F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Technology Transfer: Moving R&D to Operations Presentation.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Module N° 3 – ICAO SARPs related to safety management
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Presentation of the proposed Annex 19 – Safety Management
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Enhancing Data Quality of Distributive Trade Statistics Workshop for African countries on the Implementation of International Recommendations for Distributive.
Create New feature Approved Change request Create User Stories for the feature Add User stories to Target Process backlog User Stories – 1.Create Story.
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
WMO 258 Where to from here? Jeff Wilson
ECM Project Roles and Responsibilities
Session No. 4 Implementing Service Providers SMS Implementing the State’s Safety Programme SMS Senior Management Workshop Rome, 21 May 2007.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
PLM Business Case Supporting industry partners in decision making: – Why: the business case; – What: the processes and project which are going to use PLM.
3 – 5 June Update on EASA FSTDs related matters 2008 US – Europe International Aviation Safety Conference.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
FAA International Activities
Module CC3002 Post Implementation Issues Lecture for Week 6 AY 2013 Spring.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
EXCiPACT TM EXCiPACT TM International Pharmaceutical Excipients Certification Minimize risks – maximize benefits.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
7 June 2012 Guidelines for the Compilation of Water Accounts and Statistics Guidelines for the Compilation of Water Accounts and Statistics UN Statistics.
1 18 March 2010AGNA meeting EASAC update Yves Morier.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
1 Volcanic Ash Collaboration Tool (VACT) Jeff Osiensky, NOAA/NWS Anchorage VAAC Lynn Sherretz, NOAA Forecast Systems Laboratory Greg Pratt, NOAA Forecast.
Presented to: By: Date: Federal Aviation Administration Weather R&D Research to Operations 3 rd National Surface Transportation Symposium Gloria Kulesa,
Federal Aviation Administration 2011 V&V Summit: Verification & Validation Overview Presented by: John Frederick Date:10/19/11.
NATIONAL WEATHER SERVICE DEVELOPMENT ACTIVITIES Office of the Federal Coordinator July 2000 Bethesda, MD.
FAA-NWS Aviation Weather Requirements Working Group (ARWG)
ECOS Information Session Draft EPA Quality Documents February 13, 2013 Presented by EPA Quality Staff, Office of Environmental Information For meeting.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Presented to: By: Date: Federal Aviation Administration Research To Operation FPAW Richard Heuwinkel October 9, 2008.
Lead Agency Viability Assessment Consistent with OPPAGA Report 04-65, DCF contracted with FMHI to assist in the design and implementation of a centralized.
The European Organisation for the Safety of Air Navigation V & V Some lessons learned in Europe FAA V&V Symposium, Atlantic City, October 2010 Nigel.
2005 Annual U.S./Europe International Aviation Safety Conference Improving Aviation Safety: The need for a multilateral approach Paul Lamy International.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
GDPFS related activities and projects of CAeM Mr Ian Lisk, vice-president CAeM.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
CAS/GAW/SSC March 2016 Aeronautical Meteorology.
Aircraft Fleet Management Solutions
Planning Engagement Kickoff
GSICS Procedure for Product Acceptance Update
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Implementing SMS in Civil Aviation: the Canadian Perspective
System Design, Implementation and Review
Office 365 FastTrack Planning Engagement Kickoff
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
Project Roles and Responsibilities
Obstacles and lessons learnt by the SRVSOP
Workshop on preparations for ANConf/12 − ASBU methodology
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Global Air Navigation Plan (GANP) Aviation System Block Upgrade (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Friends / Partners in Aviation Weather
IT Considerations for CPT TEE Implementation
NHTSA Research Overview: Automation, ADAS, and Human Factors
Presented to Friends & Partners of Aviation Weather
Portfolio, Programme and Project
USOAP AIG EFFECTIVE IMPLEMENTATION(EI) AAIB MALAYSIAN EXPERIENCE
Volcanic Ash Best Practice Seminar
Presentation transcript:

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Technology Transfer: Moving R&D to Operations Presentation at 2 nd International Conference on Volcanic Ash and Aviation Safety Steven R. Albersheim June 23, 2004

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 2 Agenda  Purpose  Process of the Aviation Weather Technology Transfer Board (AWTT) –Ideas and Concepts –Responsibility –Functionality –Case file –Principals –Stages  ICAO Connection  Summary

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 3 Purpose  FAA/NWS needed a means to manage and accelerate new aviation weather products into operations.  FAA/NWS needed a means to demonstrate that new products meet service requests of end users.

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 4 Before AWTT Users MeetConcepts/Ideas Target Needs Platforms Confusion Which Road do I take?

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 5 What Does AWTT Do? Users Meet Concepts/Ideas Target Needs Platforms AWTT Brings these Components Together in an Orderly Process

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 6 Responsibility AWTT Board Provides Oversight to: R&D products originating from FAA Aviation Weather Research Program Any change in product content and/or use of FAA or NWS generated product, including those from FAA F&E systems –Product availability to or use by new class of users. –New product or capability requires significant new training and/or education on content and use.

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 7 Functionality of AWTT  Provide user input to define user needs, requirements, and product design –User Needs Analysis –Concept of Use  Approve product graduations from experimental to operational based on: –Technical/scientific readiness –Operational readiness  Recommend priorities

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 8 Case File Contents Case File UNA*ConUseIP Cost/Benefit* Technical Review Report** * When available ** Includes all documentation presented to Technical Review Panel

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 9 Guiding Principals Integrate, don’t proliferate Target replacement of old with new products Use same name wherever possible Avoid contradiction between new and old products Same parameter, severity, location, time = safety Avoid new terminology that does not substantially add value Benefits: Reduced training costs Reduced user confusion

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 10 Evolutionary Stages SponsorTestingExperimentalOperational

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 11 Operations Operational means: All production/dissemination systems and processes in the initial operational configuration are 24/7 and hardened for reliability Product labeling and other guidance, as required, is in place and training underway to enable intended users to properly employ the product

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 12 AWTT Provides  Systematic Approach : –Identify how the introduction of a new product reduces proliferation of products and manage unintended regulatory impact  User requirements : –Obtain effective input from user experts on product design early on in the process  Roadmap: –Identify the path from existing services to a new product suite –Identify regulatory issues that need to be addressed –Identify the priority against other products

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 13 ICAO Connection  FAA MET Authority to ICAO for Annex 3 –FAA sets and adopts service requirements for U.S.  FAA member to International Airways Volcano Watch Operations Group –Group advises Secretary on practices and requirements for VAACs –FAA leads working group to develop U.S. position  AWTT Process implements new SARPS. –New products or changes go through AWTT –Products have to be operationally acceptable before implementation on platforms

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 14 Summary  AWTT is process to operations  FAA/NWS through the AWTT accelerates R&D products into operations.