Texas Nodal March 20061 Texas Nodal NMMS Requirements By John Adams ERCOT.

Slides:



Advertisements
Similar presentations
GPA Renewable Energy Resource for Guam Power Authority
Advertisements

June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
1 Texas Nodal Texas Nodal Program Implementation TPTF June 6, 2006 Agenda.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program CRR Detailed Design Document Review Process Compiled.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
TEXAS NODAL Board of Directors Austin, Texas July 15, 2003.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
Texas Nodal Timeline Options, TPTF Jul 11, Timeline Options Trip Doggett TPTF
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 Texas Nodal Critical Path Update TPTF Date xxx.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
COMS Nodal Commercial Systems Project Update COPs Meeting May 2007 By Bill Barnes and Justin Rasberry.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
1 Texas Nodal Presentation Board of Director’s Meeting September 20, 2005.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
Network Model Management System (NMMS)
Texas Nodal Market Implementation Metric Sub Group Readiness Advisor January 30, 2006.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 EDW Update to TPTF November 5, 2007 Janet Ply EIS Nodal EDW Project Manager.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
February 12, 2009 ROS ERCOT and TSP activities for Planning Model Go-Live.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
2009 Project Prioritization Troy Anderson ERCOT Program Management Office February 20, 2008.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Nodal Planning Model Process and Data Set A case use June 28, 2010 Planning Working Group.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Integration Update October 24, 2006 Daryl Shing, Enterprise.
July 7, 2008 TPTF Texas Nodal Market Implementation: Metrics Revisions Jerry Sullivan.
March 4, 2008 TPTF Texas Nodal Market Implementation EMS CIM Importer update David Hackett, EMS PM.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Ancillary Service Qualification Self-Certification approach ROS Discussion March 16,
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Texas Nodal Market Implementation Transition Planning Task Force Metric Framework Review Readiness Advisor January 24, 2006.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
The Network Model Management System
Presentation transcript:

Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT

Texas Nodal March Agenda Overview of NMMS Requirement Comments (Buckets) Creation of Nodal Model Forum Where are we on the NMMS requirements timeline Does Texas Nodal require the proposed NMMS? Other NMMS implementations Nodal Modeling from a transmission planning view NMMS Requirements Q&A

Texas Nodal March Overview of NMMS Requirement Comments Category of Comment/resolution KeyNumber of submittals Proposed Change to document/ accepted CG115 Comment received but no change to document CM58 Question or Comment which is a detailed design question DD44 Comment which seems to require nodal protocol change PI2 Outside scope of NMMSSC1

Texas Nodal March Overview of NMMS Requirement Comments NMMS is not a pre-requisite to Nodal Transmission Network modeling difficult, and needs to be carefully coordinated with the transmission provider involved; A central database which builds power flow cases is an inherently risky undertaking which has a high risk of building cases which will not converge. The proposed NMMS processes make planning more difficult for ERCOT TDSP’s. More detail describing requirements is desired Specific technical requirements should be added

Texas Nodal March Creation of a Nodal Modeling Forum TPTF focus is on nodal protocol compliance TPTF Planning Principle: “ERCOT shall develop a process to identify areas where the design contemplated by the protocols is not feasible, cost effective, or the most effective” To address the above TPTF planning principle ERCOT proposes the creation of a Nodal Modeling Forum

Texas Nodal March Where are we on the TPTF Systems Specification, Procurement and Development Track? Nodal Protocols System Conceptual Design Document Detailed Design Engage NMF team to address feasibility, cost and effectiveness Engage NMMS Vendor Business Requirements TPTF Approval TPTF Approval TPTF Comment ERCOT is positioned to engage a NMMS vendor and will utilize the drafted NMMS Business Requirements. The ERCOT Nodal Transition Plan requires TPTF to approve the Business Requirements document as being in compliance with protocols before they are used. ERCOT envisions a collaborative effort between the NMMS Vendor, Market Participants (via NMF) and ERCOT staff in the development of the System Conceptual Design Document. NMMS feasibility, cost and effectiveness issues can be addressed during the development of the System Conceptual Design Document.

Texas Nodal March Does Texas Nodal require the proposed NMMS? 1.To meet requirement for a model that contains all changes over a period of time and the changes can be implemented in the model as they are scheduled (Timeline). 2. To meet requirements for data consistency between Network Operations, Annual Planning, and CRR models

Texas Nodal March Timeline Options: a)CIM incremental Model updates. b)Pseudo switches. We selected CIM incremental Model updates. Using pseudo switches in the model is very labor intensive and error prone. Other users are seeking methods to move away from pseudo switch usage.

Texas Nodal March Consistency Options: a)Common database structure b)Manual comparisons We selected common Database structure We presently do manual comparisons and they are very manpower intensive.

Texas Nodal March What is going on in the modeling arena Others interested in CIM based modeling software: –WECC has RFP out for CPSM (NERC CIM based Common Power System Model) –MISO has RFP out to combine Operations and Planning database –Transpower (New Zealand) has purchased Nodal software including CIM based package combining Planning and Operations database –Transmission System Modeling Builder (TSMB) Project by EPRI

Texas Nodal March Nodal Modeling from a transmission planning view –Data & effort similar NowWith NMMS Load data provided via Annual Load Data Request (ALDR) process Same Generation Data gathered via Generation Interconnection or Change Request process and via asset registration Same Detailed transmission project data and timing is provided via the (TPIT) workbook Updated on a quarterly basis Detailed project data and timing provided via NMMS interface. Updated as available. ROS SSWG currently produces eight seasonal next year cases (Data Set A) and six future year cases (Data Set B)Updated on an annual and quarterly basis Same? ROS DWG produces flat start cases annuallySame ROS SPWG produces short circuit cases annually Same Consistency and application of data is ongoingSame TCR process builds cases and assesses expected additional transfer capability across CSC interfaces. CRR process builds at least 12 monthly cases looking 12 months ahead and assesses point- point capability

Texas Nodal March NMMS Requirements Q&A