1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale Cycle 1 & 2 Status & Cycle 3 results.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

ALMA Cycle 2 Capability Jongsoo Kim ALMA EA Korea node.
Master Plan. Citizens’ Health Care Working Group Master Plan November 2005.
General Activities Stuartt Corder April 9, 20141ASAC telecon.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
CSV Plan status Robert Laing ESO Science IPT. 2 Recent changes Complete rewrite to take account of rebaselining and revised delivery schedule Proposal.
ALMA TACand the proposal process Lister Staveley-Smith Member, ALMA Review Panel.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
Contact Scientist Workflow Scott Schnee Dec 19, 2011.
ALMA Proposal Preparation and Submission Eelco van Kampen European ALMA Regional Centre (ESO, Garching) Thanks to Liz Humphrys, Andy Biggs and Paola Andreani.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
ALMA Proposal Preparation and Submission Liz Humphreys European ALMA Regional Centre ESO, Garching Thanks to Andy Biggs, Paola Andreani, Eelco van Kampen.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
1 ANASAC Meeting – May 20, 2015 Al Wootten Science Overview & Publications.
National Radio Astronomy Observatory May 17, 2006 – Legacy Projects Workshop VLA/VLBA Large Projects Jim Ulvestad Assistant Director, NRAO.
Software Integration and Test Techniques in a Large Distributed Project: Evolution, Process Improvement, Results Paola Sivera - ESO.
1 ANASAC Meeting – May 20, 2015 ALMA Pipeline Brian Glendenning (for Jeff Kern)
Cycle-3 Capabilities and the OT Andy Biggs ALMA Regional Centre, ESO.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Tools for the ALMA.
Molecular Gas and Dust in SMGs in COSMOS Left panel is the COSMOS field with overlays of single-dish mm surveys. Right panel is a 0.3 sq degree map at.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array CASA Progress.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Using CASA to Simulate.
ATUC meeting Director’s Report Brian Boyle November 2007.
Designing Experiments T. Venturi Istituto di Radioastronomia, Bologna, INAF ERIS, Manchester, 9 September 2005.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Transition Operations Claire Chandler.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale ALMA / NAASC Status – 2015 ANASAC Meeting.
The North American ALMA Science Center North America’s ALMA Regional Center The North American ALMA Science Center acts as the gateway to ALMA for North.
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
Molecular Clouds in in the LMC at High Resolution: The Importance of Short ALMA Baselines T. Wong 1,2,4, J. B. Whiteoak 1, M. Hunt 2, J. Ott 1, Y.-N. Chin.
Observing Modes from a Software viewpoint Robert Lucas and Philippe Salomé (SSR)
ALMA Polarization Commissioning and Verification Status Kouichiro Nakanishi (Joint ALMA Observatory/NAOJ) on behalf of ALMA Polarization Commissioning.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Data Processing Progress.
1 ANASAC Meeting – May 20, 2015 Mark Lacy ALMA archive status and plans.
ES Slowdown, Optimization, Testing. Plan for shutdown: Timeline April: Focus on resolution of major outstanding issues: – Bulk data deployment  stable.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
Presented By WVDE Title I Staff June 10, Fiscal Issues Maintain an updated inventory list, including the following information: description of.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array ALMA Pipeline.
State of Georgia Release Management Training
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
NOAA Fisheries Update MAFAC Meeting Paul Doremus DAA for Operations September 23, 2014.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Science Overview and Discussion Al Wootten ANASAC Sept
Charlottesville, November ALMA CSV Update Alison Peck Current status.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Astrochemistry with the Upgraded Combined Array for Research in Millimeter-wave Astronomy D. N. Friedel Department of Astronomy University of Illinois.
ALMA Integrated Computing Team Coordination & Planning Meeting #3 Socorro, June 2014 Observation with ACA correlator for Cycle3 Manabu Watanabe NAOJ.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Using CASA to Simulate.
The North America ALMA Science Center
Implementation Review Team Meeting
ALMA Cycle 5 Hiroshi Nagai (NAOJ).
EVLA Availability - or - When Can I Use It?
Broward County Consolidated Communication Committee Update
Atacama Large Millimeter Array
Rick Perley National Radio Astronomy Observatory
Observational Astronomy
Observational Astronomy
EVLA Advisory Committee Meeting
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Observatory Science Operations
Observatory Science Operations
Signing up to Making Tax Digital – VAT
Executive Project Kickoff
Signing up to Making Tax Digital – VAT
Presentation transcript:

1 ANASAC Meeting – May 20, 2015 P. Jewell, J. Hibbard, C. Lonsdale Cycle 1 & 2 Status & Cycle 3 results

2 ANASAC Meeting – May 20, 2015 CYCLE 1, 2 STATUS

3 ANASAC Meeting – May 20, 2015 Observing Progress Number of Executions by Array component (Mar 11 ) 3 Cycle 1Cycle 2 Start of Cycle 2 Long baseline campaign Start of Cycle 2

4 ANASAC Meeting – May 20, 2015 Observing Progress Number of Executions by Priority Grade (Mar 11 ) 4 Cycle 1Cycle 2 Start of Cycle 2 Long baseline campaign Start of Cycle 2

5 ANASAC Meeting – May 20, 2015 NA ALMA User Support Observing Progress (NA only, as of May 19)

6 ANASAC Meeting – May 20, 2015 Assignment of backlog that built up waiting for start of PL processing NA caught up with initial PL backlog Assignment of all post-LBC datasets prior to Cy3 call NA caught up with assignments prior to Cy3 call Steady-state goal: ~43 OUS/mo

7 ANASAC Meeting – May 20, 2015 Cycle 1 & 2 Completion Projects As of May 19:

8 ANASAC Meeting – May 20, 2015 Cycle 1 & 2 Completion ObsUnitSets (=datasets) As of May 19:

9 ANASAC Meeting – May 20, 2015 Status – ALMA Telescope Operations Project and OUS Completion Status by Executive (May 19)

10 ANASAC Meeting – May 20, 2015 Requested and Remaining Time L Nyman. As of March 11, all Executives Total requested time Total remaining time Cycle 1 Highest: 532 h Remaining = 252h (47%) Cycle 2 A+B: 1672 h Remaining = 1103h (66%) 10 Hours remaining = as of Feb/Mar engineering time ~325hrs observed since

11 ANASAC Meeting – May 20, 2015 Prediction of Completion As of March 11: 1355 hrs of 2200 hrs remain – ~325 hrs observed ES blocks – 13 ES block remain ~ 800 hrs (~60hr QA0 pass per block) – Implies 230 hrs unobserved => ~90% completion However: – Some projects simply cannot be scheduled due to inability to do high frequency observations (> band 7) during the day Compact configurations, LST~0 h – 5 h Extended configurations, LST~5 h – 10 h – Other projects are in oversubscribed LSTs March 11, 2015ALMA Board meeting at SCO11

12 ANASAC Meeting – May 20, 2015 LST pressure per configuration L Nyman. As of March 11 C34-1 C34-3 C34-2 C34-5 C34-4 C34-7 C34-6 | | |. | | 0 h 5 h 10 h 15 h 20 h LST 12 The black horizontal lines in the figures indicate the distribution of available time according to the current array configuration schedule APRIL APRIL & MAYMAY JUNE AUG & SEP JUN, JUL, AUG, SEP MAY?

13 ANASAC Meeting – May 20, 2015 LST pressure per configuration L Nyman. As of March 11 C34-1 C34-3 C34-2 C34-5 C34-4 C34-7 C34-6 | | |. | | 0 h 5 h 10 h 15 h 20 h LST 13 The black horizontal lines in the figures indicate the distribution of available time according to the current array configuration schedule APRIL APRIL & MAYMAY JUNE AUG & SEP JUN, JUL, AUG, SEP MAY?

14 ANASAC Meeting – May 20, 2015 Prediction of Completion (best case) L. Nyman, March 11 Cycle 1: 16 projects unlikely to be observed (52 h) – 92% completion rate Cycle 2: 32 projects unlikely to be observed (121 h) – 91% completion rate Total: 48 projects unlikely to be observed (173 h) – 91% completion rate Most likely 4 Cycle 2 grade A projects will be transferred to Cycle 3 March 11, 2015 ALMA Board meeting at SCO 14

15 ANASAC Meeting – May 20, 2015 Executive Balance – Cycle 0 ✓

16 ANASAC Meeting – May 20, 2015 Executive Balance – Cycle 1 (as of Feb/Mar Engineering time) Regional Share: 33.8% 33.8% 22.5% 10.0% (<5%) ✓

17 ANASAC Meeting – May 20, 2015 At increased ES observing frequency and efficiencies, Data reduction is straining resources at the ARCs – JAO is streamlining processes – NA is hiring more staff While TP observing has begun, TP data reduction path has still not been proven and distributed to ARCs No group-level data combination has been performed; “best practices” not established – NAASC is doing this individually via helpdesk & in- person visits (6 cases). About to roll out a CASAguide Cycle 1 & 2 Status: Challenges

18 ANASAC Meeting – May 20, 2015 CYCLE 3 RESULTS

19 ANASAC Meeting – May 20, 2015 ALMA Proposal Cycles Cycle 0: Sep 2011-Dec 2012 (990 proposals, 500h) Cycle 1: Jan 2013-May 2014 (1131 proposals, 800h) ~300 hrs transferred into Cycle 2 Cycle 2: Jun 2014-Oct 2015 (1382 proposals, 1700 h) Cycle 3 – Deadline was April 23 PRP meetings: June 22-26, 2015 (in Osaka, JP) Communication of Outcome of Review Process: August 2015 Start of Cycle 3: October 1, 2015 – Start of yearly cycles

20 ANASAC Meeting – May 20, 2015 Cycle 3 Proposal Process Improvements Several improvements were made to assist investigators – Cycle 3 Array schedule published in Proposers Guide – Document improvements Better explanations of multiple pointing and multiple tuning choices Improved calibration chapter in the Technical Handbook – Helpdesk and Knowledgebase “Cycle 3 News” top-level menu item on SP points to KB article that accumulates known issues Included graphics for some KB articles Helpdesk staffed for entire week prior to deadline, and 72h of continuous “follow-the-sun” emergency department (twice that of Cycle 2) – Questionnaire released much sooner, closing end May 340 replies to date

21 ANASAC Meeting – May 20, 2015

22 ANASAC Meeting – May 20, 2015

23 ANASAC Meeting – May 20, 2015 Cycle 3 Observing Capabilities and Policies Cycle 3 begins 1 October. Cycle 3 is no longer Best Efforts for standard proposals – New category: Non-standard = Bands 8, 9 10 or baselines > 2.5 km With Cycle 3, ALMA begins a 12 month proposal cycle Supplement to C (filler) projects: low frequency and under-subscribed LST ranges Capabilities for Cycle 3 (new / extended capabilities marked in red): – At least thirty-six 12-m antennas in the main array, and ten 7-m antennas and two 12-m antennas (for single-dish maps) in the ACA. – Receiver bands 3, 4, 6, 7, 8, 9, & 10 (wavelengths of about 3.1, 2.1, 1.3, 0.87, 0.74, 0.44, and 0.35 mm, respectively). – Baselines up to 2 km for Bands 8, 9 and 10. – Baselines up to 5 km for Band 7. – Baselines up to 10 km for Bands 3, 4, & 6. – Both single field interferometry and mosaics. – Spectral-line observations with all Arrays and continuum observations with the 12-m Array and the 7-m Array. TP Array use is limited to spectral line observations in Bands 3 to 8. – Polarization (on-axis, continuum in Band 3, 6 and 7, no spectral line, no ACA, no mosaics, no circular polarization). – Mixed correlator modes (both high and low frequency resolution in the same observation). – The maximum observing time per proposal, as estimated by the OT, is 100 hours.

24 ANASAC Meeting – May 20, 2015 Proposal Submission for Cycle Proposal codes were assigned by the deadline on April 23, 2015 from around the world

25 ANASAC Meeting – May 20, 2015 Helpdesk Support More complete coverage in week up to deadline 365 tickets in total (178=49% for NA) 25

26 ANASAC Meeting – May 20, 2015 Cycle 3 Proposal Submission 1582 unique proposals (+14%) requesting 9037 hrs on the 12-m Array – 5.7 hrs per proposal – Oversubscription by hours = 4.3 – 76% / 24% hrs requested “standard” / “non- standard” 1122 individual PIs and 3608 PI+Co-Is from 47 countries

27 ANASAC Meeting – May 20, 2015 Cycle 3 Proposal Statistics

28 ANASAC Meeting – May 20, 2015 Proposal Process Future improvements Improvements to KB articles, including graphics Revision of Primer and “Did You Know” flyer to include updated and more accessible example observations Videos to explain some of the more complex setups More information on use of simulators with more examples  Starting the Cycle 4 planning earlier in the cycle if the data reduction schedule allows

29 ANASAC Meeting – May 20, science.nrao.edu The National Radio Astronomy Observatory is a facility of the National Science Foundation operated under cooperative agreement by Associated Universities, Inc.