LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)

Slides:



Advertisements
Similar presentations
The Individual Health Plan Essential to achieve educational equality for students with health management needs Ensures access to an education for students.
Advertisements

Satellite Operations Center Emergency Management Update & Exercise Review 4/3/2009.
Compliance - Work Permit CAKE Session 17. Purpose of the Work permit system: The Purpose of the system is to: - Prevent undesired incidents and mitigate.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Safety Overview.
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Implementation Chapter Copyright 2004 by Delmar Learning, a division of Thomson Learning, Inc. Purposes of Implementation  The implementation.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
Visual 5.1 Briefings Unit 5: Briefings. Visual 5.2 Briefings  Describe components of field, staff, and section briefings/meetings.  Plan to give an.
On Site Review Process Office of Field Services.
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Chapter 7 Administration of the Fire Department
Runway Safety Teams (RSTs) Description and Processes Session 5 Presentation 1.
Permit to Work Procedure Document Number: KOC.SA.004
M. Scharfenstein - ES&H Coordinator 8 June 2009
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
1 CHCOHS312A Follow safety procedures for direct care work.
IS-700.A: National Incident Management System, An Introduction
ISO EMS OVERVIEW May ISO EMS OVERVIEW TRAINING Contents What is an EMS? Why ISO & Certification? EMS Basic Elements Environmental.
Occupational Health and Safety
The Campaign for McMaster University Environmental & Occupational Health Support Services and Central Joint Health and Safety Committee Developed from.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Our Team consists of :  Judith  Kylie  Dylan  Fabian 19/09/20151 Bee Inspired Web Designers Team-Bega Tafe 2012 We desire to Inspire.
NIST Special Publication Revision 1
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
The Expectation Triad Healthcare Engineering Consultants Regulatory Compliance: “Ensuring that all of the required standards are being met”
OSHA Office of Training and Education1 Safety and Health Programs.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Hot Work Procedure and Permit
Visual 5.1 Briefings Unit 5: Briefings. Visual 5.2 Briefings  Describe components of field, staff, and section briefings/meetings.  Plan to give an.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
RESPONSIBLE PERSON TRAINING. Review of § Emergency Evacuations.
HBR Best Practices Seminar Presented by CertifiedSafety Brady’s Landing June 30, 2005.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
1 Hazard Assessment Evaluation of a work place for potential hazards.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
Fire Officer 3 - Safety Programs1 Safety Program Development Fire Officer 3 Program Administration.
1. 2 Hazard Assessment 3 Your accident rates or injury rates will be reduced by being pro-active in Hazard Assessment.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
Inclusion: Effective Practices for All Students, 1e McLeskey/Rosenberg/Westling © 2010 Pearson Education, Inc. All Rights Reserved What.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Ferris State University & Michigan Department of Career Development 1 Hazard Assessment.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
SPC Advisory Committee Training - TAC Fall 2015 Institutional Research President’s Office 1 Abridged from the SPC Advisory Committee Training on October.
SPC Advisory Committee Training Fall 2015 Institutional Research President’s Office SPC 10/9/20151.
WEEKLY SAFETY MEETING July 15th, IRI 750 OGEC rig N’Giri - 3
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
LST SAFETY FRANK O’NEILL (SLAC) 10/21/03. SAFETY ISSUES Seismic Fire Electrical Environmental.
Teaming/Data/Interventions RtI Infrastructure: Teaming RtI Partnership Coaches meeting January 6, 2011 Terry Schuster, RtI Partnership Lead Coach.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Health and Safety Self Assurance Toolkit 2017
Job Hazard Analysis (JHA) Training for Safety and Health Staff
Preview of Access Processes for Working at SURF
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
Accident and Incident Investigation
Flooding Walkdown Guidance
U.S.D.A. FOREST SERVICE REGION 6
Crown Point Community Schools Transportation Department
ES&H PLANNING BaBar D&D March 24, 2009
Ian Evans SSRL Safety Office
DOE Review of the LCLS Project October 2006
Presentation transcript:

LST SAFETY INSTALLATION READINESS REVIEW 5/5/2004 FRANK O’NEILL (SLAC)

SAFETY ISSUES Safety Plan Design Safety Issues FHA Addendum Environmental/Emissions

SAFETY PLAN October 2003, Review Committee - Recommendation #3 “ Third is the need for more formal safety planning. The circumstances of the installation in 2004 and 2005 present a significant risk of accident. Early, detailed, safety planning is needed to ensure adequate personnel training and full-time coverage by safety officers on all shifts for the duration of the installation. With appropriate advance planning, training, and staffing, the work can be conducted safely.”

SAFETY PLAN Safety Team and Coverage Safety Training Job Hazard Analysis Tailgate Safety Meetings Safety on agenda for Daily Operations Meetings Safety Coordination - Fire Safety, Security, OHP, PRCS, ETC. Management Safety Walkthroughs

SAFETY TEAM Team Leader is Sandy Pearson Members include Frank O’Neill and Joe Kenny- Four additional team members are needed for the day and swing shifts Candidates have been identified Time commitment is two 8 hour shifts per week BaBar Operators will be considered for Graveyard shift safety coverage

SAFETY TRAINING Accident Prevention Talk & Walk IR-2 Safety Briefings will be conducted every day the first week IR-2 Safety Briefings will be conducted weekly thereafter - Wednesday at 1:30 at IR-2 Cornelius - and as required

JOB HAZARD ANALYSIS Rigging Procedures and Job Hazard Analysis (JHA) have been completed for special purpose handling fixtures Safety Review of these procedures and JHA has been accomplished

TAILGATE SAFETY MEETINGS Will be conducted at the start of each shift and as necessary at the beginning of new activity and operations Review of the JHA with the crews is an essential part of the tailgate safety meeting

DAILY OPERATIONS MEETINGS Safety on Agenda at Daily Operations Meetings A Safety Team Member will attend and communicate safety issues and concerns

SAFETY COORDINATION Fire Safety Security OHP PRCS

MANAGEMENT SAFETY WALKTHROUGHS This is under consideration

DESIGN SAFETY ISSUES Flammable Component of Gas Mixture Electrical/Electronics Final Design

GAS MIXTURE 3 components: Argon, Isobutane, and CO 2 Similar Gas Mixtures utilized on other Detectors –SLD: 2.5% Ar, 9.5% isobutane, 88% CO 2 –ZEUS: 3% Ar, 8% isobutane, 89% CO 2 Final decision on mixture pending Nonflammable mixture will be utilized Hughes Associates providing consulting services for evaluation of mixtures

GAS MIXTURE STATUS Hughes Associates Inc. reviewed and approved the gas system proposal Fire Protection Safety Committee review completed April 6, 2004 Hazardous Experimental Equipment Committee (HEEC) review completed April 12, 2004 – final walkthrough before start-up is required

FIRE HAZARD ANALYSIS (FHA) ADDENDUM Hughes Associates Inc. is currently working on the second Addendum to the FHA Recently received a description of the LST Electrical/Electronics – an issue to be addressed is do we need to provide VESDA coverage Ed Budnick has committed to delivering the Addendum by the end of June Submit to the DOE for Information Only

ENVIRONMENTAL SAFETY Bay Area Air Quality Management District (BAAQMD) issues SLAC a permit for discharge of VOCs –BaBar emissions may approach the limits of the permit –Monitoring the emission levels and coordination with the SLAC Environmental Protection Department is ongoing