MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

MICE Coupling Coil Testing at Fermilab MICE Collaboration Meeting Ruben Carcagno March 15, R. Carcagno - MICE CC Testing at Fermilab3/15/2012.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Spectrometer Solenoid Testing Update S. Virostek and M. Zisman Lawrence Berkeley National Laboratory MICO Meeting—RAL June 7, 2010.
Magnet and Absorber Heat Loads and Cooling with Various Small Coolers
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Water piping design.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat loads to Spectrometer Solenoid helium vessel Tapio Niinikoski Consultant to LBNL Spectrometer Solenoid Review October 25, 2010.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
Spectrometer Solenoid – Quench Analysis The LBNL version of the quench model has been further refined - Heng Pan is finishing various quench scenarios.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Magnet Issues 1/19 Nov 2013 MICE MAGNET ISSUES Brief update on –Coupling Coils (CC) –Spectrometer Solenoids (SS) Both are US responsibilities Details of.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Spectrometer Solenoid Update
Technical Summary - ANL
Quench calculations of the CBM magnet
Presentation transcript:

MICE CC Test Status Ruben Carcagno 11/06/13 1

Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across each coil segment) Completed week of September 9,

Problem Cold mass surface temperatures steady but too high! Cooling tube He temperature uniform ~4.6K – Test Stand cooling capacity adequate Heat load to cold mass too high! – Large thermal gradients to cooling tube – Calculated ~ 10W, measured ~75W Insulating vacuum was OK (10^-6 Torr), no measurable leaks 3

LBNL Thermal Model (Heng Pang) Heat Load needs to be < 15 W for coil Tmax < 5.4 T (the critical temperature at 210 A) Tc at 210 A = 5.4 K 4

Comparison with Measurements Measured cold mass surface temperatures correspond to a model uniform heat load between 40 and 80 W. Measured heat load was ~75W 5

Quench Performance First “Quench” was a very fast (~ 1 ms) voltage spike at 62.8 A Coil kept quenching at the same current with identical (slow) resistive growth – No training! Lowering the cooling tube helium temperature by 350 mK to 4.26K increased the quench current by just 3 A, with identical resistive growth Is the coil at the short sample limit? Maybe, 7.63 K is extrapolated critical T at 62 A (See TD : Barzi & Turrioni) – Highest measured cold mass surface temperature was 7.49K, most temperatures between 6 to 6.5K – There could be a coil hot spot that we are not measuring 6

Findings Decision was to start the warmup on 9/30/13, identify the source of extra heat load, fix it, and test again. Inspection of the test cryostat and heat load calculations by various experts, including discussions with LBNL about their experience with the Spectrometer Solenoid, revealed no obvious single source of extra heat load but identified several issues associated with MLI installation. Cold Mass MLI – Compressed MLI at some points, wrapping too tight in general – Possibility of trapped gasses in MLI blankets (no exposed edges, poor venting provisions), resulting in poor vacuum within the MLI blankets – MLI thermal shorts – Exposed cold sections of support rods Vacuum vessel MLI – Thermally shorted by metal grommets used to support it (came already this way with the cryostat) Possible high water vapor levels prior to cooldown – No Nitrogen pump and purge cycles 7

Cold Mass MLI Installation 8

Solutions Best solution would be to add a full coverage thermal shield to the test cryostat, but this solution is costly and long lead Calculations show that if the cold mass MLI is installed properly, it should be adequate to keep the cold mass heat load below 15 W The plan will focus in improving the MLI cold mass performance and providing some margin for installation errors by adding mechanical support thermal intercepts and increasing the number of layers 9

Plan Re-wrap cold mass MLI – Spiral wrap cold mass with no more than 5 layers at a time to avoid thermal shorts – Increase the total number of layers from 40 to 60 – Loosely wrap MLI around cold mass and supports – Provide adequate venting (e.g. open edges, good communication to insulating vacuum, stitched taping, etc.) – Install MLI on cold sections of supports – Frequent inspection by subject matter experts during MLI installation Vacuum vessel MLI – Consider applying an MLI blanket on top of the area thermally shorted by metal grommets near the vacuum vessel flange Mechanical Supports Thermal Intercept – Loop the cold helium gas return pipe around the cold mass and use it to intercept heat from each of the four mechanical supports – Keep this pipe exposed inside the cold mass MLI, so it will function as a partial thermal shield above the cold mass Insulating Vacuum Improvements – Relocate the 400 l/s turbo pump right next to the 6” pump out port. Turn off when energizing coil. – Install a Residual Gas Analyzer (RGA) and move vacuum instrumentation to a separate flange on the top plate – Conduct several cycles of Nitrogen pump and purge prior to cooldown, monitor water vapor levels with RGA Add more temperature sensors for diagnostics – At the cold mass MLI surface and at a few elevations on the vacuum vessel MLI to determine MLI effectiveness – At the warmest cold mass spot predicted by the LBNL thermal mode (between the +lead and the –lead) – At a few points in the gas return pipe to estimate heat loads intercepted by this pipe 10

Status Cold mass MLI has been removed Detailed design on the thermal intercept and cold mass MLI wrapping is proceeding – Cost and schedule will be available once detailed design is complete Expect to test again before end of the year – Trying to avoid complexity and long lead items – Trying to keep cost down Work already started on relocation of turbo pump, instrumentation, etc. Have obtained quotes from vendors (Meyer Tool, Aerospace Fabrication) for MLI installation and custom- cutting. – Expensive, long lead time – Recommend to proceed in-house New gas return pipe routing New thermal intercepts 11