INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.

Slides:



Advertisements
Similar presentations
Welcome Accounts Payable FY2010 Year-End Closing Workshop Presented by: Sandra King, Accounts Payable Manager Office of Business Services.
Advertisements

NATIONAL WORKSHOP ON MIS FOR NREGA NATIONAL WORKSHOP ON MIS FOR NREGA Dr MCR HRD Institute, Hyderabad MINISTRY OF RURAL DEVELOPMENT GOVERNMENT OF INDIA.
SessionIII:Monitoring and MIS
ON-SITE INSPECTIONS OF INVESTMENT PORTFOLIO OF INSURERS A CASE STUDY OF IRDA 15 th NOV, 2005 INSURANCE REGULATORY AND DEVELOPMENT AUTHORITY S N JAYASIMHAN.
NREGA and PO.
NREGA MIS Workshop Dr MCR HRD Institute, Hyderabad MORD, New Delhi.
1 Process of Data entry in Budget Proformae. 2 Outline General Instructions Proforma – A:Receipts Proforma – B1:Expenditure Non Plan Proforma – B2:Expenditure.
INTERNAL AUDIT Mechanism in SSA-MADHYA PRADESH. Staff sanctioned for Financial Management S.No.Name of Post Post sanctioned Post FilledPost Vacant State.
Prepared & Designed by MIS SECTION MGNREGA, JALPAIGURI
Mahatma Gandhi National Rural Employment Guarantee Scheme, West Bengal, Grievance Redressal Rules, 2009.
Implementation of Management Information System (MIS) including Financial Management System (FMS) in ICAR User Acceptance Testing – Financials.
free medicine and e-aushadhi
MIS 325 PSCJ. 2  Business processes can be quite complex  Process model: any abstract representation of a process  Process-modeling tools provide a.
Login Screen Step 1: Enter Your Individual Login Id and Password Step 2: Click On Submit Button.
PAYROLL PROCEDURES ANNUAL UPDATE PRESENTER: OSCAR TRIGO-DIRECTOR OF PAYROLL.
RDD Bihar Jan 091 E-Shakti: An ICT intervention in implementation of MGNREGS Department of Rural Development Government of Bihar.
Online Monitoring National Rural Employment Guarantee Act (NREGA)
Initiatives in ICT Infrastructure in Tripura Kumar Alok Commissioner & Secretary Government of Tripura Rural Development Department.
Mahatma Gandhi National Rural Employment Guarantee Act National Workshop On Social Audit 19 th July, 2011 Vigyan Bhawan.
 Systematic collection, analysis and fast action on media reports is must during campaign period  Checking veracity of shadow register,
Special Education Accountability Reviews Let’s put the pieces together March 25, 2015.
1. Definition of a Reconciliation 2. Importance of a Reconciliation 3. When to Prepare a Reconciliation 4. Items Needed to Prepare a Reconciliation 5.
Committee For Cooperatives & NPO Sectors An Overview of Financial Audit for MGNREGA.
PRESENTATION ON MIS PHED ASSAM Presented by -- NIC, Assam State Centre,
HOW TO REGISTER A TEAM Version 1.04 Rev Season 1v1.04 Rev ASA’s Online Registration.
Social Audit Campaign in Bihar Towards Transparency and Accountability Subhendra Nath Sanyal.
Private Candidates will obtain Paper Form onsite at Facilitation Centers, fill it (specifying personal/contact information, father CNIC, preferred exam.
ELECTRONIC FUND MANAGEMENT SYSTEM (e-FMS)
Roll Revision Cycle Intensive Revision Summary Revision Intensive summary Revision Continuous Updation Mother Roll Final Roll for that year (Mother Roll.
Understanding Financial Management
Social Audit Unit under MGNREGA Tripura
MG NREGS BARMER, RAJASTHAN.
TRAINING Accounts Payable Year End Close Process Presented by: Sandra King, Office of Business Services.
Statutory Audit of SSA Accounts for A PROGRAMME FOR UNIVERSAL ELEMENTARY EDUCATION MANUAL ON FINANCIAL MANAGEMENT AND PROCUREMENT Ministry of Human.
CommitteeStateDistrictMandal ChairmanMinister Rural DevelopmentDistrict CollectorPresident, Mandal Parishad Vice ChairmanPrl. Secretary RD__ ConvenerCommissioner,
National Scholarships Portal
Observations on Social Audit in Koraput By Civil Society Organizations, Koraput.
Implementation process of Mahatma Gandhi NREGS. At GP level Schemes deals with MGNREGS, TFC, KL Grant, GP Fund. MGNREGS Maintaining of Case Record in.
 An independent society known as ‘Mahatma Gandhi National Employment Guarantee Scheme- Social Audit Society’ has been registered on under.
1 Guidance Note on Bank Gaurav Dhamija. 2 Index S. No.ContentsPage No. 1. Objective Authorized Signatories Vouching Control.
Online Entry in MIS Panchayat Samity. Online panchayat Samityprevious.
National Training Raipur 28-31st July
Water Services Trust Fund How does the Sanitation Team apply for the NEMA Waste Transportation Permit (license)? 11/1/20151.
1 Department of Veteran Affairs Debt Management Center 2012 CONFERENCE March 20-23, 2012 School Liability Debt Payment Procedures Cindy GerdesTim Wheeler.
Session – 1 Overview of Functioning of Treasury Regional Training Institute, Ranchi Structured Training Courseware on Treasury Inspection.
Indira Awaas Yojana Ministry of Rural Development, Government of India.
WEST BENGAL RURAL EMPLOYMENT GUARANTEE SCHEME, 2006.
Convergence of MGNREGS & NRLM Experience from Kerala Presentation at the National Workshop on Convergence of MGNREGA with Other Programmes New Delhi; 17.
An Introduction to Lodging Establishment Inspections.
Common Deficiencies in Voucher Level Computerisation.
1 Banking and Reconciliation. 2 To Certify As A Cash Handler  Visit the training website  Review the Payment Card Industry (PCI)
SOCIAL AUDIT. SOCIAL AUDIT IS TO BE CONDUCTED AT GRAM PANCHAYAT BY THE GRAM UNNAYAN SAMITY THE PROCESS BEING FACILITATED BY THE GRAM PANCHAYAT SOCIAL.
WEL COME PREPARATION OF CASE RECORDS. MODEL CASE RECORDS A Model Case Record should contain  Order sheet duly numbered  Copy of Approved Annual Action.
Mission Antyodaya (IPPE-II)
e-MUSTER ROLL e-Measurement Book WAGE LIST PAY SLIP / WAGE SLIP
EXPECTATIONS FROM BRANCH AUDITORS Panel Discussion CA JAGDEESH DHONGDE.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
FINANCIAL MANAGEMENT INTERNAL CONTROL PROCEDURES IN SECONDARY SCHOOLS PRESENTED BY MURAYA KARIUKI AT EDEN ROCK MALINDI DISTRICT SCHOOLS AUDITOR MALINDI.
Contract Compliance Training
KERALA PANCHAYAT RAJ (ACCOUNTS) RULES 2011 AND ACCOUNTING PROCEDURES
NREGA: THE BEGINING The National Rural Employment Gurantee Act(NREGA) notified on september’2007. Burdwan district come under notififation of NREGAfrom.
Internal Controls.
MUSTER ROLL VERIFICATION
User Manual Financial Accounting
Water Sector Trust Fund
Year-End Closing of the Books FY 2018.
TESTING THE PAYROLL SYSTEM
Internal Controls.
Internal Controls.
Presentation transcript:

INSPECTION OF SCHEMES

PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT & INSPECTS THE DOCUMENTS. TAKES SAMPLE FROM MUSTER ROLLS. VISITS THE FIELD AND VERIFIES THE SAMPLE. SUBMITS THE FILLED FORMAT TO DISTRICT.

WHY NEW PROCESS NO IDEA REGARDING THE SCHEME TO BE INSPECTED. DATA COLLECTION A TIME CONSUMING PROCESS. TIME CONSTRAINT FOR FIELD INSPECTION. AMBIGUITY IN DATA VERIFICATION. ABSENCE OF KEY INFORMATIONS. NON – AVAILABILITY OF KEY DATA IN THE FIELD.

KEY FEATURES OF NEW PROCESS CONVERGENCE WITH MIS.

WHAT WE WILL HAVE? PRIOR INFORMATION ABOUT SCHEME TO BE INSPECTED. COPY OF ALL DOCUMENTS PRIOR TO INSPECTION. CHANCES OF PRIOR ANALYSIS OF THE SCHEME TO BE INSPECTED. PRIOR SELECTION OF KEY PROCESS TO BE INSPECTED. A COORDINATED WELL – PLANNED INSPECTION.

HOW TO PREPARE? 1.Get the Asset Register of the Gram Panchayat to be inspected through MGNREGA website. 2.Select completed schemes to be inspected. 3.Get copy of Muster Rolls used in the scheme. 4.Get details of the Material procured for the scheme. 5.Get any other details / reports appear to be important for smooth & fruitful inspection.

Data Collection through MGNREGA website

During inspection, document generated through MIS is to be used for sample checking. Sample is to be taken from every Muster Roll to ensure 100 % Muster Roll verification. Sample is to be taken from the details of Material procured and verified with stock register. After collection of data in the prescribed format proper compilation is to be done. Finally report is to be prepared covering all major issues followed by corrective measures. Copy of the Asset Register (generated through MIS), filled Inspection Format, Inspection Report (prepared by inspecting team) & Corrective Measures taken, if any, by the PO & BDO is to be forwarded to the District Cell in due time. Details regarding on – going work may also be generated from MGNREGA website.

COLLECTION OF DATA (ON – GOING WORKS) FROM OTHER SOURCES

COLLECTION OF DATA OF LINE DEPARTMENT

AGAINST SCHEME VISITED PLEASE INSPECT –Annual Action Plan / Supplementary AAP –Sanction orders –Fund requisition –Work order / Tender Notice –4 A & 4 B –Measurement sheet / Measurement Book –Display Board –Worksite facility –Job detail entry in Muster Rolls & Job Cards –Scroll for Postal / Bank payment –Entry in 3 No. Register, Sub – Cash Book, Asset Register –Stock Register –3 – stage photography –Work completion certificate

KEY AREAS TO BE COVERED WHILE SUBMISSION OF INSPECTION REPORT FOR A GRAM PANCHAYAT AS A WHOLE Observation noted against schemes Non – operationalisation of MIS Non - adherence of Wage – Material Ratio Delay in work completion Non – adherence of time schedule for payment of wages Absence of Grievance Redressal Mechanism (Complaint Box / Complaint Register / Non – disposal of complaints)

MGNREGS INSPECTION FORMAT Sheet No. 1 (Following to be filled during office visit) Date of visit: …………………………………..Block……………… Gram Panchayat/ Line Dept. ………………………………... Whether asset register found updated ……………………………………………………………..…………………………………...……… Sub – Cash Book updated till which date……………………………………………………………………………..…………………… Whether Complaint Register found? …………………………………..…………………………………………………………..…………… If yes, Complaint Received……………………………………………. Complaint Disposed ………………..……………………………... Name of the scheme inspected ……………………………………………………………………… ……………….…………………………. Action Plan No. ………………………………………MIS generated Scheme No. …………… ……………… Whether 4 A & 4 B found for the scheme …………………………..… Whether filled properly …………………………………………. Method used for intimating job provision against work 4 A………………………………………………………………………………… Whether job detail properly entered in the 3 No. Register ……………………………………………………..…………………………… Was measurement done in due time?………………………………………………………………………….……………………………….. Whether three – stage photography done …………………………………………………………………………………………………… Was Muster Rolls deposited in due time by Supervisor? …………..……………………………………………………………………… Are the Muster Rolls completely filled in ……………………..……Whether passed for payment ……………………………………... Are there any cutting / over-writing / use of whitener in the Muster Rolls? ………………………………………………….………….. Is there any disparity in the job details of the original Muster Rolls with that generated through MIS ……………………………

Sheet No. 2 (Following details to be filled during field visit) Whether Display Board found at worksite during field visit: ……………..…………. Details of Muster Rolls against which labours were contacted……………………… Whether job cards found with the labour ……………………………………………….. Whether job details entered properly in the job cards ………………………………... Whether pass – book found with the labour ……………………………………………. Were villagers satisfied with the work …………………….……………………………... Whether dated receipts issued on demand of work …………………………………... Whether complete worksite facility provided during work? ………………………… Observation during physical verification ……………………………………………….. Signature of the Inspecting Officials with date: ………………………………………...