ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

By: MSMZ. Objective After completing this chapter, you will be able to: Explain 2 contract review stage List the objective of each stage of the contract.
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
CONTRACT COSTING Contract costing is that form specific order costing which applies where the work is undertaken according to customer’s requirements and.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Circular Letter 0062/2014 – Implementation Of Pension Arrangements For Part-time Employees As Outlined In Circular Letter 0025/2008 Gerald O’Driscoll 30.
PUBLIC SCHOOLS NSWWWW.SCHOOLS.NSW.EDU.AU Staffing under the Improving Literacy and Numeracy National Partnership.
Home Letter How to charge Design fees Ajay Vaibhav Writing Letters Estimating Fee Invoicing Fees.
Implementing the new Workload Policy Heads of School Workshop April 2010.
Proposed Program Industrial Exposure Exposure for ME Faculty Presented By The Dean, College of Engineering Science.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Alexey Barabashev Civil Servants Effectiveness Evaluation: Russian Experience Moscow, June 2011.
MALAYSIAN STANDARD METHODS OF MEASUREMENT FOR CIVIL ENGINEERING WORKS
Chapter 1 Professional, Architectural Careers, Office Practice, and Opportunities.
ISA 220 – Quality Control for Audits of Historical Financial Information
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
Next Generation Science Standards Taking Time to Get It Right “Have the courage to be patient!” Presentation Font: Ar Cena.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Engineering Economic Analysis.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
DAS: State Controller's Division1January 2010 Department of Administrative Services State Controller’s Division Updated January, 2010.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Construction Contracts and Project Delivery Methods
1 Copyright 2004 Prentice Hall FIGURE 5-2 The Relationship between Organizational Size and Number of Hierarchical Levels Number of employees
International Auditing and Assurance Standards Board Communication with Those Charged with Governance ISA Implementation Support Module Prepared by IAASB.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
INTD 55 business practices charging for your services.
Specification & Quantities Estimating
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Slavica Srdanović Ćirić Mirna Jelčić OVERALL GOAL OF THE TRAINING Improving the quality of financial reporting by the Beneficiaries resulting.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Accounting For Consignment
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 354 ARCHITECTURAL DESIGN V Spring Term ARC 354 ARCHITECTURAL DESIGN V Spring Term INTERNATIONAL BURCH UNIVERSITY DEPARTMENT of.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Process of Planning, Designing and Financing a Hospital
Financial Management and Budgeting The Details. What Is a Budget? A useful tool for keeping track of funds. A useful tool for keeping track of funds.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
16 – 11 – Y2KBy Freddy O. Esenwa (Jnr) NIGERIAN INSTITUTE OF QUANTITY SURVEYORS Q UANTITY SURVEYING AND CHALLENGES OF NATIONAL DEVELOPMENT BY FREDDY OGUGUA.
Construction Engineering 380 Chapter 13 Owner Obligations.
Iryna Savytska deputy chief of Legal department of State Employment Service (Central Office) Youth employment promoting by State Employment Service of.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
Effort 101. Effort Theory Review –Why Certify Effort –Audits –Select Definitions –Effort Management –Effort Certification –Risks of Non-Compliance.
Edexcel BTEC Level 2 Diploma in Construction Members of the Construction Team Unit 1 Structure of the Construction Industry.
Interreg Atlantic Area Programme Eligibility Rules.
Copyright © 2011 Pearson Canada Inc. Auditing: The Art and Science of Assurance Engagements Chapter 2: The Public Accounting Profession.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
WHY PART 3?.
Establishing A PATIENT Fee Schedule
REQUIREMENTS AND PROCEDURE FOR REGISTRATION OF ARCHITECTURE FIRMS
Department of Financial Services Bureau of Auditing
Establishing A PATIENT Fee Schedule
Supplementary Services Project Management Services.
The Master Budget and Flexible Budgeting
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria CALCULATION OF ARCHITECT’S REMUNERATION ACCORDING TO THE 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT A PRESENTATION PREPARED BY OJO OLUSOLA MICHAEL ARC/07/0982 FOR ARC 807: PROFESSIONAL PRACTICE AND PROCEDURE 1

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria CALCULATION OF ARCHITECT’S REMUNERATION ACCORDING TO THE 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT 1.0INTRODUCTION 1.1AIM OF PAPER 1.2OBJECTIVES OF PAPER 2.0SCALE OF FEES FOR ARCHITECT 2.1STAGE PAYMENT 2.2ARCHITECT AS PRIME CONSULTANT 2.3ARCHITECT NOT PRIME CONSULTANT 2.4REPETITIVE WORKS 2.5RESIDENT SUPERVISION FOR PRIME CONSULTANTS

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria CALCULATION OF ARCHITECT’S REMUNERATION ACCORDING TO THE 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT 2.6PROJECT MANAGEMENT 2.7REINBURSIBLE EXPENSES FOR ALL CATEGORIES OF CONSULTANTS ON A CONSTRUCTION PROJECT 2.8SCALE OF FEES FOR MULTIFARIOUS COMPLEX PROJECTS 2.9ADDITIONAL SERVICES 3.0ILLUSTRATIONS

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria INTRODUCTION The professional Scale of Fees for consultants in the Building Industry for 1996 is a revision from the 1992 edition. Issues considered include; Emphasis on the areas affecting Prime Consultants. Equal Man-Month rates for supervision of projects Ambiguities on the Scales of Fees for Quantity Surveying in Engineering Works reviewed. Reimbursable as a percentage of Estimated Total Cost (ETC) of projects. Elimination of Extra services and a careful review of what goes into Additional Services.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria AIM AND OBJECTIVES The paper is designed to teach student architects how fees are charged in the Construction Industry between 1996 and This will be achieved through the following objectives; To familiarize students with a brief history of how the 1996 Scale of Fees came into existence. To explain the usefulness of the Scale of Fees in the Construction Industry. To examine the scope and capacities of an architect’s services, as well as their corresponding payment pattern. To illustrate objective 3 using relevant examples.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria STAGE PAYMENT The proportion of the total fees payable to all categories of Consultants (including architect) at the different stages of implementation is as follows; Stage 1: should be 25% of fees based on the Estimated Total Cost (ETC) of the project. Stage 2:should be 50% of fees based on the Estimated Total Cost (ETC) of the project. Stage 3:should be 25% of fees based on the Total Construction Sum (TCS) of the project.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARCHITECT AS PRIME CONSULTANT COST OF PROJECTFEES PAYABLE AS A PERCENTAGE OF COST OF PROJECT Up to 5 million4.75% Next 10 million or part thereof4.5% Next 15 million or part thereof4.25% Next 45 million or part thereof4.0% Next 75 million or part thereof3.5% Next 150 million or part thereof3.0% Next 200 million or part thereof2.5% Balance over 500 million1.75%

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARCHITECT NOT PRIME CONSULTANT COST OF PROJECTFEES PAYABLE AS A PERCENTAGE OF COST OF PROJECT Up to 5 million3.0% Next 10 million or part thereof2.5% Next 15 million or part thereof2.25% Next 45 million or part thereof2.0% Next 75 million or part thereof1.75% Next 150 million or part thereof1.5% Next 200 million or part thereof1.25% Balance over 500 million1.0%

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria REPETITIVE WORKS NUMBER OF REPETITIONSFEES PAYABLE AS A PERCENTAGE OF COST OF PROJECT Initial Project100% First 10 Repetitions30% Next 10 Repetitions or part thereof20% Next 30 Repetitions or part thereof15% Next 50 Repetitions or part thereof12.5% Next 150 Repetitions of part thereof10% Next 250 Repetitions or part thereof7.5% Balance over 500 Repetitions5%

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TIME CHARGES All man-month rates are applicable to Time Charges on a pro- rata basis and in accordance with the following principles; 10 Months (200 Days) in a Year 20 Days in a Month; and 8 Hours in a Day

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TIME CHARGES CATEGORY OF STAFF MINIMUM YEARS OF EXPERIENCE MAN-MONTH RATES (N) (PC) MAN-MONTH RATES (N) NOT PC Chief Resident Architect/Engineer 15102,30092,400 Principal Resident Architect/Engineer 1292,40078,000 Senior Resident Architect/Engineer 669,30056,100 Resident Architect/Engineer 456,10046,200 Assistant Resident Architect/Engineer Under 446,20033,000

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TIME CHARGES CATEGORY OF STAFF MINIMUM YEARS OF EXPERIENCE MAN-MONTH RATES (N) (PC) MAN-MONTH RATES (N) NOT PC Senior Technical Officer -69,30052,800 Technical Officer-46,20033,000 Assistant Technical Officer -33,00023,100 Draughtsman-23,10016,500

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TIME CHARGES CATEGORY OF STAFF MINIMUM YEARS OF EXPERIENCE MAN-MONTH RATES (N) (PC) MAN-MONTH RATES (N) NOT PC Senior Technical Officer -69,30052,800 Technical Officer-46,20033,000 Assistant Technical Officer -33,00023,100 Draughtsman-23,10016,500