1 Review and Assessment of the Korea Rail ’ s Safety Performance using Risk Assessment Models International Railway Safety Conference 2009, Sweden Chan-Woo.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

Slide 1 ILLINOIS - RAILROAD ENGINEERING Railroad Hazardous Materials Transportation Risk Analysis Under Uncertainty Xiang Liu, M. Rapik Saat and Christopher.
RSSB Fatigue Projects Presentation for Track Safety Alliance Staff Reps Conference 3rd February 2015 © RSSB 3 Feb 2015.
State of Safety Breakfast 2013/14 24 November 2014 Dr Cornel Malan RSR Head : Research.
Managing Safety and Health, Overview Ron Hopkins, CFPS, CFEI TRACE Fire Protection and Safety Consultants. Ltd. Richmond, Kentucky.
1 Risk-based Evaluations and Trends of Railway Casualty Accidents on the National Railway of South Korea International Railway Safety Conference 2007.
Crossings for the 21 st Century Michael Martino Senior Director Operation Association of American Railroads Standing Committee on Rail Transportation Washington,
National Rail Safety Investigations in Australia International Rail Safety Conference Vancouver – Oct 2013 Tony Simes Manager - Rail Coordinator.
Alexander Brandl ERHS 561 Emergency Response Environmental and Radiological Health Sciences.
Ken KUSUKAMI Director Safety Research Laboratory Research and Development Center of JR East Group East Japan Railway Company Development of human factors.
Performance Metrics Reporting Requirements Including Enhancements Qasim Yunus Tariq Alauddin 1.
Brief Overview of New ALCAM
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
© 2000 International Risk Control America, Inc. Risk Management Presentation — 1 International Risk Control America IRCA
Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Sweden Norway.
Dynamics with Responsibility Road Safety Priorities in Austria Dr. Eva M. Eichinger Federal Ministry for Transport, Innovation and Technology Road Directorate.
VIETNAM GENERAL CONFEDERATION OF LABOUR EFFECTIVE IMPLEMENTATION OF OSH POLICY IN AGRICULTURAL SECTOR IN VIETNAM.
1 Development and Application of Hazard Analysis & Risk Assessment Models for the Korea Railway International Railway Safety Conference 2008 Denver, Colorado.
Around the Globe Spring Road Fatalities Recent Trends (world wide) Population Motor vehicles.
Graduated Driver Licensing: Is it effective?. What Is Graduated Licensing?  Graduated Licensing is “a system designed to phase in young beginning [drivers]
Railway Safety Plan and Its Status in Korea
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.
Japan’s Efforts to Ensure Safety of Railways October 12th, 2010 Railway Bureau MLIT.
Dinesh Mohan Transportation Research & Injury Prevention Programme Indian Institute of technology Delhi Emerging Dimensions of Railway Safety.
Slide 1 ILLINOIS - RAILROAD ENGINEERING Railroad Hazardous Materials Transportation Risk Management Framework Xiang Liu, Christopher P. L. Barkan, M. Rapik.
Railtrack PLC Safety & Standards Directorate Railway Safety: Analysing Risks and Causes Sally Brearley Railtrack Safety and Standards Directorate 8 December.
Human factor, road-rail safety policies, available technologies at level crossing. Towards a model to evaluate LCs risk. Emilio Cosciotti Massimo Costa.
Title: Railway Safety Plan in Korea Name: Sanglog Kwak, Sungbae Yoon, Kwanghag Choi Organisation: MLTM, KRRI Economy: Republic of Korea Thirty Fourth APEC.
Hazard Identification
Corporate Health and Safety ArcelorMittal RS# 6 Emergencies and Incidents Draft date: Oct 5, 2011 Rev 1.
Proposed Revision to ORPS Criteria for Hazardous Electrical Energy Mike Hicks, DOE, Idaho Lloyd Gordon, LANL November 3, 2009.
Ken KUSUKAMI, Ryoichi IMATA Safety Research Laboratory
Frequency analysis and scenario development
Title: Rail Safety Survey Presenter’s Name: DAISY P. JACOBO Economy: Philippines 33rd APEC Transportation Working Group Tokyo, Japan October
1 Problem Areas in Construction Safety CH 4: Problem Areas in Construction Safety Faculty of Applied Engineering and Urban Planning Civil Engineering Department.
Scenario Based Auditing
Introduction to Workplace Safety
Supporting European Rail Accident Investigation Inter national Rail Safety Conference Sweden 29th September 2009 Dr Jane Rajan Head of sector : safety.
Around the Globe Fall 2015.
SAFETY OF TRAFFIC COMPARED TO OTHER HUMAN ACTIVITIES IN FINLAND Otto Kärki and Kirsi Pajunen Technical Research Centre of Finland (VTT)
Two of the most important pieces of the health and safety legislation affecting educational establishments across the UK are the Health and Safety at.
Public behaviour issues facing the railway industry Maurice Wilsdon Head of National Programmes, Railway Operations
INTERNATIONAL EDUCATIONAL CONFERENCE „LET‘S SAVE LIVES“ Tallinn, Estonia, March 15 th, 2011 Martina Pavlíková ŽSR – The Railways of the Slovak Republic.
Objectives Students will be able to:
Korea Pedestrian Working Group The Korea Transport Institute Economic Appraisal for Technical Regulation on Pedestrian Protection (I): focused on head.
Transport Rail Safety & the Railway Safety Directive Frank Jost Single European Rail Area EU Commission 1.
1 Federal Office of Transport, Hannes Meuli, Roman Slovák Workshop on Rail Safety: Trends and Challenges, UNECE, Geneva, Schweizerische Eidgenossenschaft.
Using functional analysis to determine the requirements for changes to critical systems: Railway level crossing case study Joe Silmon, Clive Roberts Centre.
A sustainable safety performance for railways Angelo Pira Project Officer at the European Railway Agency (ERA)
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OHS RISK ASSESSMENT PROCEDURE Title: OHS Risk Assessment Procedure Document Unique Identifier: (Revision 2) Effective date: July 2014.
HIGH SPEED RAIL ASSESSMENT NORGE
השוואת תנאי עבודת עתקים ודרישות בטיחות נעשתה בהתאם לדו"ח מבקר 3/13. ISRAEL RAIL COMPANY General Overview Udi Kaplansky (MSc. Safety Engineering) VP Safety,
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Address: UIC Safety Database (SDB) System and Results.
Health and Safety Legislation E5: Human Factors Design IB Technology.
Collision, Injury and Severity Report Fiscal Year End 2014 OPERATIONS, PLANNING, and SAFETY COMMITTEE.
DETECTION AND ASSESSMENT OF SAFETY PROBLEMS WITHIN ROAD TRANSPORT DECISION MAKING Prof. Dr. Nikolay Georgiev eng. Violina Velyova ‘Todor Kableshkov’ University.
Level Crossing Safety Management Information System
23rd International Railway Safety Conference
Guide for the application of CSM design targets (CSM DT)
An Integrated Risk Management & Safety Program: IRMSP
Track circuit reliability assessment for preventing railway accidents
Air Carrier Continuing Analysis and Surveillance System (CASS)
Quantitative Risk Assessment
U.S. Railroad Safety Statistics & Trends
MKKK 1653 SAFETY AND HEALTH IN CHEMICAL INDUSTRIES
Presentation transcript:

1 Review and Assessment of the Korea Rail ’ s Safety Performance using Risk Assessment Models International Railway Safety Conference 2009, Sweden Chan-Woo Park, Jong-Bae Wang, Sang-Log Kwak, Don-Bum Choi National Railway Safety R&D Program Office, Korea Railroad Research Institute

2 IIntroduction Contents II How do risk assessment models assess the safety performance? III Safety Performance IVConclusion

3 Background 1. Introduction Cyclic occurrence of major train accidents Cyclic occurrence of major train accidents : Daegu, subway train fire accident, 191 fatalities : Daegu, subway train fire accident, 191 fatalities : Gupo, train derailment accident, 78 fatalities : Gupo, train derailment accident, 78 fatalities : Kyongsan, train collisions, 54 fatalities : Kyongsan, train collisions, 54 fatalities Environmental changes in Korea - KTX (Korea Train eXpress) operation at Structural reform of railroad industries - Electrification of conventional lines - Preparation of TCR & TSR “Railway Safety Act” announced in Focused on the risk-based safety management - Focused on the risk-based safety management - Nation-wide railroad safety program & safety regulations - Hazard analysis, risk assessment & control

4 1. Introduction Research Objective Since Oct. 2005, KRRI has developed the common hazard analysis & risk assessment models for the Korea Railway. - Developing procedure of the risk models - Application of the developed model to the Korea railway - the Korea rail industry’s safety performance against some defined risk areas Research Objective is to introduce

5 2. How do risk assessment models assess the safety performance? Risk Assessment Procedure Railway Accident Appearance Scenarios Railway Accident Appearance Scenarios FTA Model Railway Accident Progress Scenarios Railway Accident Progress Scenarios ETA Model Casual Analysis Consequence Analysis Hazard Identification Defining the Initiating Hazardous Events Development of Accident Scenarios Risk Evaluation & Reduction HazardousEvents

6 System & Boundary Definition Typical railway system configuration proposed in SAMRAIL project According to the accident classification of “Railway Accident Report Regulation”, The scenarios were divided into the five main areas 1) Train collision accident, 2) Train derailment accident, 3) Train fire accident, 4) Level crossing accident, 5) Railway (traffic/safety) casualty accident. 2. How do risk assessment models assess the safety performance?

7 Risk Measure Method Collective Risk (Average Number of FWI/year) =Frequency (Average frequency at which the scenario sequence occurs) XConsequences (the number of FWI/scenario sequence) Risk assessment model : the form of a cause and consequence analysis : using fault trees and event trees. Injury degreeDefinitionRatio FatalityDeath occurs within 72 hours of the accident.1 Major injuryInjuries that resulted in hospital attendance for more than 3 weeks.10 Minor injuryAll other physical injuries How do risk assessment models assess the safety performance?

8 Data Population Industry safety data: safety related incidents within industry database. Incidents recorded range from train collisions to passenger burns from coffee spills Many thousands of records are reviewed and classified Where data was not available, Use was made of: - Human error probability assessments : using a revised Human Error Assessment and Reduction Technique (HEART) - Safety expert judgments from in-house expertise within Korea railway. - Statistical methods including Monte Carlo simulation and Bayesian uncertainty distributions. 2. How do risk assessment models assess the safety performance?

9 3. Safety Performance Risk Areas Public Behaviors Workforce Behaviors Passenger Behaviors Engineering Suspected Suicide Inside Station On Train Boarding/Alighting Outside Station Level Crossing Train Crew Train Driver Shunter and Signaler Station Staff Rolling Stock Engineer Infrastructure Engineer Energy/Signal Engineer Level Crossing Worker Office Worker Railway Associate Employee Irregular Employee Rolling Stock Infrastructure Equipment Suspected Suicide Regulation Violation Level Crossing Carelessness

10 3. Safety Performance Risk Profile Most of the risk is to members of the public. Passenger risk arises from a number of sources. Workforce risk arises largely from areas that are under the control of the workforce. Relatively few non-fatal public injuries are recorded. Most of the risk arises from factors being primarily the responsibility of the injured party.

11 3. Safety Performance Recent Safety Trends The risk in 2007 has been decreased by more than 55% over 2003 year. The harm to members of the workforce has been maintained at the lower levels. Fatalities and weighted injuries to members of the public decreased from year to year. Passenger-km increases 2% every year. Considering this factor, the safety performance has improved.

12 3. Safety Performance Risk Profile by Risk Areas Public Behaviors Passenger Behaviors Workforce Behaviors Engineering

13 3. Safety Performance Train Accidents Serious train accidents are rare, trends in train accident precursors were analyzed. The train accident precursors have been decreased by more than 34% over The increment of the train accident precursors in 2004 and 2005 is largely due to the introduction of the Korea Train eXpress (KTX) operation.

14 3. Safety Performance Passenger Safety Main Passenger Risk Areas

15 3. Safety Performance Main Risk Areas of the Passenger Safety Passenger Suspected Suicides Inside Station Passenger Violation & Carelessness on Train Passenger Violation & Carelessness Inside Station

16 3. Safety Performance Public Safety

17 Level Crossing 3. Safety Performance The number of level crossing had decreased from 1,657 in 2003 to 1,455 in % of level crossings has automatic protection equipments. The risk in level crossings has been decreased by more than 30% over The risk level associated with level crossings is average FWIs per year. Pedestrian risk accounts for 45% of all risk associated with level crossings. The risk caused by “road vehicle breaking through or detouring the barrier" governs the most part of the road vehicle occupant fatalities.

18 3. Safety Performance Workforce Safety Main Workforce Risk Areas

19 3. Safety Performance Trespass and Suspected Suicide Fatalities

20 3. Safety Performance F-N Curve: Annual Korea Railway F-N curve

21 3. Safety Performance Comparison Between UK's F-N Curve and Korea’s F-N Curve

22 4. Conclusion This study Developed the common risk assessment model for the Korea railway Reviewed the Korea rail industry’s safety performance against defined risk areas The risk including suspected suicides in 2007 Was FWIs Has been decreased by more than 55% over 2003 year The developed model will provide a generic model of the safety risk on the Korea railway which will Increase the industry’s knowledge of the risk from the operation and maintenance Allow the identification of areas of railway operation that need further risk controls Allow sensitivity analyses to be carried out to determine the risk reduction Allow cost benefit analysis of proposed changes

23 Thank you!