Www.ischool.drexel.edu INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop.

Slides:



Advertisements
Similar presentations
Baldrige National Quality Program 2003 Baldrige National Quality Program The Site Visit Process and Evaluating Site Visit Issue Worksheets.
Advertisements

Site Visit Review Just-in-Time Training. Pre-work and Training Judging Examiner Evaluation Process Stage 1 Independent Review Stage 2 Consensus Review.
1 CS 446 – Tutorial 6 Frid. Nov. 6 th, 2009 Implementation Tutorial.
Configuration Management
Software Quality Assurance Plan
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
EFFECTIVE GROUP PROJECTS Tips for surviving and succeeding with team assignments.
INFO 638Lecture #81 Software Project Management Cycle plan and build INFO 638 Glenn Booker.
Project Scope Management
Dr. L. K. Gaafar The American University in Cairo
Chapter 5: Project Scope Management
Fundamentals of Engineering for Honors - Team Project P. 1 Spring Quarter 2003 Engineering H193 Project Notebook & Brainstorming Sketches Week 1 Day 2.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
Simple Steps to Managing a Project Bill Kunitz and Abbie Brown July 7 th, 2009.
Course Technology Chapter 3: Project Integration Management.
Chapter 5: Project Scope Management
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Chapter 4: Project Integration Management
Project Communications Management J. S. Chou Assistant Professor.
Software Configuration Management
Brainstorming & Project Management
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
Team Launch Introduction. Real projects are large and complex, and most software is created by teams Merely throwing people together does not result in.
Copyright Course Technology 1999
How to Succeed on the NRAH Poster Project (font size = 24 pt) Sarah Vonhof, Marisa Murdock, and Amanda Klein (font size = 16 pt) Course Title and Date.
1 EDTE 316 Science Methods Fall 2007 Module 3 (Weeks 5, 6 & 7) To properly navigate through this PowerPoint, go to “View” and click on “Slide Show”
1 Chapter 4: Project Integration Management. 2 Learning Objectives Describe an overall framework for project integration management as it relates to the.
Project Scope Management Process
INFO 424 Team Project Practicum Week 7 – Feedback, User docs, Presentation tips Glenn Booker Notes partly from Prof. Hislop 1INFO.
Chapter 5: Project Scope Management Information Technology Project Management.
To navigate the slide presentation, use the navigation bar on the left OR use your right and left arrow keys. Move your mouse over the key terms throughout.
Preparing for the Launch Mohammed El- Affendi. Launch Major Tasks  The Launch is performed according to script “LAU1”, table 3.1 in the book (page 39),
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2.
INFO 637Lecture #21 Software Engineering Process II TSP Roles and Overview INFO 637 Glenn Booker.
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
INFO 425 Week 11 INFO 425 Design Problem I Week 1 Glenn Booker.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Copyright © 2008, Intel Corporation. All rights reserved. Intel, the Intel logo, Intel Education Initiative, and Intel Teach Program are trademarks of.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997.
1 PSP4a Introduction to the Personal Software Process Watts Humphrey Addison Wesley Longman c1997.
INFO 424 Week 11 INFO 424 Team Project Practicum Week 1 Glenn Booker.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
INFO 636 Software Engineering Process I Prof. Glenn Booker Weeks 1-2 – Introduction 1INFO636 Weeks 1-2.
M253 Team Work in Distributed Environments Week (3) By Dr. Dina Tbaishat.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
Ian F. C. Smith Writing a Journal Paper. 2 Disclaimer / Preamble This is mostly opinion. Suggestions are incomplete. There are other strategies. A good.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
BUS 1040 PROJECT MANAGEMENT Week 11 Agenda: Presentations Review Matrix Orgs. Monitoring and Problem Solving Close out continued and review. Final Group.
Brainstorming & Project Management ENGR Brainstorming  Proposing new ideas  Free flowing exchange of ideas  No judgment  No decisions  Build.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Reform Groups and Analyze Preliminary Designs. Schedule Week 6 Lab Small Group Presentations Form into three large teams Agree on problem statement and.
Fall CS-EE 480 Lillevik 480f06-l7 University of Portland School of Engineering Senior Design Lecture 7 Functional specifications Technical meetings.
1IT Project Management, Third Edition Chapter 4 Chapter 4: Project Integration Management.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Engineering H193 Project Notebook & Brainstorming Sketches Week.
L5 Computing Team Project Final Presentation Guidelines.
Project Management PTM721S
Working in Groups in Canvas
Project Management Process Groups
Chapter 3: Project Integration Management
Project Overview.
SDLC (Software Development Life Cycle) Role Play
Presentation transcript:

INFO 424 Team Project Practicum Week 2 - Launch report, Project tracking, Review report Glenn Booker Notes largely from Prof. Hislop 1INFO 424 Week 2

INFO 424 Week 22 Agenda Team launch Team roles Project launch report Project discussion

INFO 424 Week 23 Hints for Team Success Take responsibility –Self motivating –Self disciplined Work as a team –Everyone needs to contribute –Integration of work Engage your problem –In detail

INFO 424 Week 24 Hints for Team Success Two ideas based on the Team Software Process (Watts S. Humphrey. (2000) Introduction to the Team Software Process, ISBN X, Addison Wesley Longman.) –Team launch –Team roles

INFO 424 Week 25 Team Launch – What and Why Initial and repeated formation and organization of your team –Discussion of issues –Definition of roles –Goal setting –Establishment of common understanding Teams don’t just happen –Need to be conscious of what you are doing –Need to avoid just starting to “do the job”

INFO 424 Week 26 Team Launch Suggestions Set overall goals Discuss roles (and assign them) Determine schedule and available meeting times

INFO 424 Week 27 Team Roles – Why? Need to specialize Need to value all parts of the work Need to have a common understanding of how the work is being organized and partitioned Things that aren’t assigned don’t get done

INFO 424 Week 28 Team Roles – What? Team leader Development manager Planning manager Quality & process manager Support manager

INFO 424 Week 29 Team Leader Goals Motivate team members Resolve team issues Keep instructor informed Facilitate team meetings

INFO 424 Week 210 Development Manager Goals Produce a superior product Use team members skills to best effect

INFO 424 Week 211 Planning Manager Goals Produce a workable plan for the team and for each team member Report team status –Submit activity logs Keep an up-to-date project schedule –Submit revised versions as needed using the Schedule Update form

INFO 424 Week 212 Quality & Process Manager Goals Ensure that the team follows its process –What is your process? Ensure that the work is really getting done as it should Ensure that individual work is integrated –Requires time and effort by the team

INFO 424 Week 213 Support Manager Goals Ensure that needed tools are available to team members –Development, documentation, presentation Enforce configuration control –Manage master copy of work products –Ensure that work is properly packaged and submitted Single integrated deliverable Softcopy and hardcopy

INFO 424 Week 214 Team Roles for the Term Must have –Team leader –Planning manager Optional –Development manager –Quality manager –Support manager Consider rotating roles each cycle

INFO 424 Week 215 Project Launch Report Template is on the course site –Use the Cycle 1 Template Use –Not cumulative Different template for cycle 2-N –Structure required, use as is –Don’t make this huge

INFO 424 Week 216 Project Launch Report Contents – Cycle 1 –Product –Team –Plan Contents – Cycle 2-N –Post mortem Cycle just ended –Plan Cycle starting

Launch report - The Product The Product section describes the system or product you’re developing –Give it a good name; acronyms are optional Don’t be too flippant with the name, you might be presenting it to your Mom some day Use that name or acronym consistently –Describe briefly what it does, and its audience –List key categories of features of the product INFO 424 Week 217

Launch report - The Product –Identify the sponsor of the project, or who will be the main source of requirements for it –Identify key issues affecting development of the product, and what you’re doing to manage those issues This is your first hint at risk management for your project Don’t include issues after product release, such as its long term success INFO 424 Week 218

Launch report - The Team The next section describes your team, and the roles of each team member –Identify each team member by initials, to make your Table of Contributions concise Discuss the means your team will use for communication, exchange of draft documents, etc. INFO 424 Week 219

Launch report - The Team –Identify and discuss possible team issues Could include team technical skills, logistical or scheduling issues for meeting, language and writing skills, etc. This is risk management for your team INFO 424 Week 220

Launch report – The Plan Describe the objectives for this cycle in developing your product –What documents will you be preparing? –What types of features do you expect to implement? –What goals do you have for your team? –What goals do you have for understanding and using this development process? INFO 424 Week 221

Launch report – The Plan The rest of The Plan is the project plan and activity summary from the Project Tracking spreadsheet –For printed copies, paste them in the template May want to use a section break, and turn the page Landscape Make sure the result is legible –For electronic copies, just include the Project Tracking file with the Launch file INFO 424 Week 222

Project tracking spreadsheet The project tracking spreadsheet manages your project plan There are two main worksheets, Activity Summary and Project Plan, plus two worksheets with instructions for each INFO 424 Week 223

Project tracking - Activity Summary The Activity Summary describes what each person on your team did during each week –One entry per task, not per person –Tasks can be for the whole team – then leave the Person column blank INFO 424 Week 224

Project tracking - Activity Summary Entries for completed tasks should correspond to evidence in the Project Portfolio –Consistency between Activity Summary and the portfolio is critical Can also describe tasks that were started but not completed INFO 424 Week 225

Project tracking – Project Plan This worksheet keeps track of your plans for the project –Tasks can be individual, or for the whole team Notice that the Project Plan has a Plan section, and an Actual section The Plan part should be filled out from the start of the term –Major deadlines are from the syllabus INFO 424 Week 226

Project tracking – Project Plan You need to work backward in time to figure out when parts of assignments will be completed, put into drafts for team review, reconciled, etc. to produce those assignments The Project Plan and Activity Summary should be updated throughout the term to reflect current project status, and turned in with each assignment INFO 424 Week 227

Review report The Review report is used to capture the results of reviewing a document written by someone else in your team It can be prepared by an individual, or a group INFO 424 Week 228

Review report It has two sections, an Introduction, and Requirements Issues The Introduction describes what is being reviewed (Purpose) and gives a summary recommendation –Based on this review, what level of changes are needed to this document? None, minor, major, or complete rewrite are the choices INFO 424 Week 229

Review report Whoever wrote the review signs off on the recommendation The Requirements Issues section describes detailed feedback on the document –Designed for review of a requirements document, this section can be adapted to other kinds of documents INFO 424 Week 230

Review report The main concept for the Requirements Issues section is to provide a summary of what’s wrong with the document –Can replace the given table with columns to indicate the page number, section number, and a description of the issue –Add a fourth column to describe the disposition of the issue – was it accepted or rejected by the document author? INFO 424 Week 231

Review report The last section is for more general issues, such as those affecting a large portion of the document (tone, consistency, etc.) See Document Review Notes on the course web site for additional issues to considerDocument Review Notes INFO 424 Week 232