HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand,

Slides:



Advertisements
Similar presentations
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
Advertisements

SQXF Instrumentation wires and connectors. Instrumentation & Quench heaters wires March 2014 J.C. Perez2 Instrumentation wires: AXON reference HH2619.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Test Result overview: Timeline, highlights and challenges H. Bajas TE-MSC-TF.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
HQ02b : Test plan overview Test plan overview: Main elements and Open questions H. Bajas TE-MSC-TF H. BAJASUpdate meeting on HQ02b assembly and test plan02/05/2014.
Coil parts & Instrumentation issues for LQ/HQ coils tested at Fermilab HQ/LHQ coil parts task force.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
HL-LHC: UPDATE ON MAGNETS
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
HQ01e3 test summary December 2012 M. Marchevsky, LBNL.
Test Program and Results Guram Chlachidze for FNAL-CERN Collaboration September 26-27, 2012 Outline Test program Quench Performance Quench Protection Magnetic.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Arjan Verweij, AT-MAS, Workshop on test facilities and measurement equipment needed for the LHC exploitation, 12 April 2006 B163 - FRESCA.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
HQM01 Test Summary Outline -Magnet Instrumentation and Shim System -SG Data -Short Sample Limits -Quench Training at 4.6 K and 2.2 K -Ramp rate and Temperature.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
MP3- MIC-C S1-2 A22R1- 19/08/2009 G.D’Angelo on behalf of Elqa team MP3 MIC-C test campaign in S1-2 Special guest: A22R1 (MB2413)  MIC-C in the ARC results.
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
Dan Cheng, Xiaorong Wang 12/15/2015 MQXFA Connectors Discussion Part II.
MQXFS01 instrumentation, Projecting towards MQXFA D. Cheng, S. Myers, H. Pan, X. Wang 10/14/20151.
J.C. Perez, S. Izquierdo Bermudez 11T Dipole models instrumentation.
MQXFS1 Test Results G. Chlachidze, J. DiMarco, S. Izquierdo-Bermudez, E. Ravaioli, S. Stoynev, T. Strauss et al. Joint LARP CM26/Hi-Lumi Meeting SLAC May.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
LQS01a Test Results LARP Collaboration Meeting 14 Fermilab - April 26-28, 2010 Guram Chlachidze.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
HQ02 TEST STATUS April 4, 2013 FERMILAB. Test status  Magnet delivery to FermilabApr. 02  SG checkoutApr. 04  LE & RE interface plate mounting Apr.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
Cold powering test results of the 11 T cosθ model magnets at CERN Gerard Willering With thanks to Jerome Feuvrier, Vincent Desbiolles, Hugo Bajas, Marta.
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXC Nb-Ti 120mm 120T/m 2m models
MQXFPM1 and MQXFS1b Test Results
Coil Design and Fabrication
11T Magnet Test Plan Guram Chlachidze
Model magnet test results at FNAL
MQY-30 Test Result Report
HO correctors update Massimo Sorbi and Marco Statera
LHC Hardware Commissionning
Status report on MQYY (Q4)
Q0 magnet, cooling, support ideas
Glyn Kirby Magnet AssemblyTechniques.
HO Corrector Magnets: decapole test and future plans
HQ01e-3 magnetic measurements
MBHSP02 test STATUS and first results
Voltage tap layout and quench antenna options for the long QXF magnet
CEA Nb3Sn quadrupole magnet : test results and future
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

HQ01e CERN test preparation update CERN Team: H. Bajas, M. Bajko, A. Chiuchiolo, G. Deferne, O. Dunkle, J. Feuvrier, P. Ferracin, L. Fiscarelli, F. Flamand, C. Giulox, M. Ky, S. Russenschuck, E. Todeso, P. Viret, and others. and the LARP team

Overview Magnet preparation – Rotating coil – Instrumentation/connector – Current lead extension – Magnet status Test plan is under preparation Schedule Plone folder for more information about the CERN test: HQtestCERN/ 2/16/2012HQ01e CERN test status2

Work bench 2/16/2012HQ01e CERN test status3

90 mm diameter rotating probe – Quench attenne and G10 circular strain relief boards were removed from the bore Helium turbulence due to a quench and limited space. – two layers of G10 sheets wrapped around the aperture to protect the wiring – Holes along the G10 tube Rotating probe 2/16/2012HQ01e CERN test status4

Instrumentation connectors 2/16/2012HQ01e CERN test status 5 After the rotating probe’s installation, magnet stood up. Probe centering completed. Connectors for CERN header made.

Issue – Negative lead too short – Positive lead too long Extend the negative lead with a pair of LHC dipole cable – 13 kA/cable nominal capacity; 22 kA quench observed at CERN – Detailed parameters requested – HQ short sample K NbTi lead extension 2/16/2012HQ01e CERN test status6

NbTi extension Splice configuration 2/16/2012HQ01e CERN test status7 HQ NbTi LHC NbTi Ag96Sn4 solder Coil 7 lead Heating stationContact length: 15 cm, ~ 1.5 pitch length; Will be monitored by a pair of V-taps

Magnet instrumentation status No new open taps checked at the magnet connector Hipot results show little degradation – Protection heater vs. coil, see H. Bajas’s presentation on plone (meeting Feb 9, 2012) – Not identical test procedure/method Resistance between endshoes – Coil 8 return end: 6.18 kOhm – Coil 5 lead end: 0.8 Ohm – No short between endshoe and coils Strain gauge readings consistent with those before shipping. 2/16/2012HQ01e CERN test status8

Plan and schedule Test plan under preparation – Power test and magnetic measurement under discussion/update within the CERN team – Will be distributed for discussion Remaining tasks – Signal check and wiring cleanup; – Insulation around the NbTi leads; – Attach HQ to the header; – Wiring to the test facility and electrical check; – Warm magnetic measurement; – … Tentative Schedule – Cooldown in the week of 2/20/2012 (will take > ~ 36 hours) 2/16/2012HQ01e CERN test status9