KLM summary P. Pakhlov (ITEP) Status of Geant4 simulation of scintillator KLM Status of Geant4 simulation of scintillator KLM by Gallina PAKHLOVA (ITEP)

Slides:



Advertisements
Similar presentations
P. Pakhlov (ITEP) presented by G.Pakhlova EKLM status  Reminder: EKLM general layout & past years activities  Key challenge of this year: assembly and.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Silicon Photomultiplier Readout Electronics for the GlueX Tagger Microscope Hall D Electronics Meeting, Newport News, Oct , 2007 Richard Jones, Igor.
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Simulation of a Magnetised Scintillating Detector for the Neutrino Factory Malcolm Ellis & Alan Bross Fermilab International Scoping Study Meeting KEK,
Status of CLAS12 PCAL project
Status of scintillator KLM study P. Pakhlov (ITEP)
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Photo-detector and scintillator studies at ITEP Outline 1. Check of casting form 2. Study of MRS APD’s from CPTA 3. MC simulation of light collection in.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Scintillator strip KLM detector (progress report) P. Pakhlov for ITEP group.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Scintillator tile-SiPM system development for CALICE Engineering AHCAL Prototype Michael Danilov, ITEP & CALICE LCWS10 Beijing March 2010 Outline New scintillator.
Scintillating Tiles for the Muon Inner regions LHCb Muon Upgrade meeting, CERN May Wander Baldini for the Ferrara LHCb group.
1 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL 1. EMR production status 2. EMR simulations (FEA studies) 3. RAL Teleconf.
KLM detector for SuperB P. Pakhlov (ITEP) 1 st Open meeting of the SuperKEKB Collaboration.
Mass production and mechanical structure P. Pakhlov (ITEP)
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
KLM detector for SuperB P. Pakhlov (ITEP) 1 st Open meeting of the SuperKEKB Collaboration.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
CBM ECAL simulation status Prokudin Mikhail ITEP.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
P. Checchia LCWS02 Jeju1 Lccal * : an R&D project for the Electromagnetic barrel Calorimeter Design principles Prototype description Status of.
Scintillator strip KLM detector for Super Belle P. Pakhlov for ITEP group Outline: Motivation for new detector Proposed setup Geiger APD as photodetector.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
HCAL Modules -First Ideas Mathias ReineckeHCAL – MPI meetingJan Motivation 2.Mechanical Constraints 3.HCAL Base Unit (HBU) 4.Light Calibration.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
WBS 1.04 KLM Leo Piilonen Virginia Tech. Talk Outline WBS Element Scope Performance Requirements Cost Summary Schedule Risks Summary January 2014Leo.
Prototype Assemblying, SiPM Characterization and QC
Prospect of SiPM application to TOF in PANDA
WBS 1.03 Readout Systems Specifications, Design and Acceptance
Roman Mizuk (ITEP, Moscow)
New idea for the target detector: SuperFGD
EKLM: Progress and prospects
Status of Prototype Preparation and SiPM Characterization
Backward Calorimetry For SuperB
SciFi option for neutrino target tracker
The Beam Test at Fermilab:
Prototype activities update
IFR detector mechanics
HCAL Modules -First Ideas
Comparison of CPTA and Hamamatsu SiPMs
P. Pakhlov (for D.Liventsev)
Limited Streamer Tube Project Summary
Scintillator-based endcap KL and muon
Presentation transcript:

KLM summary P. Pakhlov (ITEP) Status of Geant4 simulation of scintillator KLM Status of Geant4 simulation of scintillator KLM by Gallina PAKHLOVA (ITEP) Optimization of the endcap acceptance Optimization of the endcap acceptance by Roman MIZUK (ITEP) Read out electronics tests Read out electronics tests by Dmitry LIVENTSEV(ITEP) Mechanical structure for endcap KLM Mechanical structure for endcap KLM by Pasha PAKHLOV (ITEP) Parallel-A: KLMParallel-A: KLM Place:KEK Room: 3-go-kan seminar hall Dates:Wednesday 08 July :30 Parallel-A: KLM

Comparison with T2K Use and imrpove T2K experience. Why we have to differ?: Belle KLM strips are at least 2 times wider to reduce cost (light ~ 1/sqrt{width}) and (some of them) 1.5 times longer (light ~ exp(-length)). We need to be economical and try to collect as much light as possible to keep high efficiency at far end!  T2K: 1 mm Kuraray Y11 fiber. We are going to use 1.2 mm fiber, taking advantage of ~ 1.3 X 1.3 mm 2 SiPMs (both Hamamatsu and CPTA produce this size).  T2K: fibers have dry connection to the strips. We glue fiber to the groove to increase the light collection by : equally efficient for both central groove (Fermilab strips) and sawed groove (Kharkov strips).  T2K aluminized the polished end and got ~70% mirroring efficiency. We glue the 3M mirror to the far end; this double the light yield from the far end. T2K FGD BelleII D1.2 mirror

Strips mass production Operations, required to produce strip segment:  Quality control of fibers (automatized with fiber rewind)  Cuting fibers and polishing fiber ends (to be done simultaneoulsy for hundreds fibers);  Glueing the mirror to the far end (experience of T2K group from INR, Moscow is useful);  Glueing fiber inside the strip groove (experience from OPERA)  Glueing the SiPM housing to the strip;  Quality control of SiPMs (and database for 16k SiPMs);  Glueing the SiPM to the housing and soldering to preamplifier;  Glueing 15 strips into one segment (good for transportation, match with 16 channels electronics, 5 segments fit the existing iron gap size); Unlike T2K we do not use substrate because of different thermal expancion of polysterol and good materials for skin (G10, Al etc) Estimated time and manpower:  Strip production (12000 kg) 4 – 6 months.  Fiber production (30 km) ?? (to be checked with Kuraray)  SiPM production (16 k) ?? (to be checked with Hamamatsu and CPTA)  Glueing: ~ 20 – 30 min/strip * 16 k = (3 – 5) man-years;  Mounting segments to frame: 2 hours * 4 man/sector * 104 = 0.3 man-year preliminary To be elaborated during full size prototype production (fall 2009)

Mechanical structure The weight of one sector with RPC: Al frame 20 kg two Al covers 2 * 30 kg RPC 120 kg Plastic support str 40 kg Cables/strip masks etc 20 kg Total 250 kg The weight of one sector with scintillator strips: Al frame 20 kg Scintillator 120 kg Support str 20 kg Cables etc 10 kg Total 170 kg Al sector frame is required for transportation at B4, mounting/dismounting in iron gaps. The existing ones are obviously fit the gap well (and are not cheap): try to reuse them

Acceptance and support structure  Acceptance is similar to the present one with RPC (the inner part can be milled to circle, provided the mirrored fiber is slightly shorter)  Rigidity of the frame is provided by the net of Al profiles in x and y directions welded or screwed to the frame.  Segments are screwed to the Al profiles in few points, as polysterol thermal expansion is much bigger than that of Al.

Mounting segements  Using T-beams: the x-y profiles are welded together and to the frame; segments are inserted from the top and screwed to the profiles  Using I-beams: The x-y profiles are welded together; segments are inserted from one side; then the assembled x-y net is screwed to the frame.

With the present configuration the installation is only possible when KEKB optics near IR is dismounted. Ineterference with time schedule for KEKB installation? No chance to repair? Can this be improved? Sector installation, repair

1 kOm 1 GHz Noise spectrum: besides random noise some structures are seen (x-talk of digital  analog part?) SiPM signal with LED (5 p.e.) A p.e. ~ 2 units (1.2 mV) Test of the SiPM read out by evaluation board provided by Gary Electronics (by D.Liventsev)

Working with simple preamplifier, gain ~ 15. The noise is not increased, The signal is 30 units/ p.e. To use the borad dynamical range (-500 – 500 units) the gain should not be larger than 15. Scheme with preamplifier

With preamplifier: P.e. peaks are seen even without LED (SiPM noise) In LED spectrum (mean 4.2 p.e.) the p.e. peaks are nicely resolved. Time resolution (even with 4 p.e. only) is better than 1 ns, this is very important for fake KL rejection + provide time of flight measurement for slow KL

Conclusion on electronics The universal read out board is appropriate for our tasks, However some improvements are still required: either reduce the internal noise of the board (differential input should help a lot?) or(and) to amplifiy the SiPM signal X-talks between channels are measured and consistent with Gary’s note ~ 2-5% (not a big problem, but it is better to reduce them) HV ajustment is required. Can it be implemented in the read out board? Can we place read out board to the iron gaps near SiPM:  reliability, ageing?  heating?  optimization of geom. size?

Optimization of the Endcap Acceptance no signal, only bg? Nakano-san Roman Mizuk (ITEP, Moscow)

backwardforward K L M L A Y E R S forward: full acceptance of all layers required backward: layers 1-5: full acceptance (R inner =130cm) 6-8: R inner =150cm 9-12: 180cm more detailed optimization should be done with Belle II MC R (hit position), cm

Status for G4 simulation of scintillator KLM Galina Pakhlova, ITEP Many thanks to Leo and Hara san

Geometry structure klm_end_cap 4 klm_end_cap_sector 14 klm_end_cap_gap klm_end_cap_scint (module) klm_end_cap_air klm_end_cap_strip  75 vertical  75 horizontal

Plans by TDR Elaborate the mass production operations. Design the necessary machinery. Fix the mechanical structure! Or at least estimate reasonability of few possibilities. In the moment all sizes are flexible. If there are constraints on geometry from mechanics, it should be understood soon. Produce full size prototype using Fermilab & Kharkov strips and Hamamtsu & CPTA SiPMs (September-October). Deliver the prototype to KEK and check the compatibility with mechanical structure (January’10). Choose the producers for strips, SiPMs. Optimize the geometry using Geant4 simulation. Decision on electronics design. KLM trigger (Nakano san, Yusa san).