Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.

Slides:



Advertisements
Similar presentations
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Advertisements

Proton Source Task Force Directorate's Meeting Tuesday, October 5 W. Pellico.
PIP Update Oct Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken Domann.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Proton Improvement Plan (FY13 PMG Q4). William Pellico, Fermilab PMG, Nov PIP FY13 Q4 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
Proton Improvement Plan (PIP) William Pellico PIP and MI 700 kW review 21 – 22 January 2015.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
PIP Update Feb 20 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Proton Improvement Plan (FY13 PMG Q1). William Pellico, Fermilab PMG, January FY13 Summary Q1 Task Summary – Highlights RFQ Injector Budget.
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Improvement Plan Bob Zwaska July 7, 2014 All-Experimenters Meeting.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Accelerator Sector Planning and Strategy Oct. 27 and 28 W. Pellico Bob Zwaska, Keith Gollwitzer, Fernanda Garcia Valery Lebedev,
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Ken.
PIP Update Oct Agenda Summary Update – Current Activities Updates/Talks: Dave Johnson – Linac Notching (laser)
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Fermilab Proton Driver and Muons David Johnson Fermilab Neutrino Factory Muon Collider Collaboration Meeting March 14, 2006.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Proton Improvement Plan William Pellico Fermilab Institutional Review June 6-9, 2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011.
Proton Improvement Plan (FY13 PMG Q3). William Pellico, Fermilab PMG, Aug PIP FY13 Q3 Summary Task Highlights Budget and Labor Review Summary.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
PIP Update April 3 rd Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
Proton Source Task Force William Pellico Mu2e Working Group Meeting (WGM) on Wednesday, Jul 21.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Protons for Neutrinos: Mid-Term and Project-X Bob Zwaska Fermilab Intensity Frontier Neutrino Working Group Meeting October 24, 2011.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011

Talk Outline Proton Source Overview Proton Source Operations and Previous Upgrades  Operational Past  Operational Current  Operational Planned Current Upgrades in progress Task Force Report & Review Proton Source Improvement Report & Effort  Report Review Systems Costs Timetable William Pellico, FRA Visiting Committee Meeting, March 14-15,

Proton Source Pre-Accelerator Linac Booster William Pellico, FRA Visiting Committee Meeting, March 14-15,

Proton Source Overview William Pellico, FRA Visiting Committee Meeting, March 14-15,

Pre - Accelerator William Pellico, FRA Visiting Committee Meeting, March 14-15, Inside H- Dome Pre-Acc Region I- Dome H-

William Pellico, FRA Visiting Committee Meeting, March 14-15, MHz Alvarez LE Accelerating Cavity 5 MW 7835 Power Amp 800 MHz Klystron High Energy Linac

Booster William Pellico, FRA Visiting Committee Meeting, March 14-15, RF Cavities Magnets (Inside) Booster Facts: 15 Hz Synchrotron 400 MeV to 8 GeV 24 Cell Lattice - Harmonic = 84 Beam Input MI-8 8 GeV

Historic Operations First 30 years of operations  Averaged about 1E19 Protons/Year  Users Fixed Target Pbar Production (Starting in 1985)  Booster Duty Cycle was much less than 1 Hz  Booster Efficiency was under 70%  Major Upgrade - Doubling Linac Energy Installation of Klystron System in 1995 William Pellico, FRA Visiting Committee Meeting, March 14-15,

Start Neutrino Program and Run II Requirements FY2000 Requested Rep rate increased by about a factor of 10 Requested Proton throughput increased by about a factor of 10 Beam quality required significant improvements  MI Slip Stacking Requirements  Booster Activation Issues  Protons for collider program Reduced Scheduled Repair/Study Periods HEP requests greater than Proton Source could deliver! William Pellico, FRA Visiting Committee Meeting, March 14-15,

Completed Proton Source Upgrades Improved Beam Quality  New Booster Correctors Orbit Control Corrected Harmonics  Removal of an extraction region Aperture restriction  Added damping  New injection region Increased Proton Throughput  Added shielding  Collimation System Controlled loss point Reduced Component Activation  Improved Low Level control – Cogging/Notching William Pellico, FRA Visiting Committee Meeting, March 14-15,

Beam Plot - Efficiency Improvements to 2010 William Pellico, FRA Visiting Committee Meeting, March 14-15, Beam Acceleration Cycle in Booster 90% Efficiency 72% Efficiency

Proton Throughput History William Pellico, FRA Visiting Committee Meeting, March 14-15, Record Year FY10 6.1E20

Current Proton Source Projects Pre-Accelerator  New RFQ injector* Linac  Linac Dump Repair  Line Power Regulation (PLC Based Controls) Booster  Short Kicker (20 ns goal )  Low Level Upgrade  Lattice and Aperture studies (Magnet Moves)  Transverse Dampers  Beam Dynamics Correction – New Correctors  Booster Solid State* * Projects included in Proton Task Force report and PIP William Pellico, FRA Visiting Committee Meeting, March 14-15,

Pre Accelerator Project  Remove Cockcroft-Waltons and 750 KeV line  Two Round Slit Magnetron H- 35 KeV Sources (June Delivery)  New Transport Line 750 KeV Radio Frequency Quadrupole (RFQ) (May Delivery) New Transport Lines LEBT Solenoids (Completed) Trims (June Delivery) MEBT New Buncher Cavity (March Delivery) New High Gradient Quadrupoles (Oct. Delivery) Scheduled Installation Shutdown William Pellico, FRA Visiting Committee Meeting, March 14-15,

Pre-Accelerator Upgrade 2009 to 2012 William Pellico, FRA Visiting Committee Meeting, March 14-15, Beam Testing End of Summer RFQ arrives by May

Proton Task Force Report (Submitted 2010) Task charge: Reliable operation for 15 years Areas of Concern  Pre-Accelerator Continue With RFQ Project  Linac Low Energy RF Drive System Low Energy DTL  Booster High Level RF Systems (Solid State and More) Combined Function Magnets Radiation/Activation  Utilities LCW Transformers and Switch Gear William Pellico, FRA Visiting Committee Meeting, March 14-15,

Proton Improvement Plan (PIP) Maintains viable and reliable operation of the Linac and Booster through  TASK FORCE REPORT Increases the Booster RF pulse repetition rate (From ~8 Hz to 15 Hz)  TASK FORCE REPORT Doubles the proton flux  “delivering 2.25E17 protons/hour (at 15 Hz) by January 1, 2016” William Pellico, FRA Visiting Committee Meeting, March 14-15, The Fermilab Associate Director for Accelerators and the Fermilab Accelerator Division Head have established a charge for developing a plan that.....

PIP - Proton Goals William Pellico, FRA Visiting Committee Meeting, March 14-15, Present Flux

PIP – Cycle Rate Goals William Pellico, FRA Visiting Committee Meeting, March 14-15, Present Rate

Proton Improvement Plan Efforts Workshop (Dec.2010)  Identify Physics Issues  Identify Personnel  Review Proton Force Task Force Report  Review Required Resources Meetings to discuss details of workshop  Working groups started to address critical issues Create project funding profile – using guidance  M&S funding  Manpower  Timetable Submitted plan to management  February 2011 William Pellico, FRA Visiting Committee Meeting, March 14-15,

PIP Summary Task M&S K$ FTEs Project Management9.0 Modulator /Drive System Only10,00049 RFQ New Booster Cavities 18, Beam physics studies etc12.0 Collimators 1, Instrumentation BRF Anode and Bias supplies & test stand 1, Controls 1, Booster Solid state systems 3, Booster LCW Booster Vacuum Linac Vacuum Power distribution 1, Booster gradient magnets TOTALS (Modulators Only)39, William Pellico, FRA Visiting Committee Meeting, March 14-15,

PIP cost profile for FY2012 and Proton Source Improvement Plan M&S Cost Profile by Calendar Quarter Fixed Cost YearQuarter PROTON SOURCE IMPROVEMENT PLAN 2011Q1700,000 Q20 Q30 Q46,200, Total6,900, Q11,200,000 Q2600,000 Q30 Q42,574, Total6,374, Q11,126,000 Q20 Q30 Q Total3,426,000 Grand Total12,400,000 William Pellico, FRA Visiting Committee Meeting, March 14-15,

Conclusion William Pellico, FRA Visiting Committee Meeting, March 14-15, The domestic accelerator High Energy Physics program for the next 15 years is dependent on the viability and vitality of the Fermilab Linac and Booster. The Fermilab Associate Director for Accelerators and the Fermilab Accelerator Division Head have established a charge for developing a plan to assure this viability and vitality. Execution of the plan requires a commitment of significant resources. It is important to move quickly and the support of FRA is essential.

Extra Slides William Pellico, FRA Visiting Committee Meeting, March 14-15,

William Pellico, FRA Visiting Committee Meeting, March 14-15,

Critical Items in PIP William Pellico, FRA Visiting Committee Meeting, March 14-15, Linac RFQ project. This program is now effectively underway, but the project might benefit from aconstructive advice from a wider group with a range of relevant experiences. Both a conceptual design review by independent experts and an internal technical design and implementation plan review are appropriate at this stage. Booster RF Solid State Program. This and the other Booster RF efforts are presently guided by one individual able to devote an inadequate fraction of his time to each. Undivided attention is required to be prepared for the 2012 shutdown. Booster RF Cavities, Tuners, Anode Supplies, and Bias Supplies. Each of these elements cries for, undivided attention for there to be any chance of supporting 12 Hz operation in The entire “Doubling the 8 GeV Beam Flux” category. This range of elements requires one dedicated and informed scientific staff person to serve as a focal point. That person shall provide the oversight and guide the planning of investigations and beam studies necessary to achieve sufficient understanding of the issues. The time scale should be such as to enable proper preparation for effective use of the 2012 shutdown. 200 MHz Linac RF Power Systems backup Plans B and C. Especially Plan C to design a “SNS- like” 400 MHz Linac compatible with the present high energy section of the Fermilab Linac should be addressed. Linac and Booster Power Distribution Equipment. Items within this category that will be replaced must be prioritized and pre-procurement activities such as specification development and installation planning need to begin in order to effectively procure the equipment in a timely manner when funds become available. Booster Spare RF Cavity Program. This effort is in immediate need of skilled mechanical technician labor.