APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
The Free Market, Environmental Stewardship, and Rule of Law Lecture 1 of 3: Background Facts on Water as a Resource.
Designing More Contractor- Friendly Storm Water Pollution Prevention Plans April 6, 2005 Joan M. Meitl.
Using RMMS to Track the Implementation of Watershed-based Plans
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
What is NPDES? “National Pollutant Discharge Elimination System”
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
Clean Water Act Section 404: An O&G Perspective Andrew D. Smith SWCA Environmental Consultants.
1 Massachusetts Wetlands Regulations and the MCP Rachel Freed Mass. Department of Environmental Protection Wetlands and Waterways Program Northeast Regional.
Natural Resource Reviews Threatened or Endangered Species Natural AreasWetlands.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Design for Water Quality CE 365K Hydraulic Engineering Design Spring 2015 David R. Maidment.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
Christine Krall, SW Region Environmental Winter 2015.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Module 7: Construction Phase
Chanhassen’s 2006 Surface Water Management Plan Carver County WENR Meeting March 27, 2007 Lori Haak Water Resources Coordinator
Introduction to Construction General Permit Inspections.
Tier II: Module 1C CERCLA 128(a): Tribal Response Program.
Carrin Williams.  Purity of Waters Act  To assure supplies of clean drinking water  Clean Streams Law  To protect the streams from pollution.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Module 6: Design Process Preliminary Field Review Preliminary Erosion and Sediment Control Design Report, including Preliminary NOI Package Alignment and.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
Construction Site Best Management Practices and the Project Design Process.
IMPLEMENTATION TOOLS FOR WATER QUALITY REGULATION Module 22, part b – Implementation Tools.
Stormwater Control & Design
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Overview of the 401 WQC Process. Main Topics Relationship between Clean Water Act Sections 404 and 401 State permitting processes Specifics of Kentucky’s.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
USDA Natural Resources Conservation Service “Helping people help the land"
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Bureau of Watershed Management Regulatory Proposal Chapter 102 [Erosion and Sediment Control] Erosion, Sediment and Stormwater Management February 21,
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Erosion and Sediment Control Overview MPCA NPDES Construction Stormwater Permit Engineering Day, 4/16/2012 Br 862, CSAH 16 over East Swan River.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Pollution Control: For Field Office Construction Sites.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
Supervisor, RIDEM RIPDES Permitting Program
TPDES Construction Management at the City of Laredo
John Tinger U.S. EPA Region IX
INDOT Storm Water Management
Presentation transcript:

APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications

Developed by: Desotelle Updated: U6-m22c-s2 Objectives Students will be able to:  evaluate examples of land alternations to determine necessary permits based on current regulations.  describe the major aspects of the Storm Water Pollution Prevention Plan.  Evaluate measures used for development on wetland areas.  describe the roles of the Army Corps of Engineers and the EPA in managing Section 404.  define source water.  describe methods used to assess source water.

Developed by: Desotelle Updated: U6-m22c-s3 Applications of water quality regulations  Construction site  NPDES (section 402) Program (regulation)  Wetland alteration  Sections 401 and 404 (regulation)  Source Water Assessment  State revolving loan program (incentive) MN Erosion Control Assoc. Desotelle Consulting PLC Desotelle Consulting Plc

Developed by: Desotelle Updated: U6-m22c-s4 Construction site  A construction contractor has just won a bid to build 16 homes on a 160-acre parcel.  Under the Clean Water Act, what permit(s) do you need? CR Planning, Inc.

Developed by: Desotelle Updated: U6-m22c-s5 NPDES Construction General Permit (CGP)  Does your construction project disturb one or more acres of land?  If yes, you will need to submit an application called a Notice of Intent (NOI).

Developed by: Desotelle Updated: U6-m22c-s6 Stormwater Pollution Prevent Plan (SWPPP)  You are required to develop and implement a SWPPP and maintain all best management practices (BMPs) during each stage of the project.  BMPs are the techniques (buffers, silt fences, detention ponds, swales, etc.), schedules of activities, prohibitions of practices, and maintenance procedures to prevent or reduce the discharge of pollutants.

Developed by: Desotelle Updated: U6-m22c-s7 SWPPP components 1. Minimize area to be disturbed 2. Protect waterways and stabilize drainageways 3. Phase construction activities 4. Stabilize exposed soils immediately 5. Avoid steep slopes MN Erosion Control Assoc.

Developed by: Desotelle Updated: U6-m22c-s8 Basic SWPPP principles  Divert stormwater away from disturbed areas.  Install BMPs to  control erosion and sediment  manage stormwater  Inspect the site regularly  Revise the SWPPP as conditions change  Minimize exposure of bare soils  Keep the construction site clean MN Erosion Control Assoc.

Developed by: Desotelle Updated: U6-m22c-s9 Follow SWPPP until project complete  Inspect and maintain BMPs regularly.  Keep records of your maintenance activities and any modifications for review during inspection.  File an electronic Notice of Termination when project is complete. MN Erosion Control Assoc.

Developed by: Desotelle Updated: U6-m22c-s10 Doing it right vs doing it wrong! MN Erosion Control Assoc.

Developed by: Desotelle Updated: U6-m22c-s11 Doing it right vs doing it wrong! MN Erosion Control Assoc.

Developed by: Desotelle Updated: U6-m22c-s12 Write a NOI for the site  Fill out a NOI by creating a scenario based on this diagram.  Notice the detail needed, and this does not include writing a SWPPP. CR Planning, Inc.

Developed by: Desotelle Updated: U6-m22c-s13 NOI Form

Developed by: Desotelle Updated: U6-m22c-s14 Site to be developed Site with wetlands delineated Wetland alteration Desotelle Consulting Plc

Developed by: Desotelle Updated: U6-m22c-s15 Corps of engineers jurisdiction

Developed by: Desotelle Updated: U6-m22c-s16 Avoidance  Avoid adverse impacts  Are there practicable alternatives?  Avoiding wetlands may limit number of lots or the lot size Desotelle Consulting Plc

Developed by: Desotelle Updated: U6-m22c-s17 Minimization  If impacts cannot be avoided, appropriate and practicable steps to minimize adverse impacts must be taken.  How can you minimized impacts? Desotelle Consulting Plc

Developed by: Desotelle Updated: U6-m22c-s18 Desotelle Consulting Plc  Appropriate and practicable compensatory mitigation is required for unavoidable adverse impacts which remain.  How much area is impacted?  Develop restoration plan for areas filled.  mitigation Area  fill locations Compensation

Developed by: Desotelle Updated: U6-m22c-s19 Section 404 permit authority  Army Corps of Engineers  administers the day-to-day program, including individual permit decisions and jurisdictional determinations.  develops policy and guidance.  enforces Section 404 provisions.  Environmental Protection Agency  develops and interprets environmental criteria used in evaluating permit applications.  determines scope of geographic jurisdiction.  approves and oversees State administered programs.  identifies activities that are exempt.  reviews/comments on individual permit applications.  has authority to veto the Corps' permit decisions (Section 404[c]).  can elevate specific cases (Section 404[q]).  enforces Section 404 provisions.

Developed by: Desotelle Updated: U6-m22c-s20 What about section 401?  Does water quality certification (section 401) add another layer of bureaucracy or cause delays?  It shouldn't.  Allows states to take a more active role in wetland decisions. Courtesy of Dane County, WI

Developed by: Desotelle Updated: U6-m22c-s21 Source Water Assessment Well distance to potential source from the MN Well Code.

Developed by: Desotelle Updated: U6-m22c-s22 What is source water?  Untreated water from streams, rivers, lakes, or underground aquifers which is used to supply private wells and public drinking water.  Preventing drinking water contamination at the source makes good public health, economic, and environmental sense.

Developed by: Desotelle Updated: U6-m22c-s23 What regulation helps protect drinking water in your community? Pumping water from a well draws the water table down and can pull in contaminants from the well’s area of influence.

Developed by: Desotelle Updated: U6-m22c-s24 Safe Drinking Water Act  Focus on source water protection Safe Drinking Water Act Amendments  Source Water Assessment Programs (SWAPs) assess areas serving as sources of drinking water  identifies potential threats  initiates protection efforts

Developed by: Desotelle Updated: U6-m22c-s25 Safe Drinking Water State Revolving Fund  For source water assessments and protection measures  For a mixture of source water related local assistance activities

Developed by: Desotelle Updated: U6-m22c-s26 What is in a source water assessment? 1. Delineate the source water assessment area 2. Conduct an inventory of potential sources of contamination 3. Determine the susceptibility of the water supply to those contamination sources 4. Release the results to the public

Developed by: Desotelle Updated: U6-m22c-s27 References  EPA Wetlands  U.S. Army Corps of Engineers – Section 404 permit application. /reg/ENG4345.pdf  EPS Source Water Assessments tml