10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation.

Slides:



Advertisements
Similar presentations
A new Network Concept for transporting and storing digital video…………
Advertisements

FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
11/10/98Online Meeting Julia Velkovska Running and Monitoring the PHENIX Drift Chamber Julia Velkovska and Tom Hemmick.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
(Tentative) Plan for Last Days of School. Friday 5/8 / Monday 5/11 Work on empathy final project Tuesday 5/12 / Wednesday 5/13 (MIN.) Work on empathy.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
8/9/2000T.Matsumoto RICH Front End RICH FEE Overview PMT to FEE signal connection Trigger Tile Summation of Current RICH LVL-1 Trigger Module1,2 What is.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
1 Grants.gov Update to the NGP February 1, Grants.gov System Improvements  December 11 – 12, 2010: Oracle Database version 11g upgrade  January.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
7 Feb 2005T. Yasuda, Fermilab D0 Status Report 2/7/2005 Taka Yasuda Fermilab.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
HR Information System Upgrade ONLINE ENGAGEMENT & ONBOARDING.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Non Leap YearLeap Year DateDay NumberMod 7Day NumberMod 7 13-Jan Feb Mar Apr May Jun Jul
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Objectives: Develop a solution to either enhance or replace the FasTrak tool Scope/Why is this important?: Increase the transparency for issues that are.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
21 November, 08, jadzia warchol, ext. 8341, phone Calibration of CFT Detector Download trigger (in taker, under Modify: Free Trigger & Change.
Copy of the from the secure website - click on the AccoridaLife.zip link.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Xenon Detector Installation schedule Satoshi MIHARA.
J. Linnemann, MSU 2/12/ L2 Status James T. Linnemann MSU PMG September 20, 2001.
FNAL All Experimenters Meeting June 24, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Operations June 17 – 24, 2002  Notable “features”
Doc.: IEEE /1522r0 Agenda January 2016 Dorothy Stanley, HPESlide 1 IEEE TGmc January 2016 Agenda Date: Authors:
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
2016 Holiday Schedule City Residents Trash and yard waste.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
PART OF SPEECH DEFINITION SYNONYM SENTENCE NAME TEACHER AND DATE1 WORDS OF THE WEEK.
Dynamed Plus Mobile App Download Directions Mercer University School of Medicine Medical Libraries.
Online Software Status
Chapter 8 Advanced SQL Pearson Education © 2014.
ECAL electronics schedule
CMX scope and functionalities
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Presentation transcript:

10 Dec 02 CFT+PS Week in Review CFT_Gui broadcasts limited Calibration/DataBase issues Grounding changed on 6 AFEs Two AFEs replaced –SIFT gain variation –vref calibration problem on two MCMs Multiple AFE swaps –hunting for source of link errors Discriminator Threshold Reduced from 1%+2pe to 1%+1pe Personality update for all CFTA –except for single chip that refused download CTT inputs used in L1Muon trigger –relatively smooth operation to date –awareness between stores too! Crate x13 –FEBs occuring about once an hour –addressed via SCL init –data stability and integrity under investigation

10 Dec 02 Quiet Time Activity

10 Dec 02 More Quiet Time Activity

10 Dec 02 Plans Access activities –sequencer 1553 eprom update in crate 0x5 –sequencer code changes for timing studies –AFE grounding studies –FPS pulser studies –AFE board swaps? –Sequencer tick studies? –Glink transmitter upgrades? –FPD readout integration tests install sequencer and AFE test database capabilities Calibrations Continue trigger advances January shutdown scheduled

10 Dec 02

1%+2PE

10 Dec 02 1%+2PE

10 Dec 02

Dmitri’s Info on Shutdowns 3.5 week shutdown in January 2003 Shutdown starts Monday 13 Jan 2003 –starting date frozen on 25 Nov Cooling water restriction Monday and Tuesday 13 and 14 Jan will limit platform operations Cryostat warmup begins 13 Jan Cryostat cold again on 24 Jan Search and secure ends shutdown on Tuesday 4 Feb 2003 Tevatron operations resume Wednesday 5 Feb 2003 Six week shutdown tentatively scheduled for July-August 2003