LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

Particle rate in M1 and M2 Muon Meeting
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Beam-plug under M2 and HCAL shielding studies Robert Paluch, Burkhard Schmidt October 9,
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Simulation of the RPC Response José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
28 Feb 2006Digi - Paul Dauncey1 In principle change from simulation output to “raw” information equivalent to that seen in real data Not “reconstruction”,
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
Steven Blusk, Syracuse University -- 1 Update on Global Alignment Steven Blusk Syracuse University.
29 Mar 2007Tracking - Paul Dauncey1 Tracking/Alignment Status Paul Dauncey, Michele Faucci Giannelli, Mike Green, Anne-Marie Magnan, George Mavromanolakis,
Status of calorimeter simulations Mikhail Prokudin, ITEP.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
Photon reconstruction and calorimeter software Mikhail Prokudin.
The LiC Detector Toy M. Valentan, M. Regler, R. Frühwirth Austrian Academy of Sciences Institute of High Energy Physics, Vienna InputSimulation ReconstructionOutput.
Framework for track reconstruction and it’s implementation for the CMS tracker A.Khanov,T.Todorov,P.Vanlaer.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Tracking at LHCb Introduction: Tracking Performance at LHCb Kalman Filter Technique Speed Optimization Status & Plans.
Implementing a dual readout calorimeter in SLIC and testing Geant4 Physics Hans Wenzel Fermilab Friday, 2 nd October 2009 ALCPG 2009.
Spasimir Balev /CERN/ mrad 3 LKr simulation: – very slow, so only events with interesting topology are fully simulated: –  + with.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
BeamCal Simulations with Mokka Madalina Stanescu-Bellu West University Timisoara, Romania Desy, Zeuthen 30 Jun 2009 – FCAL Meeting.
File Storage Organization The majority of space on a device is reserved for the storage of files. When files are created and modified physical blocks are.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Simulation and Analysis of VTX03 and Upgrades to LASS Ryan Page.
1 Calorimeter in G4MICE Berkeley 10 Feb 2005 Rikard Sandström Geneva University.
MDC Simulation Yuan Ye BESIII Collaboration Meeting.
LHCb VErtex LOcator & Displaced Vertex Trigger
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
August 26, 2003P. Nilsson, SPD Group Meeting1 Paul Nilsson, SPD Group Meeting, August 26, 2003 Test Beam 2002 Analysis Techniques for Estimating Intrinsic.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
NA62 Gigatracker Working Group 28 July 2009 Massimiliano Fiorini CERN.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
Thomas Jefferson National Accelerator Facility Page Hall B:User Software Contributions Gerard Gilfoyle University of Richmond 12 GeV Upgrade Software Review.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
CBM ECAL simulation status Prokudin Mikhail ITEP.
Calorimeter in front of MUCh Mikhail Prokudin. Overview ► Geometry and acceptance ► Reconstruction procedure  Cluster finder algorithms  Preliminary.
Evgeny Kryshen (PNPI) Mikhail Ryzhinskiy (SPbSPU) Vladimir Nikulin (PNPI) Detailed geometry of MUCH detector in cbmroot Outline Motivation Realistic module.
Test beam preliminary results D. Di Filippo, P. Massarotti, T. Spadaro.
3D Event reconstruction in ArgoNeuT Maddalena Antonello and Ornella Palamara 11 gennaio 20161M.Antonello - INFN, LNGS.
Midwest Accelerator Physics Meeting. Indiana University, March 15-19, ORBIT Electron Cloud Model Andrei Shishlo, Yoichi Sato, Slava Danilov, Jeff.
Magnetized hadronic calorimeter and muon veto for the K +   +  experiment L. DiLella, May 25, 2004 Purpose:  Provide pion – muon separation (muon veto)
Plans to study the Readout design in the forward region June 12 th 2007 Hans Wenzel  Currently: one big sensitive silicon disks: we record the Geant 4.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Page 1 of 18 Bjorn S. Nilsen, ALICE November 16 ITS Software meeting ITS Alignment Status Plus other things By Bjørn S. Nilsen The Ohio State University.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
LAV Simulation Emanuele Leonardi INFN Roma Photon Veto meeting 08/02/2011.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
LAV efficiency studies with photons T. Spadaro* *Frascati National Laboratory of INFN.
L0 trigger update Bruno Angelucci INFN & University of Pisa.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Status of Digitization, Testbeam Simulation, and Production ATLAS Muon Week -CERN, February 18th 2005 Daniela Rebuzzi – Pavia University and INFN.
FCAL Krakow meeting, 6. May LumiCal concept including the tracker R. Ingbir, P.Růžička, V. Vrba.
Anna Kotynia.  8 stations  fully based on micro-strip detectors Tracking detector: -low-mass detector -full azimuthal angle coverage -polar angle coverage:from.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
1 GlueX Software Oct. 21, 2004 D. Lawrence, JLab.
Alignment of the ALICE MUON Spectrometer
C.Cheshkov 15/09/2005 Weekly Offline Meeting
Marian Ivanov TPC status report.
Tracking System at CERN 06 and 07 test beams
ALICE Offline Week, CERN
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Geant4 in HARP V.Ivanchenko For the HARP Collaboration
COMP755 Advanced Operating Systems
Presentation transcript:

LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24

MonteCarlo 24/03/2015E.Leonardi T.Spadaro - LAV SW Status2

Blocks positions updated to «as-built» technical design Adjusted radial positions (tangent to front face of block ) A1-A5532 mm→536.5 mm A6-A8772 mm→ mm A9-A11972 mm→ 980 mm A mm→ 1070 mm Adjusted reference ϕ˳ (center of banana 0 at layer 0) A1-A599°→98.86° A6-A899°→92.28° A9-A1199°→92.25° (A10: °, ½ banana shift) A1299°→91.125°(experimental from Tommaso) N.B. A12 technical drawings have ϕ˳ at ° 24/03/2015E.Leonardi T.Spadaro - LAV SW Status3

Fixed A12 position along Z Due to an obsolete assignment of Responsibility Regions between A12 and CHOD, A12 blocks were shifted forward in Z by 5 cm. Removed A12 fictitious steel vessel A12 blocks are now in air (were in vacuum) Updated Beam pipe design Space allocated only in A12 Use air outside Beam pipe (was vacuum) 24/03/2015E.Leonardi T.Spadaro - LAV SW Status4

Added aluminum structure to A6-A8 bananas Need final design of aluminum structure for A9-A11 A12 has a totally different aluminum structure which will require some changes to the code Minor overlaps/protrusions in A6-A8 logical volumes Front face of block 3 out of banana’s ϕ range by ~0.8mm Due to non-pointing block geometry Will be fixed with a small ϕ rotation of the banana’s mother volume (NOT of the block!) Back face of blocks overlaps by a few μm to aluminum support Due to 100μm-level approximations in aluminum slab technical drawings Need to add small tolerances in block positioning (already done for A1-A5) 24/03/2015E.Leonardi T.Spadaro - LAV SW Status5

Next steps Fix overlaps/protrusions Add A9-A11 banana support structure Add A12 special aluminum support structure Add Blue Tube in LAV Responsibility Regions Asked to do it in a general way so that other detectors can use it Add flanges in the Vessel-Blue Tube junctions Add wires and grid in the front area of each vessel Not trivial as the number of cables varies with ϕ Use an homogeneous average material with variable density? 24/03/2015E.Leonardi T.Spadaro - LAV SW Status6

DataBase 24/03/2015E.Leonardi T.Spadaro - LAV SW Status7

DB software used in the 2013 note (NA ) is obsolete Lot of work to: Get access to DB Understand the inner working Working version produced by Bob Velghe last week Not a real DB as the SQL interface is hidden from the user It canIt can not Store information in various formats (user-defined data structures) Use structured SQL queries (can only select on validity time) Keep track of validity time Store multiple instances of the same object with the same validity time 24/03/2015E.Leonardi T.Spadaro - LAV SW Status8

How we plan to use the db Given the available interface, we will: – read in memory the entire DB information needed for a specific task (MC generation, Reconstruction, Analysis) and for the current time – provide the information wanted using software methods to simulate a relational db behavior 24/03/2015E.Leonardi T.Spadaro - LAV SW Status9

Proposed LAV DB subsystems: LAV (1 instance): – MC names of the sensitive volume and hit collection LAVStationGeometry (12 instances): – parameters defining the station geometry LAVBlockType (9 instances): – parameters for the geometry of OPAL blocks LAVBananaType (4 instances): – parameters for the geometry of banana support structures LAVResponsibilityRegionGeometry (5 instances): – parameters defining the responsibility region geometry A12BeamPipeGeometry (1 instance): – beam pipe for LAV12 24/03/2015E.Leonardi T.Spadaro - LAV SW Status10

Proposed LAV db subsystems (cont): LAVStationConfiguration (12 instances): – set/readout threshold – HV – electronic channel configuration/status LAVStationCalibration (12 instances): – Global time zero – Block time zero 24/03/2015E.Leonardi T.Spadaro - LAV SW Status11

Example LAVStationGeometry (12 instances): – Attribute: DBID, UID – Attribute: Name, String – Attribute: fLAV_Station_NRings, Count – Attribute: fLAV_Station_NBananasPerRing, Count – Attribute: fLAV_TypeOfCrystal, VecType – Attribute: fLAV_Station_BananaType, Type – Attribute: fLAV_Station_ResponsibilityRegion, Count – Attribute: fLAV_Station_ZofFrontFace, Length – Attribute: fLAV_Station_ZofBackFace, Length – Attribute: fLAV_Station_InnerRadius, Length – Attribute: fLAV_Station_OuterRadius, Length – Attribute: fLAV_Vessel_OuterRadius, Length – Attribute: fLAV_Vessel_InnerRadius, Length – Attribute: fLAV_Vessel_Thickness, Length – Attribute: fLAV_Station_FirstRingZPos, Length – Attribute: fLAV_Station_RingGap, Length – Attribute: fLAV_Station_PhiReference, Angle – Attribute: fLAV_Station_PhiRotationBetweenLayers, Angle – Attribute: fWrapFrontHole, Length – Attribute: fWrapThick, Length – Attribute: fAirThick, Length – Attribute: fGlueThick, Length Pointer list to block types in each position in the station (points to LAVBlockType entries) Pointer to banana structure type used in the station (points to a LAVBananaType entry) Dependencies above must be resolved in software after reading the full tables in memory 24/03/2015E.Leonardi T.Spadaro - LAV SW Status12

Reconstruction 24/03/2015E.Leonardi T.Spadaro - LAV SW Status13

Time reconstruction now includes: T0 subtraction (offset for each station + offset for each block) Slewing correction (assuming nominal signal shape) Residual slewing correction (parameters from datafile input) T0 files for various runs produced: 1371 (7/15 mV threshold) 1373 (5/15 mV threshold) 1406 (5.5/15 mV threshold) 1348 (7/15 mV, 3 spectrometer chambers) 1520 (7/15 mV, 4 spectrometer chambers, minimum bias) A T0 file is produced for MC events, too 24/03/2015E.Leonardi T.Spadaro - LAV SW Status14

Reconstruction SW update: 2 independent clustering algorithms, grouping adjacent blocks grouping blocks close in time and in azimuthal angle (a.k.a. tracking) Cluster information updated: Centroid position Centroid position, average weighted mean using charge deposited Centroid time, average weighted mean using charge deposited Total charge Error matrix for x,y,z coordinates of the cluster centroid Doxygen documentation written To do: Commit Produce list of “good” burst for each run 24/03/2015E.Leonardi T.Spadaro - LAV SW Status15