The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Status of the ATLAS MM project
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher Cross Talk issues with APV25 Electronics Uniformity.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
F. Murtas LNF/INFN 9 July 2002 GEM Chamber 20x24 cm 2 Status Report F.Murtas for the GEM group  20x24 Prototype  PSI Test Beam  Module 0 Progress 
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
GEM Detector R&D at Florida Tech – “Get to know each other” –
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
CLAS12 Drift Chamber Prototyping
Modifying the PMP (remove some GEM’s add a scintillator coordinate detector) -JJL (8/29/2012)
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
1- Handling The Olympus GEMs at MIT-BATES between June 6th-August 8th Manufacturing The GEMs at HU-GEM LAB since Sep 2010 OZGUR ATES HAMPTON UNIVERSITY.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Electronics for GEM R&D at the University of Virginia
Overview of the Frascati Production Facilities
Status of the Front Tracker GEM
EIC Tracking Meeting, March 26, 2012
Physics program in Hall A for the CEBAF 12 GeV era
Limited Streamer Tube Project Summary
TDIS mTPC update Nilanga Liyanage and Kondo Gnanvo UVa
Presentation transcript:

The Bigbite second GEM tracker

SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers with different sizes  Front tracker: Six 40 cm x 150 cm GEM layers  INFN Funding: to be built in Italy  Polarimeter trackers: Eight 50 cm x 200 cm GEM layers  to be built in Virginia 76 modules In Virginia Collaboration: INFN (Roma, Genova, Catania, Bari) and UVa SBS GEM trackers will form the largest area GEM tracker in the world

 Fabricate 29 GEM modules by Oct  Assemble and test at least one 50 cm x 200 cm GEM layer ( 5 modules) for Bigbite.  Our plan is to build 12 (of the 29) SBS modules and instrument them with APV electronics in  So it will be possible to assemble two back GEM layers for BB in time for A1n.  All costs are budgeted into SBS WBS 2; no extra cost to A1n.  Graduate students from UVa for installation and commissioning. 3 UVa component of SBS WBS 2 (Neutron FF)

 A 3.5 m x 3 m level-1000 clean-room at UVa  Clean room in a 4 m x 10 m semi-clean (1000 level) area.  Equipment to build 40 cm x 50 cm SBS modules:  GEM foil stretcher, with tension monitoring  Dry N2 HV box, with picoammeter, for testing GEM foils  Large ultra-sonic bath for cleaning frames  APV 25 readout system developed in Italy, going into production now  Two APV25 based readout systems with 5000 channels for testing GEMs: these systems being incorporated into CODA now.  Wiener MPOD High Voltage system with 16 sensitive HV channels  GEM chamber prototyping  INFN and UVa groups have built and tested seven 10 cm x 10 cm prototypes  40 cm x 50 cm module design complete, has been optimized with two prototypes.  Two 40 x 50 cm prototypes built in Italy, two more at UVa. 4 Preparations for the SBS GEM project

Prototype GEM tracker tests and results 5 10 cm x 10 cm prototype GEM tracker preared to go into hall A 70  m position resolution Charge deposition correlation between x and y stripes

GEM module construction status at UVa 6  All parts for 2 chambers now at hand:  Readout planes arrived 2 weeks ago. – 1 Rome type + 2 Uva type  Spent about 2 months developing techniques for GEM assembly  Used test frames and foils  Final procedure well established now.  Final assembly of the first chamber (Uva type) this week and next week  Readout and 2 GEMs already glued and tested.  1 more GEM, Cathode and gas window by early next week.  Finish assembly by end of next week. SBS readout ( E.Cisbani, INFN Italy) New design (K. Gnanvo. Uva) Panasonic connectorsZIF connectors

GEM module construction status at UVa 7 New 40 cm x 50 cm GEM stretcher at Uva GEM foil and Frame HV test box Fully equipped INFN 40x50 cm 2 GEM module for a beam test at DESY Clean room at UVa

GEM R&D and assembly facility at UVa  The mechanical stretcher  Use for stretching GEM foil and glue it to spacer frames to keep it flat  Stretch the foil to a tension bigger than 1kg/cm  Method developed by Bencivenni. Et al. (LNF Italy) for LHCb GEM chambers\ 8 New 40 cm x 50 cm GEM stretcher at Uva

9 Test frames glued

GEM R&D and assembly facility at UVa 10 GEM foil and Frame HV test box: - check for curent (sector current < 5 nA) and sector capacitance.The 3 foils tested so far have been good. Test foils were bad (higher currents)

GEM R&D and assembly facility at UVa 11

GEM R&D and assembly facility at UVa 12

K. Gnanvo - SoLID Coll. Meeting, 02/03/12 Page 13