Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.

Slides:



Advertisements
Similar presentations
Hydrology Rainfall - Runoff Modeling (I)
Advertisements

Hydrologic Modeling with HEC-HMS
Watersheds and the Hydrologic Cycle
Module 5: Storage Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013.
Watershed Geomorphology. Motivation Effect of water on landscape: – Whereas hydrologists are mostly concerned with the movement of water, a common task.
CHARACTERISTICS OF RUNOFF
Runoff and Streamflow P Q
Runoff Processes Daene C. McKinney
Alberta Rainfall-Runoff Analysis September, 2002.
Hydrological Modeling for Upper Chao Phraya Basin Using HEC-HMS UNDP/ADAPT Asia-Pacific First Regional Training Workshop Assessing Costs and Benefits of.
Introduction to Surface Water Hydrology and Watersheds Lecture 1 Philip B. Bedient Rice University November, 2000.
Rainfall – runoff modelling
Runoff Processes Reading: Applied Hydrology Sections 5.6 to 5.8 and Chapter 6 for Tuesday of next week.
From Topographic Maps to Digital Elevation Models Daniel Sheehan DUE Office of Educational Innovation & Technology Anne Graham MIT Libraries.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
Hydrologic Cycle and Watersheds. Hydrologic Cycle Components Precipitation Infiltration Percolation Runoff Evapotranspiration.
Floodplain Mapping using HEC-RAS and ArcView GIS Eric Tate Francisco Olivera David Maidment
Geographic Information Systems : Data Types, Sources and the ArcView Program.
Chapter One Hydrologic Principles Flashlight and globe.
Hydrologic/Watershed Modeling Glenn Tootle, P.E. Department of Civil and Environmental Engineering University of Nevada, Las Vegas
Hydrology & Water Resources Engineering
Water Systems Mrs. Bader. Water Systems In this exercise, you will learn more about what makes up a watershed, track the movement of water through the.
Use of GIS in Determination of the Probable Maximum Flood at Nuclear Plant Sites Presented by: Monica Anderson, GISP Tennessee Valley Authority Carrie.
FNR 402 – Forest Watershed Management
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
Watershed Management Water Budget, Hydrograph Analysis
DES 606 : Watershed Modeling with HEC-HMS Module 5 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Module 6: Routing Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI October 2013 Module 6 1.
HEC-HMS Simulation Adding a detention pond at the outlet
DIGITAL ELEVATION MODELING GEOG 421: DR. SHUNFU HU, SIUE Project One Steve Klaas Fall 2013.
DES 606 : Watershed Modeling with HEC-HMS Module 4 Theodore G. Cleveland, Ph.D., P.E 29 June 2011.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 1.
DES 606 : Watershed Modeling with HEC-HMS Module 8 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 16 July 2012 Lesson 5.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Map-Based Flood Hydrology and Hydraulics David R. Maidment Jan 10, 1998.
DES 606 : Watershed Modeling with HEC-HMS
Introduction to GIS. What is GIS? Geographic Information System Geographic implies of or pertaining to the surface of the earth Information implies knowledge.
Basic Hydrology & Hydraulics: DES 601 Module 1 Introduction.
 Before break, we discussed watersheds and what constitutes a watershed. How do you think water moves through a watershed?
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
Basic Hydrology: Rainfall-Runoff – I
Introduction to Urban Hydrology
Module 3: HEC-HMS Elementary Model Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 3 1.
Rainfall and Runoff Reading: Haested Section 2.4 Computing Hydrographs.
CE 3354 Engineering Hydrology Lecture 2: Surface and Groundwater Hydrologic Systems.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
Module 10: Average Rainfall Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 10 1.
Module 4: Loss Models Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI AUG 2015 Module 4 1.
Module 7: Unit Hydrograph Concepts Theodore G. Cleveland, Ph.D., P.E, M. ASCE, F. EWRI August 2015 Module 7 1.
Runoff.
CEE 3430, Engineering Hydrology David Tarboton
DES 606 : Watershed Modeling with HEC-HMS
Introduction to GIS David R. Maidment
Routing surface runoff to a basin outlet
DES 606 : Watershed Modeling with HEC-HMS
DES 606 : Watershed Modeling with HEC-HMS
Prepared by: Sulyman Khraishe Madhat Z
Approaches to Continental Scale River Flow Routing
Physical factors in the generation of runoff
INTRODUCTION TO HYDROLOGY
Watersheds.
Hydrology CIVL341.
Watersheds.
Environmental Modelling with RASTER DEMs: Hydrologic Features
Hydrology CIVL341 Introduction
Creating Watersheds and Stream Networks
Match the drainage basin terms to the correct definitions!
Presentation transcript:

Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2

Outline Hydrologic Principles Interpolation of irregular spaced data – Exercise: Interpolate an empirical hyetograph Digitizing Charts and Maps – Exercise: Delineate and measure a watershed using a digital planimeter.

Hydrologic Principles The Watershed The Hydrologic cycle – Precipitation – Losses – Runoff

Watershed The fundamental unit in surface water hydrology is the watershed. – It can be as small as a parking lot draining to an inlet, or continental sized (Bedient et al., 2008). A watershed is defined as the area on the surface of the earth that drains to a specific location. – The watershed is therefore defined both by the drainage location as well as topographic features that govern flow to that point.

Watershed Watershed physical properties are characteristics such as: – Area – Main channel length (if a main channel exists) – Slope (requires the specification of path), – Soil moisture/permeability, and similar measurable characteristics.

Watershed Watersheds also have descriptive properties such as: – %-developed – %- polluted, and so forth. These properties are certainly physical, but are called descriptive because there will be analyst interpretation in the specification of the values.

Watershed Physical properties are those things than can be measured from a topographic map. – Area, slope, length Descriptive properties are everything else. – Soil texture (and infiltration rate) – Fraction developed

Watershed An analysis or even design will likely start with watershed delineation. – Aerial imagery – Topographic map – Sewer drawings

Watershed What is the process of delineating watersheds? – Manual delineation involves drawing lines on a topographic map, and connecting the slope or ridge tops. Assuming the water will drain away from those points, the watershed is delineated by enclosing a polygon.

Watershed What is the process of delineating watersheds? – Automated delineation involves some technical skills with GIS-like databases. Digital Elevation Model (DEM) Stream network, and stream outlets. – The DEM and stream outlets can either be downloaded or constructed. If a new DEM must be constructed, consider cost-sharing with the U.S. Geological Survey to do so.

Manual delineation example in course reference CD – Topowatershed.pdf

Watershed Watershed physical and descriptive characteristics determined after delineation. – Areas and lengths Use Acrobat Pro tools to find areas and lengths on map image, convert to actual lengths using map scale. – Slopes Change in elevation along a path – Special concerns Sewers can cross topographic watershed boundaries Flat terrain – channels hard to define

Watershed Watershed physical and descriptive characteristics determined after delineation. – Descriptive characteristics Google Earth/aerial imagery can be used to define cover types and fractions. Soil maps for selected properties.

Watershed Minimal descriptions – Watershed boundary on a map Outlet Subsurface storm sewer network – Area that drains to the outlet – Main channel length Outlet to highest point in watershed

Watershed Minimal descriptions – Slope(s) – Descriptive (any or all) Soil type Fraction developed/impermeable etc.

Hydrologic Cycle Precipitation (Input) Runoff (Output) Loss

Precipitation – Rainfall (by far most important in Texas) – Snow, Sleet, Hail Meteorology – Synoptic storms – Cyclonic storms Data – NWS, local networks, SAO, NCDC (historical)

Losses – Infiltration Hortonian Loss Model Green-Ampt Loss Model NRCS Runoff Generation Model Initial Abstraction, Constant Rate Model – Evapotranspiration Thornwaithe Energy Balance Models

Transformation Transform the spatially and temporally distributed precipitation input to the outlet – Unit Hydrograph is an example of a lumped transform model

Storage and Routing Storage – Reservoirs, ponds, depressions store water and release later in time (as compared to the input) Routing – Moving water from one location to another on the watershed occurs over a path (route). – Routing develops the temporal relationship of input to the outlet from this process

Rainfall-Runoff Process Watershed –Losses –Transformation –Storage –Routing Precipitation –Meterology, Climate Runoff – Fraction of precipitation signal remaining after losses

Hydrologic Principles Watershed is fundamental unit – Area, Length, Slope, etc. Rainfall is the input function Losses and Storage are Watershed functions – Excess rainfall is fraction of rainfall signal remaining after storage and losses are satisfied – Runoff is the excess rain redistributed in time

Irregular Spaced Data Use linear interpolation to map irregular spaced data to fixed time or distance steps. – Seemingly simple task, but of immense importance. – Illustrate by example – won’t actually need to use this method until we get to historical data representation. Important point is that data need preparation outside of the modeling software!

Digitizing Maps and Charts Delineation first. Use a tool to find X-Y pairs of area of interest AND A REFERENCE area of known dimension. Describe enclosing polygon, measure its area, then scale to the reference area. Charts are similar except reference area has no meaning.

Exercise Exercise 2 – Delineate and measure a small watershed in Virginia (later we will pretend it is in Texas)

Documenting Your Work Like the prior exercise you are completing a table. As before complete the exercise and fill in the table, then print the report and hand-in.