ICP Tool Pack ICP Regional Coordinators’ Meeting Washington, DC May 19, 2004 Vilas Mandlekar The World Bank.

Slides:



Advertisements
Similar presentations
ASIAES Project Overview Satellite Image Network for Natural Hazard Management in ASEAN+3 region Pakorn Apaphant Geo-Informatics and Space Technology Development.
Advertisements

Tool Pack Readiness for Price Collection and Upgrades Vilas Mandlekar and Nada Hamadeh World Bank ICP Regional Coordinators Meeting 28 September 2004.
Banner Spreadsheet Budgeting LaSalle University
National Database Templates for the Biosafety Clearing-House Application (NDT-nBCH) Overview of the US nBCH Applications.
SPD Software and Bridge Nada Hamadeh ICP Regional Coordinators Meeting Washington, May 2004
ESafe Reporter V3.0 eSafe Learning and Certification Program February 2007.
Q Q Q Q Q Q Annual Average Prices Health & Education Health & Education Health & Education Construction & Equipment.
Regional Coordinators Meeting September 28-30, 2009 Washington DC Data Process, Management, and Transmission Chart, and Access Policy Nada Hamadeh Statistics.
July 11 - September FFIEC Central Data Repository Bank Enrollment.
ToolPack Milestones, Documentation, and Support Strategy Nada Hamadeh World Bank ICP Regional Coordinators Meeting 30 September 2004.
1 PerformanceSoftware Roger Bacon Science Center, Room 328 November 30, 2005 Automated Grading System for Microsoft Excel - Preliminary Design -
Martin Y. Leveille Sharepoint Engineer RJB Technical Consulting, Inc. Installation and Configuration Methodology.
1 of 3 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
Module 6 Windows 2000 Professional 6.1 Installation 6.2 Administration/User Interface 6.3 User Accounts 6.4 Managing the File System 6.5 Services.
ICP 2011 Regional Coordinators Meeting Chellam Palanyandy, ADB September 2009 Washington, DC.
Module 2: Planning to Install SQL Server. Overview Hardware Installation Considerations SQL Server 2000 Editions Software Installation Considerations.
Microsoft Office 2013 ®® Appendix A Introduction to Cloud Computing.
11-01: Get Started with SCP Supply Chain Platform Training Presentation Updated April 2009.
SmartLog X 3 TEAM Basic SmartLog X 3 TEAM Basic DescoEMIT.com USER STATUS USER EDIT TEST LOG ADMIN TEST MACHINE SCHEDULE INSTALL System Requirements:
Chapter-4 Windows 2000 Professional Win2K Professional provides a very usable interface and was designed for use in the desktop PC. Microsoft server system.
Training Course 2 User Module Training Course 3 Data Administration Module Session 1 Orientation Session 2 User Interface Session 3 Database Administration.
Statistical Databases: A short review Slide: 1 Demonstration of the Prototype model for ECA Statistical Database Statistical Database Application March.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
Tutorial 11 Installing, Updating, and Configuring Software
Module 4: Add Client Computers and Devices to the Network.
Data Management Seminar, 8-11th July 2008, Hamburg ICCS 2009 Main Survey Field Operations.
One-To-One Instruction How to install MS Exchange with a two user setup on Windows Server 2003.
ICP Kit 2011 HHC Data Entry Module The World Bank ICP Kit Training African Development Bank.
Status, Data Transfer and Processing Vilas Mandlekar, Nada Hamadeh and Yuri Dikhanov ICP Regional Coordinators Meeting 7-11 March 2005, Washington DC ICP.
CIM6400 CTNW (04/05) 1 CIM6400 CTNW Lesson 6 – More on Windows 2000.
Module 13: Maintaining Software by Using Windows Server Update Services.
Network Management Tool Amy Auburger. 2 Product Overview Made by Ipswitch Affordable alternative to expensive & complicated Network Management Systems.
Installing Windows Vista Lesson 2. Skills Matrix Technology SkillObjective DomainObjective # Performing a Clean Installation Set up Windows Vista as the.

ICP Tool Pack Vilas Mandlekar, Nada Hamadeh, Yuri Dikhanov World Bank ICP Regional Coordinators’ Meeting September, 2005.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
ServerProtect 5.58 for NT Tech Support Dep.. Table of Contents Introduction and Installation Managing ServerProtect Configuring ServerProtect Maintaining.
Tool Pack: Readiness for Price Collection, and Upgrades Vilas Mandlekar Nada Hamadeh World Bank ICP Regional Coordinators’ Meeting September 28, 2004.
National Workshop on ANSN Capacity Building IT modules OAP, Thailand 25 th – 27 th June 2013 KUNJEER Sameer B Briefing on centralized ANSN website.
ICP - Translation Tasks ICP Regional Coordinators Meeting,Tunis, November 17-21, 2003 Vilas Mandlekar The World Bank.
3rd NRC Meeting, 9-12 June 2008, Windsor 1 Data Management Procedures Michael Jung, IEA Data Processing and Research Center.
International Comparison Program Regional Coordinator Workshop Washington, DC May 17-21, 2004.
ICP REGIONAL COORDINATORS’ MEETING 7-11 March 2005 Washington, D.C., USA ICP ASIA PACIFIC Regional Report.
The Price Index Processor System PIPS Niall O’Hanlon.
Jeny Carrasco and Jai Nayar English 393 Process Manual Assignment 12/08/04 McAfee 7.1 Process Manual.
1st NRC Meeting, October 2006, Amsterdam 1 Data Management Procedures Preview of software used in ICCS Michael Jung, IEA Data Processing Center.
Electronic data collection System in CSB of Latvia By Karlis Zeila, Vice President, CSB of Latvia IT DG meeting, October , Eurostat.
FP6 IT System 1 ELECTRONIC PROPOSAL SUBMISSION SYSTEM.
SMS Software Distribution. Overview  Explaining How SMS Distributes Software  Managing Distribution Points  Configuring Software Distribution and the.
LINCPlus Overview Complete binding preparation module includes features such as security, titles database, reports and job costing options. Integrated.
UNSD-UNESCAP Regional Workshop on Census Data Processing: Contemporary technologies for data capture, methodology and practice of data editing, documentation.
ICP Tool Pack ICP Regional Coordinators’ Meeting Washington, DC May 19, 2004 Vilas Mandlekar The World Bank.
ICP Tool Pack ICP Regional Coordinators Meeting,Tunis, November 17-21, 2003 Vilas Mandlekar The World Bank.
11 IMPLEMENTING AND MANAGING SOFTWARE UPDATE SERVICES Chapter 7.
Linux Operations and Administration
© 2012 The McGraw-Hill Companies, Inc. All rights reserved. 1 Third Edition Chapter 6 Today’s Windows Windows Vista and Windows 7 McGraw-Hill.
…the basics…. Wildland Fire Information and Technology Server Requirements ● Windows 7 Professional or Windows 2003/2008 Server ● Windows 8/10 (discussion)
1 Chapter Overview Monitoring Access to Shared Folders Creating and Sharing Local and Remote Folders Monitoring Network Users Using Offline Folders and.
2016 TELPAS Online Testing. TELPAS Assessment Management System Accessed at
Energy Statistics & Training Office Asia Pacific Energy Research Centre The APEC Energy Database Joint SPC-APEC Regional Workshop on Energy Statistics.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
UNIVERSITY MANAGEMENT SYSTEM
Component D: Activity D.3: Surveys Department EU Twinning Project.
9 Copyright © 2004, Oracle. All rights reserved. Getting Started with Oracle Migration Workbench.
TOPSpro Special Topics
ELECTRONIC PROPOSAL SUBMISSION SYSTEM
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
ToolPack Milestones, Documentation, and Support Strategy
Status, Data Transfer and Processing
Presentation transcript:

ICP Tool Pack ICP Regional Coordinators’ Meeting Washington, DC May 19, 2004 Vilas Mandlekar The World Bank

2 ICP Tool Pack Presentation Agenda Tool Pack status Testing Development schedule Translation Training Overview of Tool Pack and demo

3 ICP Tool Pack Tool Pack status - Testing Some testing already done on English version by WB ICP Global Office Dept of Statistics, Kuala Lumpur (25+ computers) International Center, Goa, India (11 computers) NSO, Delhi (2 computers)

4 ICP Tool Pack Tool Pack status - Testing Testing going on and at different stages in Statistics Canada, Ottawa African Development Bank, Tunis NSO India, Chennai and Delhi UBOS, Uganda NSO, Kuwait ABS, Canberra

5 ICP Tool Pack Tool Pack status - Testing What ’ s being tested ? Two modules of the Tool Pack - Price Administration Module (PAM) and the Price Collection Module (PCM) Software installation - PAM and PCM PAM functions -- product list upload, survey set up, product list transfer to PCM etc. PCM functions -- data entry, data editing, data checking, price data transfer to PAM for data validation etc. PAM -- data validation,

6 ICP Tool Pack Tool Pack status - Testing What ’ s the documentation prepared and available to testers ? Term-of-reference for testing including background information on the Tool Pack Installation and user manuals for PCM and PAM Step-by-step test procedure for PAM and PCM Test scripts (300 cases) for testing PCM Software (U.S. English) and documentation placed at WB FTP site for download All documentation available in English at this time

7 ICP Tool Pack Tool Pack status - Testing What are the issues thus far ? Attempting to install Tool Pack (U.S. English version) on non-English Windows operating systems. Current version of the software is NOT multilingual and is supposed to install only on “ U.S. English setting ” computers Tool Pack uses Excel and SQLServer (Microsoft products) which are language sensitive Underlying operating system services such as IIS (pre- requisite for PAM operation) not installed on the computer

8 ICP Tool Pack Tool Pack status - Testing What are the issues thus far ? (cont ’ d) Underlying operating system services component, such as COM+ required by PAM, detected as corrupted by the installation software Not following installation instructions

9 ICP Tool Pack Tool Pack status - Development schedule May Chinese language PCM and PAM being delivered to WB. Includes some of the changes proposed and agreed to in KL and Goa. Other language versions planned to be delivered over the next 3-4 weeks June Global office testing of multilingual PAM and PCM for data collection Sep/Oct PAM features to compute PPP indices to be enabled, Quaranta tables (diagnostic), national average price computations, and data transfer features to Regional coordinators

10 ICP Tool Pack Tool Pack status - Translation PAM and PCM screen labels, warning and error messages translated into French, Spanish, Chinese and Arabic PAM and PCM “ Help ” files -- not yet translated (to be done after sign off on testing) PAM and PCM installation and user manuals to be translated (to be done after sign off on testing)

11 ICP Tool Pack Tool Pack status - Training March 22-26, Training workshop in Kuala Lumpur, Malaysia for national coordinators and statisticians from 11 countries Malaysia, Singapore, Indonesia, Brunei, Thailand, Cambodia, Laos, Vietnam, Hong Kong, Taiwan (China) and Philippines March 29-April 2, 2004 Training workshop in Goa, India for nationa coordinators and statisticians from 11 countries India, China, Sri Lanka, Pakistan, Bangladesh, Bhutan, Nepal, Iran, Fiji, Maldives, Iran

12 ICP Tool Pack Overview - Price Collection and Tool pack demo Price data collection and validation processes ICP Tool Pack setup in countries Demo - Price Administration and Analysis Module (PAM) Demo - Price Collection Module (PCM)

13 ICP Tool Pack Process flow -- overall Product specification process Price survey setup Data collection and data entry Data compilation and verification Data processing, analysis and reporting

14 ICP Tool Pack Tool Pack software modules Structured product description (SPD) module Price administration and analysis module (PAM) Price collection module (PCM) Product specifications Price observationsSurvey setup

15 ICP Tool Pack Process tasks and flow -- price survey setup Outlets Create price collection assignments Products to outlets Surveys to products Price collectors to outlets Price collectors UoMs Product specifications Survey Send assignment to price collection centers SetupMapping Pref. Qty,UoM Attributes

16 ICP Tool Pack Process tasks and flow -- data collection Prepare blank data entry forms (multiple or single product) Scrutinize price observations on paper forms Price observations data entry Preliminary data verification Collect price observations Price data export to survey administrator

17 ICP Tool Pack Process tasks & flow -- compilation & verification Verify price outliers and other price anomalies Add or edit data (price observations), as required Run price averages tables Import price observations sent by data collection centers

18 ICP Tool Pack Tool Pack features PCM -- Price collection module Allows preliminary data verification after data entry for improving quality Data transfer to PAM over network or via EM Security thru Userid/Pswd Can be used for CPI

19 ICP Tool Pack Tool Pack features (cont’d) PAM -- Administration and Analysis module Set up of product lists, UoMs, outlets, price collectors and survey Data import/export from /to PCM Data verification (diagnostic) reports (Tables 1 and 2) Data export to higher level PAM Choice of price imputation methods (CPD, EKS *) Choice of price indices (Laspeyres, Fisher, GK, EKS, etc.) Quaranta tables Can be used for CPI

20 ICP Tool Pack Tool Pack set up - Global and Regional offices ICP Global Office (PAM) Region 1 (LAC) (PAM) Region 2 (AFR) (PAM) Region n (ASIA) (PAM) Ctry. 1 Admin. (PAM/PCM) Ctry. 2 Admin. (PAM/PCM) Ctry. n Admin. (PAM/PCM)

21 ICP Tool Pack Tool Pack set up in countries – scenario 1 National ICP Administrator (PAM) Price data coll. Center 1 (PCM) Price data coll. Center 2 (PCM) Price data coll. Center 3 (PCM) Price data coll. Center.. n (PCM)

22 ICP Tool Pack Tool Pack set up in countries – scenario 2 National ICP Administrator (PAM) City/District 1 (PAM) City/District 2 (PAM) City/District..n (PAM) Data Coll. Ctr 1 (PCM ) Data Coll. Ctr 1 (PCM ) Data Coll. Ctr 1 (PCM )

23 ICP Tool Pack Tool Pack set up in countries – scenario 3 National ICP Administrator (PAM and PCM) Data Coll. Ctr 1Data Coll. Ctr 3Data Coll. Ctr mData Coll. Ctr 1 Data exchange thru hard copies (paper)

24 ICP Tool Pack PCM set up at a data collection center Data Collection Center (e.g. City or regional office) PCM with DB PCM installn. 1 w/o DB PCM installn. 3 w/o DB PCM installn. n w/o DB PCM installn. 2 w/o DB PCM installation in a networked environment

25 ICP Tool Pack Technical details - Price Collection Module Software Windows 2000 Professional, XP, 2003 Microsoft Excel 2000 or higher Need “ administrator ” account to install Hardware Pentium III processor with 128MB RAM or better recommended

26 ICP Tool Pack Technical details - Price Analysis Module Software Windows 2000 Professional or Advanced Server w/ Service Pack 2, XP, 2003 Microsoft Excel 2000 or higher Internet Explorer Version 6.0 w/ latest service packs IIS 5.0 Hardware Pentium III processor with 256MB RAM or better recommended

27 ICP Tool Pack Price administration and set up demo Log-in Define locations, create outlets Define Price collector and other user profiles Define attributes (e.g. representativity) Map products to outlets Define surveys Map surveys to products, price collectors to outlets Export survey assignment to PCM

28 ICP Tool Pack Price data collection module demo Log-in Import survey product list Print blank forms for data entry Enter price data Edit data Compare data - preliminary data check Transfer data to PAM Options - passwords, user rights, settings, housekeeping, etc.

29 ICP Tool Pack Price administration module – data validation demo Log-in Import data files created by PCM Check data quality and include data in database Run diagnostic reports – Tables 1 and 2 Edit data

30 ICP Tool Pack Thank you !