Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.

Slides:



Advertisements
Similar presentations
NDVCS measurement with BoNuS RTPC M. Osipenko December 2, 2009, CLAS12 Central Detector Collaboration meeting.
Advertisements

CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Quartz Plate Calorimeter Prototype Ugur Akgun The University of Iowa APS April 2006 Meeting Dallas, Texas.
HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Status of CLAS12 PCAL project
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.
CLAS12 Pre-shower S. Stepanyan (JLAB) Collaborating institutions: YerPhI, JMU, OU, NSU, W&M, Orsay-IPN, JLAB Project overview CLAS12 TWG meeting, February.
1 Tianchi Zhao University of Washington Concept of an Active Absorber Calorimeter A Summary of LCRD 2006 Proposal A Calorimeter Based on Scintillator and.
CLAS12 Pre-shower Calorimeter (PCAL) project Fall of 2010 to fall of 2014, a lot of person-hours S. Stepanyan (JLAB) Hall-B Meeting, March 24, 2014.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
A Reconstruction Algorithm for a RICH detector for CLAS12 Ahmed El Alaoui RICH Workchop, Jefferson Lab, newport News, VA November th 2011.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
J.S. Suh The Second Korean ILC Workshop Plastic Scintillator Detector for ILC Jun-Suhk Suh KNU/CHEP.
Status of Projectile Spectator Detector A.Kurepin (Institute for Nuclear Research, Moscow) I. Introduction to PSD. II. Conception and design. III. Development.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Study of Sampling Fractions Shin-Shan Yu, A P, Hans Wenzel, October 18, 2006.
CALORIMETER system for the CBM detector Ivan Korolko (ITEP Moscow) CBM Collaboration meeting, October 2004.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
V.Dzhordzhadze1 Nosecone Calorimeter Simulation Vasily Dzhordzhadze University of Tennessee Muon Physics and Forward Upgrades Workshop Santa Fe, June 22,
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting Rutherford Appleton Lab Tuesday 25 th April 2006 M. Ellis.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
ECAL PID1 Particle identification in ECAL Yuri Kharlov, Alexander Artamonov IHEP, Protvino CBM collaboration meeting
CLAS12 forward detector: Pre-shower S. Stepanyan (JLAB) Collaborating institutions: YerPhI, JMU, OU, NSU, Orsay-IPN Concept, R&D, PED … CLAS12 Detector.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
MAMUD Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, March 29, 2005 Purpose:  Provide pion – muon separation.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Simulations of Light Collection Efficiency (JLab Hall C 12 GeV Kaon Aerogel Detector) Laura Rothgeb Nuclear Physics Group Catholic University of America.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
SPHENIX EMCAL R&D Craig Woody BNL sPHENIX Design Study Meeting September 7, 2011.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
CLAS12 – CND PARAMETERDESIGN VALUE Detector typeBarrel of scintillators Angular coverage40 o to 120 o Number of radial layers3 Number of azimuthal segments48.
Edouard Kistenev for the PHENIX Collaboration Calorimetry based upgrade to PHENIX at RHIC CALOR 2012 Santa Fe, NM, June 4-8, 2012.
CLAS12 Pre-shower H. Voskanyan (YerPhI)  R&D: Test measurements  Prototype CLAS Collaboration, CLAS12 TWG Meeting February 28, 2007, JLAB.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Electromagnetic Calorimeter for HADES at SIS100 Pavel Tlustý, NPI Řež Motivation Plans Current status Tests Outlook HADES Collaboration Meeting, Sesimbra,
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
The PSD at Pb-Pb run PSD drawbacks at Ar beam
The ATLAS Zero Degree Calorimeter Brookhaven National Laboratory, USA
Panagiotis Kokkas Univ. of Ioannina
Detection of muons at 150 GeV/c with a CMS Preshower Prototype
Central detector for CLAS12: CTOF and Neutron detector
IFR detector mechanics
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Electromagnetic Calorimeter for the CLAS12 Forward Detector
CLAS12 Forward Detector Element PCAL
Tail-Catcher/Muon Tracker Prototype
Chris Smith California Institute of Technology EPS Conference 2003
General Introduction to IFR
Presentation transcript:

Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison University Ohio University Norfolk State University Orsay-IPN (France) Jefferson Lab 12 GeV IPR Lehman Review, April 26-29, 2007, JLAB

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Proposal for the CLAS12 calorimetery Install a pre-shower calorimeter in front of the existing EC, with full coverage of the EC acceptance Basic structure - similar to the CLAS EC: –lead-scintillator sandwich –about 5-6 radiation lengths thick –three stereo readout planes –finer transverse segmentation of readout planes than in EC Light transport from scintillator to a photo-detector via green wave-shifting fibers, embedded in the grooves on the surface of the scintillator strips The main requirements for the pre-shower are: –high detection efficiency for showering particles (e,  ) –good accuracy for electromagnetic shower energy reconstruction –separation of two photon clusters from high energy (~10 GeV)  0 decay Adding more scintillator layers will increase neutron detection efficiency

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB GEANT simulation of the PCAL N. Dashyan (YerPhI), K. Whitlow (SULI) Goals :  establish design parameters of PCAL  determine characteristics of electromagnetic shower and  0 ’  reconstruction in the CLAS12 forward electromagnetic calorimeter Tools:  GEANT simulation package for the CLAS detector, GSIM, with PCAL positioned in front of EC  CLAS event reconstruction package, RECSIS. Modified EC package for cluster reconstruction

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Pre-shower in GSIM The pre-shower (PCAL) was inserted in front of EC Internal geometry of the PCAL:  alternating layers of scintillators and lead  10 mm thick scintillator, 2.2 mm thick lead  triangular shape layers to match the geometry of the EC  three stereo readout views (U, V, and W) In the initial simulations:  15 layers of scintillators (5 per view) and 14 layers of lead  the whole stack was sandwiched between two end plates, constructed from composite foam and 2mm thick SS sheets  scintillator layers were sliced into 108 strips of equal width

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB PCAL+EC simulations (15 layers and 108 strips) Energy resolution for electrons thrown in the center of the of the calorimeter Efficiency of two photon cluster reconstruction from high energy  0 ’  decays

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Configurations with 9, 12, and 15 layers   0 reconstruction efficiency decreases at high energies for 12 and 9 layer modules – not enough radiator thickness and some of high energy photons do not convert  12 layers configuration with first 3 layers of lead with double thickness had comparable efficiency but ~10% worse energy resolution 1 module = 3 layers of scintillator-lead

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Different readout segmentations  Efficiency of reconstruction of two clusters from  0 ’  decay decreases for small number of readout segments  For  0 energies up to 10 GeV efficiency of two cluster separation is reasonably high for 4.5 cm wide segmentation Simulations with 15 layers of scintillators and 14 layer of lead

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB All single strips U-double V&W-single W-singleV-single U-single W-single, U&V-double V-single, U&W-double Readout with variable segmentation Beam

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Variable segmentation with 196PMTs/sector  Total of 86x4.5 cm wide strips in each readout view (U, V, and W)  Finer segmentation (4.5 cm) of short U strips and long V and W strips will allow to achieve desired results with smaller number of readout channels  Final number of strips per layer and arrangement of the readout will be performed after design is completed Simulations with15 layers, 4.5 cm strip width 86 single strip readout Single strip readout 66 U, 30 V, 30 W 58 U, 34 V, 34 W 50 U, 38 V, 38 W 42 U, 42 V, 42 W Two cluster reconstruction efficiency  0 momentum (GeV/c)

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Summary of simulations  Initial design parameters of the pre-shower are established using a full GEANT simulations of the CLAS12 electromagnetic calorimeter system  Proposed configuration for the pre-shower:  15 layers of the lead and scintillator, 2.2mm lead, 10mm scintillator  three stereo readout views, UVW (5 layers per readout view)  4.5 cm segmentation of the scintillator layers in the forward region for all three UVW views. In the backward region, double-strip (9 cm) readout for U view (perpendicular to the beam direction) and single- or double-strip readout for V or W  Simulations will continue -  final arrangement of the readout segmentation  photoelectron statistics  realistic attenuation of light in the fibers  integration of the PCAL+EC configuration into the CLAS12 simulation package

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Light collection system Does not require high performance scintillator strips Light gets absorbed locally and transported through fibers Low cost extruded scintillator strips with grooves made in the extrusion process can be used Technique is widely used in several large detectors (MINOS, MINERvA …) Light transport from scintillator to PMT via 1 mm diameter green wave- shifting fibers embedded in grooves on the surface of the scintillator strips

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Test setup (in the EEL) Trigger PMT XP2262 Test scintillator with grove(s) FNAL, Kharkov, ELJEN Test PMTs R7899, R6095, R1450 XP1912, XP B Test WS fibers Y11(sc-1mm, 1.5mm, 2mm; mc-1mm) BC-91A, BC-92 (1mm) Rad.Sources: 90 Sr and 207 Bi Cosmic muons with second trigger PMT 4 m long dark box with moving cart and support fixtures (Hall B engineering) Simple DAQ (CODA) – FASTBUS with LeCroy ADC

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Selection of the PCAL components Choice for the scintillator, WLS fiber, and PMT is : Fermi Lab extruded scintillators, 4.5x1 cm 2 with 3 grooves Kuraray, 1mm diameter Y11 single clad HAMAMATSU R6095 selected with 500 nm Expected photo-electron yield ~11p.e./MeV for 3 fibers (yield for EC readout from the test measurements was ~8.4p.e./MeV) Scintillator-WLSF- PMT combination with reasonably high photo-electron statistics at low cost

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB The Geometry of the PCAL Sc layers Y X yhyh ylyl  The last layer of PCAL scintillators projected from the EC will be: h U =360.3 cm, b U = cm Height for V/W h V = cm The same size layers and 4.5 cm scintillator strips – Area S= cm 2 Strip length for a layer S/4.5=14773 cm Total length for a sector 2216 meters The total length of Sc strips: meters The total length of fibers: meters (3x x5x0.2) EC PCALPCAL hUhU bUbU hVhV Design details will be discussed in D. Kashy’s presentation

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB PCAL Construction: cost and manpower

S. Stepanyan, 12 GeV IPR Lehman Review, June 26-29, 2007, JLAB Summary  Pre-shower R&D and PED are in progress  Main design parameters are established using the full GEANT simulations  Components of the PCAL (scintillator-fiber-PMT) are selected  More measurements of the light yield and the light attenuation will be done using the new extruded scintillators from Fermi Lab  Design and construction of a small prototype is in progress  Design and construction details can be worked out with building of a full scale prototype  Cost estimate for whole project is completed  Contingency and risk analysis are performed  Construction stages for the main detector are identified