Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1.

Slides:



Advertisements
Similar presentations
Armand Racine Consultant Chemicals Branch
Advertisements

HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
How can Parliamentarians contribute to a Positive Investment Climate? by Rainer Geiger Senior Regional Advisor, OECD 3rd Global Conference of Parliamentarians.
1 Professionalising Programme & Project Management Developing programme & project management capacities for UNDP and national counterparts External Briefing.
International Federation of Accountants International Education Standards for Professional Accountants Mark Allison, Executive Director Institute of Chartered.
Conference on Implementation and En- forcement of Environmental Legislation Session 5: Compliance and Enforcement Horst Büther, Germany Malta, October.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
Improving implementation and Enforcement 17 February 2011 Terry Shears - IMPEL Vice Chair.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
Wenxin Zhang Department of Civic Design University of Liverpool
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
 Road Safety the European Union Policy Carla Hess European Commission, Directorate General for Mobility & Transport Road.
1 LINKING THE WATER FRAMEWORK DIRECTIVE AND IPPC DIRECTIVE Main achievements Session 8 - Nature and water Malta, 03/10/2013.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Energy & Environment Report for 2008 – 2009 Ian Rowe Manager (Health, Safety & Environment)
Review of the IRI Malta, October What is an IRI? Impel review initiative Voluntary scheme for review of environmental authorities RMCEI and Doing.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
Ways for Improvement of Validity of Qualifications PHARE TVET RO2006/ Training and Advice for Further Development of the TVET.
New Challenges in Institutional Development of the National Audit Office of Lithuania Dainora Venckevičienė Chief Specialist at the Division for Legal.
EQAVET Supporting European quality assurance in Vocational Education and Training European Quality Assurance in Vocational Education and Training.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
2nd ECENA Plenary Meeting Brussels, Sept Overview of the recent IMPEL activity Hilda FARKAS IMPEL Secretariat.
EU Legislation in the field of environment – key developments in 2007 and rd ECENA Plenary Meeting 18 September 2008.
1 Reference Framework for Sustainable Cities (RFSC) Some useful functionalities for Finnish cities.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
European Commission Enterprise and Industry | | ‹#› The Lead Market Initiative and Sustainable Construction CEEC seminar, 8 May 2009 Antonio.
EU Funding opportunities : Rights, Equality and Citizenship Programme Justice Programme Jose Ortega European Commission DG Justice.
1 ASPECTS REGARDING PLANNING AND REPORTING RELATED TO RECOMMENDATION 331/2001/EC ON MINIMUM CRITERIA FOR ENVIRONMENTAL INSPECTION AND ITS IMPLEMENTATION.
Enforcing European Union Environmental Law 29 November 2013 UCC, Cork Session 2: Liam Cashman, Environment Directorate- General, European Commission: "New.
Twinning project ENEA – ENforcing Environmental Acquis César Seoánez Resident Twinning Adviser Skopje, 28 th of April, 2015 Activities and expected results.
REDIA Analysis of the environmental inspections in different Autonomous Communities of Spain Jesús Angel Ocio REDIA Committee member Córdoba, 15th April.
JRC - IRMM – 17/18 June 2008 – EAQC-WISE project workshop – Held1 The EAQC-WISE blueprint: Recommendations for a quality control system for chemical monitoring.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
Republic of Serbia BENCHMARKING AND SETTING ENVIRONMENTAL COMPLIANCE AND ENFORCEMENT INDICATORS Ministry of Science and Environmental Protection Directorate.
1IMPEL Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IMPEL European Network for the Implementation and Enforcement.
EU Projects – FP7 Workshop 6: EU Funding –What’s Next? Carolina Fernandes Innovation & Funding Manager GLE Group.
Air Quality Governance in the ENPI East Countries Capacity building for decision makers for small businesses regulation Monika P ř ibylová.
Teaching at the University of Luxembourg: Organization, quality assurance and evaluation of student achievements
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
1 The Future Role of the Food and Veterinary Office M.C. Gaynor, Director, FVO EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate.
Guidelines for LDS preparation for Croatian LAG’s Estonian Leader Union Kadri Tillemann and Kristiina Timmo 28 th of September, Zagreb.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Session 3: Compliance and Enforcement The IMPEL Project easyTools
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 Inspection and enforcement approach Pavel Šremer Vedoucí projektu.
Bjørn Bauer Manager of PlanMiljø Danish Inspection Guidelines IMPEL Management Reference Book AC IMPEL Project – Training and institutional analyses Support.
The current legal situation
Make it Work Conference Regulatory Insights, Experiences and Enlightenment - making regulation work for our Environment Edinburgh, December 2015.
Departement IBGE - BIM 1 Impel Copenhagen 8+9/09/2005 Brussels Institute for the Management of the Environment Jean-Pierre Janssens Director Head of division.
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
 ROAD SAFETY: the European Union Policy European Commission, Directorate General for Mobility & Transport «Road Safety.
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
"The role of Rural Networks as effective tools to promote rural development" TAIEX/Local Administration Facility Seminar on Rural Development Brussels,
Project planning The systems life cycle.
STRATEGY BUILDING HARM BORGERS
Arancha Oviedo EQAVET Secretariat
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 IMPEL European Network for the Implementation and Enforcement.
The role of IMPEL in promoting the implementation and enforcement of European environmental law Giuseppe Sgorbati & Michael Nicholson IMPEL
Commission Action Plan on Environmental Compliance and Governance
Helene Skikos DG Education and Culture
IPPC Review Stakeholder Hearing
DG Environment, Unit D.2 Marine Environment and Water Industry
Commission proposal for a new LIFE Regulation CGBN meeting
WFD CIS Working Group Meeting Brussels, 4/4/2019
Presentation transcript:

Joint European Commission – IMPEL Seminar on Environmental Inspections Wednesday 17 November 2010 Hotel Le Meredien, Brussels 1

Presentation by Isabel Santana Co-Chair IMPEL Cluster Improving Permitting, Inspection & Enforcement Some key IMPEL Projects on environmental inspections, an overview 2

Content of this presentation Previous IMPEL projects on the review/revision of IPPC and RMCEI RMCEI and Doing the right things (DTRT) Overview of some IMPEL projects related to inspections EasyTool project Setting Targets project proposal Neighbourhood Dialogue project IMPEL Review Initiative (IRI) programme 3

Previous IMPEL projects on the review/revision of IPPC and RMCEI Review of Compliance promotion, Inspections practices, and Enforcement for IPPC installations Practicability and Enforceability of the IPPC Recast Proposal IMPEL’s input to the further development of the RMCEI 4

RMCEI and Doing the Right Things

1.Planning inspection plan 1.Planning inspection plan 2.Execution routine inspections non-routine inspections investigations 2.Execution routine inspections non-routine inspections investigations 3.Reporting reporting on site visits keeping records 3.Reporting reporting on site visits keeping records 4.Evaluation reporting to EU/ Commission evaluation inspection plan 4.Evaluation reporting to EU/ Commission evaluation inspection plan EU Recommendation Minimum Criteria for Environmental Inspections 6

3.Reporting reporting on site visits keeping records 3.Reporting reporting on site visits keeping records 1.Planning inspection plan 1.Planning inspection plan 2.Execution routine inspections non-routine inspections investigations 2.Execution routine inspections non-routine inspections investigations 4.Evaluation reporting to EU/ Commission evaluation inspection plan 4.Evaluation reporting to EU/ Commission evaluation inspection plan 3.Execution and Reporting 2.Execution framework 1.Planning 4.Performance monitoring ENVIRONMENTAL INSPECTION CYCLE Doing The Right Things 7

3. Execution and Reporting 4. Performance monitoring 2. Execution Framework 1. Planning 2.Execution framework 3.Execution and Reporting 4.Performance monitoring ENVIRONMENTAL INSPECTION CYCLE 8

9 1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework ENVIRONMENTAL INSPECTION CYCLE

Overview of some IMPEL projects related to inspections 10

1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework DOING THE RIGHT THINGS Practicability & Enforceability Assessments IMPEL Review Initiative IMPEL PROJECTS related to inspections Neighbourhood Dialogue Enforcement Strategies Use of company compliance management systems Setting targets and monitoring performance Tools to assess performance of environmental inspectorates Management Reference Book Reporting to the public Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 2 Qualification & Training Comparison Programme Fines Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 1 EasyTool Inspect-Cem- Inspectan 11

Aim: Development of an easy and flexible risk assessment tool as a part of the planning of environmental inspections linked to European environmental law and the RMCEI 12 EasyTools

13 Through: Evaluation of existing tools and criteria Definition of mathematical algorithm Development of scoring and classification system Defining a standard set of risk criteria Development of an interactive IT tool Development of a guidance book Testing of the easyTool

EasyTools Characteristics of EasyTool The tool works with a set of rules Risk criteria are divided in: Impact criteria (e.g. air pollution) Operator Performance (e.g. compliance, EMS) Output: Range of risks categories (1 to 5) and Frequency of inspections and Indication of the complexity of the inspection Data of the assessment remains at the servers of Inspecting authorities 14

1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework DOING THE RIGHT THINGS Practicability & Enforceability Assessments IMPEL Review Initiative IMPEL PROJECTS related to inspections Neighbourhood Dialogue Enforcement Strategies Use of company compliance management systems Setting targets and monitoring performance Tools to assess performance of environmental inspectorates Management Reference Book Reporting to the public Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 2 Qualification & Training Comparison Programme Fines Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 1 EasyTool Inspect-Cem- Inspectan 15

Setting Targets project proposal Aim: To develop a practical guidance tool, within the framework of the DTRT Guidance Book, to help authorities set inspection targets and monitor their performance against these targets 16

Setting Targets project proposal Through identifying good practices on: Developing SMART inspection targets Setting workable performance Indicators Organising Inspection programmes and data collection 17

1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework DOING THE RIGHT THINGS Practicability & Enforceability Assessments IMPEL Review Initiative IMPEL PROJECTS related to inspections Neighbourhood Dialogue Enforcement Strategies Use of company compliance management systems Setting targets and monitoring performance Tools to assess performance of environmental inspectorates Management Reference Book Reporting to the public Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 2 Qualification & Training Comparison Programme Fines Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 1 EasyTool Inspect-Cem- Inspectan 18

Neighbourhood Dialogue Aim: Voluntary long-term communication instrument to solve environmental problems and conflicts between industrial sites and their neighbours. Complementary means to address environmental problems and to improve enforcement. Neighourhood dialogues prevent, manage and resolve conflicts effectively and efficiently by building up trust, by looking for win-win solutions and by creating sustainable good neighbourhood relations. 19

Neighbourhood Dialogue Through: Toolkit developed for authorities and companies on how to establish a neighbourhood dialogue. Toolkit contains detailed information on when, why and how to use neighbourhood dialogues. Self-evaluation guideline developed to assess the quality of dialogues (during and at the end of the process). Step-by-step instructions of the toolkit and the guidelines. 20

1. Planning 4. Performance monitoring 1b. Setting priorities 1c. Defining objectives and strategies 1d. Planning and review 1a. Describing the context 3. Execution and Reporting 2. Execution Framework DOING THE RIGHT THINGS Practicability & Enforceability Assessments IMPEL Review Initiative IMPEL PROJECTS related to inspections Neighbourhood Dialogue Enforcement Strategies Use of company compliance management systems Setting targets and monitoring performance Tools to assess performance of environmental inspectorates Management Reference Book Reporting to the public Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 2 Qualification & Training Comparison Programme Fines Energy efficiency in permits WFD – IPPC IPPC Pig Farming Air Quality Phase 1 EasyTool Inspect-Cem- Inspectan 21

The IMPEL Review Initiative (IRI) A voluntary scheme providing for informal reviews of environmental authorities in IMPEL Member countries Set up to implement the RMCEI, where it states: “Member States should assist each other administratively in operating this Recommendation. The establishment by Member States in cooperation with IMPEL of reporting and advice schemes relating to inspectorates and inspection procedures would help to promote best practice across the Community.” 22

The IMPEL Review Initiative (IRI) Offering an organisation inexpensive, fast and professional advise on their structure, operation or performance An authority can choose the precise scope of the review in accordance with its specific needs A review highlights good practices as well as areas for improvement Other authorities can learn from the findings of a review and Review Team members can broaden and deepen their knowledge 23

24 The IMPEL Review Initiative (IRI)

25 Thank you for your attention!