository for drawings -- need detector information to add to official drawing WL Progress on-going.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
1 EMCal & PID Rikard Sandström Universite de Geneve MICE collaboration meeting 26/6-05.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
1 PID, emittance and cooling measurement Rikard Sandström University of Geneva MICE Analysis phone conference.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
30 March Global Mice Particle Identification Steve Kahn 30 March 2004 Mice Collaboration Meeting.
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
1 Downstream scraping and detector sizes Rikard Sandström University of Geneva MICE collaboration meeting CERN.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Downstream transversal sizes Rikard Sandström University of Geneva MICE detector meeting.
RF background generator in G4MICE Video conference 17/ Yagmur Torun Rikard Sandström Geneva University.
Online Reconstruction Update Linda R. Coney UCR Dec 17, 2009.
M. Bonesini PID Meeting1 M. Bonesini INFN Milano MICE TOF0 construction & planning.
1 G4MICE downstream distributions G4MICE plans Rikard Sandström Universite de Geneve MICE collaboration meeting 27/6-05.
March 31, Status of the TOF, Ckov and Virtual Detector Packages in G4Mice Steve Kahn Brookhaven National Laboratory Mice Collaboration Meeting March.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
Downstream e-  identification 1. Questions raised by the Committee 2. Particle tracking in stray magnetic field 3. Cerenkov and calorimeter sizes 4. Preliminary.
1 Progress report on Calorimeter design comparison simulations MICE detector phone conference Rikard Sandström.
1Malcolm Ellis - Software Meeting - 31st May 2006 Data Challenge Requirements  First list of requirements, based on Yagmur’s document: u
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
Progress on PID studies Rikard Sandström University of Geneva MICE Analysis meeting.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
RF background simulations MICE collaboration meeting Fermilab Rikard Sandström.
Stephen KahnParticle ID Software Mice Collaboration Meeting Page 1 Particle ID Software Steve Kahn Brookhaven National Lab 27 March 2003.
27 Jun 2005S. Kahn -- Tof/Ckov Status1 Status of TOF and Ckov Sub- packages in G4Mice Steve Kahn 27 June 2005.
1 EMCal design MICE collaboration meeting Fermilab Rikard Sandström.
Diffuser Studies Chris Rogers, IC/RAL MICE VC 09 March 2005.
13 Nov 2007 Analysis PC 13 Nov Analysis PC Schedule 2007/ 08 Tuesdays alternate weeks, 16:30 – 18:00 GMT, with ad hoc exceptions 30 October  13.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
Software Status  Last Software Workshop u Held at Fermilab just before Christmas. u Completed reconstruction testing: s MICE trackers and KEK tracker.
Update Chris Rogers, Analysis PC, 13/07/06. State of the “Accelerator” Simulation Field model now fully implemented in revised MICE scheme Sanity checking.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
MICE Phase 1 Koji Yoshimura KEK June
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
MICE CMPB Alain Blondel 1 Highlights on MICE.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
Calorimeter design & simulations for Stage I Rikard Sandström University of Geneva MICE PID phone conference
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
CKOV1 design status 1. Generation of muon and pion beam files 2. PID performances with water radiator 3. Does it help with fluorocarbon FC72 ? 4. Conclusion.
This presentation will describe the state of each element in the beam line with regards to the current update being undertaken. Firstly, it will describe.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
MICE Collaboration Meeting Saturday 22nd October 2005 Malcolm Ellis
MICE Beamline PID w Aerogel Counters
MICE PID detectors & Shielding MICE CM19, RAL Oct 10, 2007
Presentation transcript:

MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo, Tortora, Torun, Wilson and more

in the PID Summary Talk at CM10 in UKPID Summary Talk at CM10 in UK the basic conclusion was that we are advancing well enough on hardware design not fast enough towards a serious G4MICE re-evaluation of PID performances We have had since one short meeting Wed Nov 24Wed Nov 24 a useful meeting of general planning on Dec 21Dec 21 a meeting of first results on Jan 26 a meeting with more results on Feb 2 a parallel session here at LBL Feb 11

In general, no major new progress from CM10 to CM11 ….. more like a few months of consolidation striving to complete another revision of our 8 th PID Chapter of the TRDPID Chapter of the TRD Striving to eliminate not negligible obsolete information & inconsistencies still remaining to make it the credible repository of PID detector data. Geometry files including PID, will be added by Yagmur in Ch. 3 (Simulation) incorporate realistic drawings of PID detectors in the general MICE layout general outside dimension of each device including external cases and supports. Wing Laa& al. tool up for final design downstream field maps files of downstream electron and muons (G4BEAM & G4MICE) and full re-evaluation of performance Implementation of TOF, CKOV I & II and MuCal in G4MICE feed PID detectors requirements to the resuming effort on DAQ & controls survey questionnaires filled for all detectors ! ! !

No change

standard definition of the apertures of the PID devices based on G4BEAM studies Longitudinal coordinates being revised and text, tables, figures updated accordingly New numbersNew numbers No change. But now implemented throughout. Apertures

Updated study on SEP04 watch out ….. we are already waiting for JUN05

TOF0 TRD Size 480x480

Cherenkov1 TRD Size 400x400

TOF1 TRD Size 480x480

Iron Shield (hole) Missed mu+ = 8, Singles=1326 Good mu+=1321 TRD Size r=250

TOF2 - X TRD Size 480x480 Missed mu+ = 5, Singles=1326 Good mu+=1321

TOF2 - Y TRD Size 480x480 Missed mu+ = 4, Singles=1326 Good mu+=1321

Cherenkov2 - r TRD Size r=400 Missed mu+ = 3, Singles=1326 Good mu+=1321

Calorimeter - X TRD Size 1200x1200 Missed mu+ = 1, Singles=1326 Good mu+=1321

Calorimeter - Y TRD Size 1200x1200 Missed mu+ = 1, Singles=1326 Good mu+=1321

A warning from Steve New plot from Don soon Adjust n?

Steve’s effort … in contact Lucien & Ghislain

Rikard

dubious … Rikard’s fresh look welcome

CKOV I ………….. Cremaldi & Summers reaparecidos

CKOV I light collection …. to be improved

CKOV I 3D

12 * 4 cm both views

8 * 6 cm both views

Measurement campaign in the spring R49998 TOF0 fine mesh R7761TOF I & II

Gregoire

CM11 : slowly lifting CM-10 bad marks TOF-0 … find a final site with moderate rates ……. < 3.8 MHz validate PMT choice (Ham 4498) CKOV-I… (almost) no news, evaluate performance TOF-I … find a final site, with moderate B-field, < K-gauss validate PMT choice (Ham 7791 fine mesh) TOF-II…establish consensus on B-shielding and active area validate PMT choice (Ham 7791 fine mesh) CKOV-II establish consensus on active area implement simulation MUCAL… establish consensus on active area debug simulation Refine evaluation of performance If modified layout and/or thickness, re-evaluate define size, evaluate performance Try to progress on digitization and controls done in progress dormant done in progress not necessary, so far done in progress progress too slow in progress progress not fast enough progress too slow resuming, new DAQ czar needed in progress

The end