IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.

Slides:



Advertisements
Similar presentations
Soil Exploration T.E. Civil G.E.- I.
Advertisements

Kyle Withers University of Arizona Acknowledgements: James Callegary USGS Space Grant Symposium April 18, 2009 Using Geophysical and GIS Methods to Develop.
S.Karyaeva 1, Y.Budagov, A.Dudarev, A.Krasheninnikov 1, E.Petrovskaya 1, G.Shirkov 1 – Moscow Institute of Architecture.
The explosion welding of Ti and Nb with stainless steel and full-scale tests of joints (the world first samples) B.Sabirov TTC-011,Beijing– Sabirov B.
Design Parameters.
Md.Taufique Warsi, Farooq A. Dar, Sarah Sarah, Tanvi Arora and Shakeel Ahmed CSIR-National Geophysical Research Institute.
Field Borings and Cone Penetration Testing
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Soils Investigation Soil Investigation
Site investigations and intrusive ground investigations
Core from Lake Wheeler Site 2 A’ Seven research sites are proposed for hydrologic investigation Map Number of Proposed Study Sites 1)Bent Creek Research.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 of 25 The EPA 7-Step DQO Process Step 5 - Define Decision Rules 15 minutes Presenter: Sebastian Tindall DQO Training Course Day 2 Module 14.
Eagle Mountain – Woodfibre Gas Pipeline Project Geotechnical and geophysical tests James Lota, FortisBC September 25, 2014.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
1 ONGOING DEVELOPMENTS AT JINR RELATED TO THE ILC G. Shirkov, Yu.Budagov, N.Balalykin, A.Dudarev, E.Syresin, G.Trubnikov, JINR, Dubna, Russia E.Khazanov,
Joint Institute for Nuclear Research Grigori SHIRKOV Joint Institute for Nuclear Research Dubna, Russia International Intergovernmental Organization 18.
ENGINE Leiden Combining Areal Underground and Infrastructure Data to Minimize Exploration and Economic Risks Thomas Kohl, GEOWATT AG Clément Baujard,
1 STATUS OF ILC ACTIVITY AT JINR G. Shirkov Session of RAS, Protvino, December 22, 2008.
First Results of Geological Investigations of Dubna Siting of Dubna Siting G.Shirkov.
Joint Institute for Nuclear Research Joint Institute for Nuclear Research International Intergovernmental Organization JINR and RUSSIA PARTICIPATION in.
CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,
JINR Dubna site proposal for ILC G.Trubnikov Joint Institute for Nuclear Research Sendai, March 2008.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Seismic Noise Tests: Bayou Corne, LA, USA Juan M. Lorenzo Louisiana State University.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
1 STATUS OF ILC ACTIVITIES AT JINR J.Budagov, A.Dudarev, M.Lyablin, G.Shirkov, G.Trubnikov, A.Sissakian JINR, Dubna, Russia Presented by A.Dudarev.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
SITE INVESTIGATION.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Environmental geology; definition and methods 6. Engineering and Environmental Geology.
Geological aspests of traffic engineering - a case study 5. Villumsen, A. et al. 2007: Road Construction in Greenland - The Greenlandic case. – Arctic.
CFS-ADI Joint Meeting University of Tokyo April 8-10, 2014 Session 8 - Power Usage and Site Requirements V Kuchler, A Enomoto.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Birla Vishvakarma Mahavidyalaya Gujarat Technological University
1 Status of the ILC activity at JINR PAC for Particle Physics 29 January 2009 G.V. Trubnikov.
Mineral Resources EES – Chapter 19.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Topic: soil investigation
Recent advances in Ti and Nb explosion welding with stainless steel for 1.8K operating (ILC Program) LCWS11, Granada – Sabirov B. JINR group in the frame.
Geotechnical Engineering II
Andrzej Kotyrba Central Mining Institute Katowice, Poland
Dept. of Civil Engineering
SUB SURFACE INVESTIGATION
LCWS11 AWG9 PARALLEL SESSION SUMMARY
AMERICAN LINEAR COLIDER PHYSICS GROUP Impressions of the Dubna Site
Civil Engineering for FCC-eh IR
CLIC Civil Engineering Update
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
JLEIC Accelerator R&D Meeting
Presentation transcript:

IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20

Dubna Kimry Taldom Volga PRELIMINARY GEOLOGICAL ENGINEERING SURVEY (OCTOBER - NOVEMBER 2008) drilling of 3 wells in depth of m with full core extraction; selection of 40 monoliths of soil and 16 samples of disturbed soil for laboratory analysis; selection of 10 probes of ground water for chemical analysis; gamma-ray logging, thermometry, vertical seismic profiling, surface seismic survey 35 points of vertical electric sounding; power line 500kV well 3-08 well 1-08 well 2-08 The aim: to confirm the presence of thick solid stratum of moraine loam A. Dudarev (JINR), IWLC 2010, October 20

DETAIL OF THE GEOLOGICAL CUT FOR THE DUBNA SAMPLE SITE TOGETHER WITH SOIL BORING PROFILES The obtained data (geological structure and hydro-geological conditions, geotechnical soil properties, etc.) are favorable for placing the linear collider in the investigated territory. The results contained in the GSPI Soil Boring Report supports the positioning of a site that is compatible with the current ILC criteria in the Dubna area and supports a near surface design solution. A. V. Kurnaev et. al. Report on the Results of the Preliminary Geological Engineering Surveys Along the Supposed Route of the International Linear Collider (ILC) in Taldom Area of the Moscow Region, GSPI, Rosatom, Moscow (2008). A. Dudarev (JINR), IWLC 2010, October 20

SCOPE OF WORK THAT COULD BE PROVIDED TO GSPI 1. Identification of Optimal ILC location for Dubna sample site. Based on the results of the preliminary engineering-geological investigations and topographic maps of the Moscow region optimal ILC location will be defined. 2. Additional field investigation for site definition (including geophysical investigation, boring of additional wells soil samples withdrawal, laboratory investigation etc.). 3. Alternative tunnel configuration for shallow siting. Cost estimation. The aim of this task is to evaluate the possibility and provide cost estimation based on a work breakdown structure (WBS). 4. Analysis of life safety and egress strategy of alternative tunnel configuration. RESULTS OF GSPI GEOLOGICAL INVESTIGATION Joint ILC GDE & JINR Report (coming soon): “Dubna Site Investigation: an Evaluation of a Proposed Site for the International Linear Collider near Dubna, Moscow Region, Russia” A. Dudarev (JINR), IWLC 2010, October 20

JOINT JINR-GSPI PROJECTS 2010 Identification of Optimal ILC location for Dubna sample site 2008 Report on the results of the preliminary geological engineering surveys NEW ! A. Dudarev (JINR), IWLC 2010, October 20

Main requirements for optimal location: minimal populated territory; engineering infrastructure of the territory (roads, power sources, etc.); results of preliminary geological survey IDENTIFICATION OF OPTIMAL ILC LOCATION FOR DUBNA SAMPLE SITE Main goal of the work: to restrict size of the area for further possible geological survey A. Dudarev (JINR), IWLC 2010, October 20

OTHER ILC ACTIVITY AT JINR Explosion welding of bimetal tubes Ti-SS and Nb-SS (in collaboration with RFNC (Sarov), INFN (Pisa) and FNAL ) Yu.Budagov et. al. Superfluid He testing of titanium-stainless steel transitions fabricated by explosive welding, JINR Preprint E , 2009, 12. A. Dudarev (JINR), IWLC 2010, October 20

THANK YOU FOR ATTENTION